| 1 | CENTRALIZED MATERIALS |
| 2 | ST pole 11 Mtr Long |
| 3 | ST pole 13 Mtr Long |
| 4 | PCC Pole 805 Mtr Long |
| 5 | Top Channel MS 100x50x2240 mm Long |
| 6 | M.S. Channel 125x65x1300 mm (T-off) |
| 7 | M.S.Channel Dropper100x50x6mm 2028mm Long |
| 8 | ACSR Weasel conductor |
| 9 | 11 K.V. Disc InsulatorT&CType 4500Kg. With Fitting |
| 10 | 11 K.V. Pin Insulator With pin Fitting |
| 11 | 11 KV XLPE Cable3 X 120 Sq mm |
| 12 | 11 KV V-typeCross Arm |
| 13 | Stay Loop Insulator |
| 14 | Stay Wire 7/8 SWG |
| 15 | Stay Complete |
| 16 | Earthing Complete |
| 17 | GI Wire 8 SWG for Guarding |
| 18 | GS/GI Earth wire 6 SWG |
| 19 | MS Angle 75x75x2028 MM :Long (CVT Base) |
| 20 | MS Angle For Guarding |
| 21 | MS Angle Cross Brecing |
| 22 | 11 KV TPMO |
| 23 | 200/100/5A O/G 11 KV VCB Pannel |
| 24 | 600/300/5A 350 MVA I/C 11 KV VCB |
| 25 | DE-CENTRALIZED MATERIALS |
| 26 | Cross Arm Holding Clamp With Nut & Bolt |
| 27 | Danger Board With Nut & Botlts |
| 28 | Stone Pade (300x300x75)mm |
| 29 | F- Bracket With Nut & Bolt |
| 30 | Barbed Wire |
| 31 | Top, T-Off & Cross Brassing Asngle Clamp With Nut & Bolt |
| 32 | Nut& BoltWith Washear |
| 33 | 3x120 SQ MM 11 KV Cable Jointing Kit |
| 34 | Number Plate With Clamp |
| 35 | Gi Pipe 6\" Dia |
| 36 | PG Clamp for Conductor Nut &Bolt |
| 37 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 38 | Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.(Depth of Grouting Pole 1500 mm & Pole Pit Dia 500mm, Copping of each of STP Pole 300mm) |
| 39 | Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & other required works with by jumpering with E bracket & Pin Insulator.(Depth of Grouting Pole 1500 mm & Pole Pit Dia 500mm, Copping of each of STP Pole 300mm) |
| 40 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) (Depth of Grouting Pole 1500 mm & Pole Pit Dia 500mm, Copping of each of STP Pole 300mm) |
| 41 | Grouting of stay with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) ( Grouting of Stay with 800mm Depth & Pit Dia 500mm ) |
| 42 | Earthing Complete |
| 43 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of Weasal Conductor, binding with insulators & jumpering. |
| 44 | 11 KV XLPE Cable3 X 120 Sq mm |
| 45 | Installation of 200/100/5A O/G 11 KV VCB Pannel |
| 46 | Installation of600/300/5A 350 MVA I/C 11 KV VCB |
| 47 | Installation of11 KV TPMO |
| 48 | Stay Loop Insulator |
| 49 | MS Angle For Guarding |
| 50 | Cable Layning Charg along with Cost of Bricks and Sand |
| 51 | Hord Rock Broken |
| 52 | Tree cutting Compensation |