Council Of Scientific And Industrial Research-CSIR has published Tender For Operation And Maintenance Of Central A.C. Plant, Cold Rooms Refrigeration Machines, Hvac System Bio Safety Lab - 2 And Animal House, Vrf Air Conditioning Systems, Water Softening System With Associated Equipments At Csir - Igib, Mall Road,. Submission Date for this Tender is 28-02-2024. Air Conditioner Tenders in delhi Delhi. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | SUB HEAD - I |
2 | PART - A A) Operation &Maintenance of Central Air Conditioning System 200 TR X 2 Nos. (excluding comprehensive Maintenance of water chilling machines of system Make - YORK which is to be quoted separatelyin Sub Head -II, Item No. 1)as per details of system for the scope of work for Sub Head - I, Part -A of NIT please refer page no. 3PART - B (a) Operation, routine check up and up keep of02 Nos. cold storage Units, 2 TR capacity each with all associated equipment for 24 hrs. per day as required = 02 Nos. cold storage x 02 Nos. M/C = 04M/C = 01 Jobs. For details of system refer Sub Head -II, Item No. 2 (b) Operation , routine check up and up keep of BSL-2 HVAC System For details of system refer Sub Head -II, Item No. 3 (c) Operation, routine check up and up keep of VRF Airconditioning System of Server Room (R.No. 504) as per details in Annexue-III For details of system refer Sub Head -II, Item No. 4(d) Operation, routine check up and up keep of VRF System / Split Air Conditioner installed in Container. For details of system refer Sub Head -II, Item No. 5 (e) Operation, routine checkup and up keep of VRF Airconditioning System of Deep Freezer (-80°C) Room. For details of system refer Sub Head -II, Item No. 6 (f) Operation, routine check up and up keep of water treatment plant as per site requirement to achieve the desired hardness 0 to 50 ppm for the inlet water having hardness approx 500 ppm. For details of system refer Sub Head -II, Item No. 7 |
3 | SUB HEAD - II |
4 | Comprehensive Annual Maintenance of 02 Nos. x 200 TR, Screw Type Water Chilling Machine(Make - YORK): Comprehensive Annual Maintenance (routine, preventive, break down) of 200 TR Screw type water Chilling Machine i.e. all inclusive of consumable materials, spare parts, refrigerant, compressor oil ,Tool and plants, descaling/Cleaningof condenser & chiller as required, man power skilled/unskilled as required for above mentioned chilling machine complete as per service/maintenance manual of the manufacturer.For further details refer NIT Sub Head - II,Scope of work Item No. 1 on page 10 TO 12 IMPORTANT:i) This part of contract will start w.e.f. 08.06.2024 because presently this contract is running with other agency and will expire on07.06.2024ii) Payment against work done shall be released on pro-rata basis for the duration of contract. |
5 | Comprehensive Annual Maintenance Contract of Refrigeration Machines 04 Nos. (Make - Blue Star) of 02 Cold Rooms: Comprehensive Maintenance (routine, preventive, break down) of Refreigaration Machines of two cold rooms i.e. all inclusive of consumable materials, spare parts, refrigerant, compressor,compressor oil,Tool and plants, Chemical Cleaningof condenser & evaporator, temperature monitoring deviceas required ,man power skilled/unskilled as required for above mentioned coldRooms (each cold roomhas two refrigeration units) complete as per service/maintenance manual of the manufacturer. For further details refer NIT Sub Head - II, Scope of work Item No. 2 on page 13 TO 14IMPORTANT:i) This part of contract will start w.e.f. 08.06.2024 because presently this contract is running with other agency and will expire on07.06.2024 ii) Payment against work done shall be released on pro-rata basis for the duration of contract. |
6 | Comprehensive Annual Maintenance Contract of Bio Safety Lab : Comprehensive Maintenance Contract for Air Conditioning System of Bio Safety Lab for details of system. For further details refer NIT Sub Head - II,Scope of work Item No. 3 on page 15 TO 16 IMPORTANT:i) This part of contract will start w.e.f. 01.04.2024 because presently this contract is running with other agency and will expire on31.03.2024ii) Payment against work done shall be released on pro-rata basis for the duration of contract. For further details refer NIT Sub Head - II, Scope of work Item No. 3 on page 15 TO 16 |
7 | Comprehensive Annual Maintenance Contract of VRF Air Conditioning System installed for -80° C Deep Freezers room in Basement at CSIR - IGIB, Mall Road as under:Comprehensive Maintenance Contract of following Air Cooled Side Discharge Type Outdoor Units Equipped with 100% Inverter Type Highly Efficient Compressors, with cooling mode only, low noise variable speed condenser fan with DC Motor, designed especially for Indian climatic conditions filled with eco friendly refrigerantR410a complete in all respect and suitable for working with 415 V 50 Hz Power supply. 16 HP 02 Nos. unit (for Cooling Only) with Dual Compressor and ceiling mounted ductable type Indoor unit equipped with Cordless Remote Controller, Communication Cabling, washable synthetic media pre-filter, fan section with low noise fan/dynamically balanced blower, multispeed motor, Cooling coil section with DX copper coil, electronic expansion valve, outer cabinet, vibration isolators, drain pan, other necessary supports etc. complete in all respect having indoor units as under :8 TR - 02 Nos. 4TR - 02 Nos.For further details refer NIT Sub Head - II, Scope of work Item No. 4 on page 17IMPORTANT : i) This part of contract will start w.e.f. 01.05.2024 because presently this contract is running with other agency and will expire on 30.04.2024 ii) Payment against work done shall be released on pro-rata basis for the duration of contract. |
8 | Comprehensive Annual Maintenance Contract ofVRF Air Conditioning System installed for prefabricated container at CSIR - IGIB Mall Road : Comprehensive Maintenance Contract of following Air Cooled Side Discharge Type Outdoor Units Equipped with 100% Inverter Type Highly Efficient Compressors, with cooling mode only, low noise variable speed condenser fan with DC Motor. VRF system filled with eco friendly refrigerantR410a complete in all respect and suitable for working with 415 V 50 Hz Power supply as under.a) Air cooled condensing units (Out Doorunits) with Copper coil , axial flow fan all assembled in a steady sheet metal cabinet complete in all respect :10 HP -01 No. b) Ceiling suspended Indoor units with Dx-cooling coil, copper tubes with aluminium fins, centrifugal blower with drive motor, control wiring, cooling thermostat and Air Filters etc. complete in all respect: Ductable Split AC 3 TR - 1 No For further details refer NIT Sub Head - II, Scope of work Item No. 5 on page 18IMPORTANT : i) This part of contract will start w.e.f. 01.05.2024 because presently this contract is running with other agency and will expire on 30.04.2024 ii) Payment against work done shall be released on pro-rata basis for the duration of contract. |
9 | Comprehensive Annual Maintenance Contract of Inverter typesplit Air Conditioners ductableunitsof6.25 HP (Make : Blue Star)with refrigerant R410 gas, micro processor based ON/OFF, electrical wiring, single phase preventer, HP/LP cut off, Communication cable etc. along with Programmable timer for automatic changing over of operation of AC units complete in all respect,working on 3 Phase power supply and consisting of: a) Air cooled condensing units (Out Doorunits) with Copper coil , axial flow fan all assembled in a steady sheet metal cabinet complete in all respect. b) Ceiling suspended Indoor units (including hanging supports) with Dx-cooling coil, copper tubes with aluminium fins, centrifugal blower with drive motor, control wiring, cooling thermostat and filters etc. complete in all respect. For further details refer NIT Sub Head - II,Scope of work Item No. 6 on page 19 |
10 | Comprehensive Annual Maintenance of water treatment plant with all necessary consumables such as fine salt, chlorine etc. as per site requirement to achieve the outlet water quality of desired hardness 0 to 50 ppm for the inlet water having hardness approx 500 ppm.For further details refer NIT Sub Head - II,Scope of work Item No. 7 on page 20 TO 22IMPORTANT: i) This part of contract will start w.e.f. 01.02.2025 because presently this contract is running with other agency and will expire on31.01.2025ii) Payment against work done shall be released on pro-rata basis for the duration of contract. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail