| 1 | Carrying outmonitoring of water treatment plant activities and water sample analysisas per the below details and as directed by Engineer-in-Charge.System 1: Monitoring the operation ofpumps,valves,gearboxes, air blowers and other equipment in water treatment plant. Monitoring the water treatment plant activities such as water level in sump & overhead tanks, Chemical dosing, chlorination, mixing disinfectants/coagulants, parameters of equipmentwhile running, backwashing and equipment cleaning etc., Carrying out water sample collection at various locations, water sample analysis, recordingdatas, maintaining lapinstruments and coordinate the department personnel for all the above work.1 System X 1 Operation X 313 Days = 313 OperationsNote: 1. Rate shall be quoted for each operation for a net working time of 8 (Eight) hours per operation per day.2. Tenderer shall note thatone operationinvolvesoneormore or allactivitesofdescription mentionedabove for a net duration of Eight hours in a day.3. Work shall be carried out as per detailed scope of work.4. Contractor shallengage one skilled labour for each operation. |
| 2 | Operation and attending to the following works in the treatment complex, raw water sump, treated water sump, aerator, flash mixer, flocculator, tube settler, rapid sand filter bed, chemical dosing system, back wash system, overhead tank, recovery tank, sludge tank, sludge drying bed, and other equipment in water treatment plant on all days of the year (round the clock shift), including holidays as detailed below and as directed by the engineer-in-charge.System 1 :- Water treatment complex : Operations of Pumps, Motorised valves, Manual valves, Air blowers and other equipment situated in the Treatment Complex to operate the treatment plant as per timings, monitoring power supply of equipment while running and co-ordinating the department personnel for the above works. System 2: Raw & Treated Water Sump, Overhead Tank, Aerator, Flash Mixer, Floculator, Recovery Tank, Sludge Tank, Sludge Drying Bed,Chemical dosing system, and other equipment : Operation of pumps, motorized valves, manual valves, agitator-geared motors and other equipment for the above system , filling UG sumps, mixing disinfectant and coagulants, monitoring power supply and pumps while running, and coordinating the department personnel for the above works as per timing.2 Systems X 3 Operations X 365 Days = 2190 OperationsNote:1. Rate shall be quoted for each operation for a net working time of 8 (Eight) hours per operation per day.2.Tenderer shall note thatone operationinvolvesoneormore or allactivitesofdescription mentionedabove for a net duration of Eight hours in a day.3. Work shall be carried out as per detailed scope of work.4. Contractor shallengage one Semi Skilled labour for each operation. |