Public Health Engineering Department-PHED has published Tender For Construction Of Independent Water Works For Village Nimana Group Of 2 Nos. Scheme Nimana And Sondhi Tehsil And Distt. Jhajjar. ‘’Const. Of Raw Water Sump, Const. Of 2 Nos. Rcc S/S Tank, Const. Of 2 Nos. Rcc Suction/Scour Well, Const. Of 1 Mld W. Submission Date for this Tender is 13-03-2024. Road Work Tenders in Jhajjar Haryana. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Providing, fixing and commissioning Vacuum Gas Chlorination system of rating 2000 grams per hour as designed having the control of gas 20th part of max. dose and which can start working automatically on switching in the supply of water at the water works site consisting of vacuum regulator E-10K (EQUATE/ Wand USA Make)/ Supreme Technology including safety equipment consisting of chlorine mask with canister, chlorine leak detector with hooter and sensor, 2 nos. filled of chlorine cylinders of capacity 100 kg duly certified and approved by BIS and explosive department Govt. of India, spanner with cylinder opening key, 2 set connectors, iron cage guard the system including complete installation of the equipment`s and all other works contingent thereto as per satisfaction of Engineer-In-Charge |
2 | Providing and Fixing for 30 Watt LED Light |
3 | Providing and Fixing LED Light 20 Watt |
4 | PUMPING MACHINERY/RAW WATER PUMP / Supply and erection of Horizontal spindle split casing type pumping sets minimum Four (4) Star rating duties coupled to AC squirrel cage induction type motor with 1440 RPM, 3 phase 50 Hz and accessories as described in Schedule No.II complete in all respect with priming arrangement with complete base frame. Raw Water Pump set 12 Mtrs Head 5 BHP. |
5 | WATER TREATMENT PLANT (WTP) Design, construction, testing and commissioning of 1.00 MLD capacity Water treatment plant including inlet channel, Alum dozing, Flash mixing, Clarifloculator, filter box, over head Reservoir for back wash, waste water tank including all civil work, pumping machineries and electric cabling, control panels, entire piping network of suitable size laying the DI pipe from raw water pump to inlet box of WTP, WTP to CWT and Suction Well for CW including DI specials, suitable size Sluice valves, Hodies, manhole covers, air scour equipment, chemical house including chlorination equipment and arrangement of flow measurement and sand bed complete in all respects as per NIT (Sluice valves of make IVCAWAG). |
6 | Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 monthsdefect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 1) Operation and maintenance during defect liability period after 3 month trial run period (operation only) |
7 | Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 2.)Operation and maintenance for 1st year |
8 | Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 3.)Operation and maintenance for 2nd year |
9 | Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 4.)Operation and maintenance for 3rd year |
10 | Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 5.)Operation and maintenance for 4th year |
11 | Operation and Maintenance of water works for complete scope of work mentioned in the DNIT and of whole existing water supply scheme in the village Disinfection material supplied by the PHED as per schedule-IV for a period of 5 years after 12 months defect liability period and 3 months trial run period. (will be charged to the A/mtc estimate) complete in all respects as per approved NIT. 6.)Operation and maintenance for 5th year |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy