Public Works Department-PWD has published Tender For Construction In 02 Lane Of Approach Road To Proposed 2Nd Vahini Special Security Force Building In District Gorakhpur In Fy 2023-24 (Lot No -5/9). Submission Date for this Tender is 15-03-2024. Road Work Tenders in gorakhpur Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 19-Feb-2024 | Escalation Factors | Other | 24-02-2024 |
2 | 22-Feb-2024 | Date1 | Date | 29-02-2024 |
3 | 29-Feb-2024 | Date3 | Date | 05-03-2024 |
4 | 05-Mar-2024 | Date4 | Date | 07-03-2024 |
5 | 07-Mar-2024 | Date5 | Date | 09-03-2024 |
6 | 09-Mar-2024 | Date6 | Date | 12-03-2024 |
7 | 12-Mar-2024 | Date7 | Date | 13-03-2024 |
8 | 13-Mar-2024 | Date8 | Date | 14-03-2024 |
9 | 14-Mar-2024 | Date9 | Date | 15-03-2024 |
Sl. No. | Item Description |
1 | Cleaning and grubbing road land including uprooting rank vegitation grass, buses, shrubs, sapling and trees grit upto 300mm , removal of stumps of tree cutearliar and disposal of unserviceable material to be used or auction , upto a lead of 1000 M including removal and disposal of top organic soil not exceeding 150 mm in thickness . as per Morth Specification 201 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
2 | Construction of embankment with approved materials obtained from borrow pits with all lifts and leads , transporting to site ,spreading,grading to required slope and compacting to meet requirement of table 300-2. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
3 | Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits area lead up to 10 Kmwith all lifts & leads, transporting to site, spreading, grading to required slope and compacted to97% proctor densityrequirement of table No. 300-2 MORTH specification no. 305 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
4 | Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
5 | Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with paver in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density. as per MoRTH Sp. 406 (4.14) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
6 | Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70kg/sqm using mechanical means. as per MoRTH Sp. 502 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
7 | DBM G-2 Providing and laying dense graded bituminous macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5per centby weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
8 | Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30kg per sqm on the prepared bituminous surface cleaned with mechanical broom. as per MoRTH Sp. 502 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
9 | Bituminous Concrete G-2 Providing and laying bituminous concrete withhigher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4per centof mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
10 | P/L of Interlocking concrete block pavement Zig - Zag having thickness 80 mm as per drawing and technical specification clause 1504 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
11 | Providing and laying Filter material underneath pitching in slopes complete as per MORTH specification clause No. 2504 (15.4) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
12 | Providing and laying Pitching on slopes laid over prepared filter media including boulder apron laid dry in front of toe of embankment complete as per drawing and Technical specificationsas per MORTH specification clause No. 2504 (15.5) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
13 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material.(lead 10 km) as per MoRTH Sp. 304B(i) Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
14 | Plain cement concrete M-15 in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. As per MoRTH Sp. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
15 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per MoRTH Sp. 1600 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
16 | M-25 Reinforced Cement Concrete in box culvert complete as per Drawing and Technical Specification As per MoRTH Sp. 1500, 1700 & 2100 Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |
17 | M.S or iorn work in angle iorn for joint in Box Culvert including Supply of matrial labour T&P etc Required for proper compltion of work size 100x100x8 mm si no 503. Complete in all respect as per direction of E/I. (Including Labourcess but Excluding GST). |