| 1 | Earth work of foundation in ordinary soil/sandy/ loam/clay or sand including lift upto 1.5 meter and lead upto 30 meter and including filling, watering, ramming of excavated earth into the trenches or upto the space and sides of the foundation trenches or into the plinth and removal and disposal of surplus earth as directed by Engineer in-charge upto a distance of 30 meter from the foundation trenches. |
| 2 | Earth work in excavating other rocks by blasting and disposal of excavated materials as per direction of Engineer-in-charge and making bed slope and side slope as per drawing & specification including all lead, lift, labour and T&P etc. complete in all respects. |
| 3 | E/w filling in Column mixed 5% cement with good soil well compatected at a small water content total lead upto 1.0 km. by truck or tractor trolley Along with Proper dressing & compaction including all cost of material, labour, T&P, taxes etc. required for proper completion of work. |
| 4 | Local sand filing below C.C. work with cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 5 | Centering and Shuttering fo R.C.C. work including rent of shuttering material, labour, T&P, taxes etc. required for proper completion of work. |
| 6 | Laying C.C. (1:3:6) in foundation with cement, coarse sand and hard stone ballast including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 7 | Proding & laying 25 mm. thick D.P.C. with cement concrete consisting of cement, coarse snad and 12 mm graded stone 1:1.5:3 with water proofing materials |
| 8 | Carriage, Cutting, bending, binding & placing of steel Reinforcement and binding wireincluding all cost of material, labour, T&P, Taxes etc., required for proper completion of work. |
| 9 | Laying Cement concrete 1:1.5:3 (M-20) grade for beam, slab, colum etc. including all cost of material, labour, T&P, Taxes etc., required for proper completion of work. |
| 10 | Brick Massonary work with (1:4) cement & coarse sand mortarincluding all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 11 | Cement sand (1:4) plaster on brick work including all cost of material, labour, T&P, Taxes etc. required for proper completion of work. |
| 12 | Fabrication of mild steel/iron work in grill, Gates, railing, door and window frams including cutting, driling, welding/revetting & hinges, where necessary and fixing in position incuding cost of all material, labour, T&P etc. required for proper completion of work with one coat of red oxide primer. |
| 13 | Providing & fixing in position collapseble steel shutters with vertical channels 20x10x2 mm. and braced with flat iron diagonals 20x5 mm. size with top and bottom rails of T-iron 40x40x6 mm. with 38 mm. dai stell pulleys with bolts, nuts, locking arrangemnt, stoppers handles complete including applying one coat of material, labour, T&P etc. required for proper completion of work. |
| 14 | Finishing wall with water proofing cement paint of approved make such as super snowcem, Durroocem, roblecem, Gutta cem, Super cem quality and of required shade on new wall surface (two coats) over one coat of white cement primer to give an even shade after thoroughly brushing the surface to remove powdered materials including curing and cost of materials. |
| 15 | Painting two coat of synthetic enamel paint on new surface (excluding cost of primer) superior quality such as luxol Higloss, apcolitem superlac, Dulux, including cost of all material, labour T&P etc. required for proper completion of work. |
| 16 | Construction of granular sub-base providing well graded material, spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotavator at OMC and comacting with smooth whell roller to achive the desired density complete as per technical specification clause 401. |