| 1 | CENTRALIZED MATERIALS |
| 2 | ST pole 11 Mtr Long |
| 3 | PCC Pole 8.5 Mtr Long |
| 4 | MS Top 100x50x2240 MM Long |
| 5 | MS Channel 125x65x1300 MM (T-off) |
| 6 | MS Channel Dropper 100x50x6 MM 2028 MM Long |
| 7 | 10 MVA T/F |
| 8 | 11 KV VCB 200/100/5A O/G VCB |
| 9 | MS Angle (T/F Base) |
| 10 | ACSR Weasel conductor |
| 11 | 11 K.V. Disc InsulatorT&CType 4500Kg. With Fitting |
| 12 | 11 K.V. Pin Insulator With pin Fitting |
| 13 | 11 KV XLPE Cable3 X 300 Sq mm |
| 14 | 11 KV XLPE Cable3 X 120 Sq mm |
| 15 | 11 KV XLPE Cable3 X 70 Sq mm |
| 16 | 11 KV V-Type Steel X-Arm |
| 17 | 11 KV V-typeCross Arm |
| 18 | Stay Loop Insulator |
| 19 | Stay Wire 7/8 SWG |
| 20 | Stay Complete |
| 21 | Earthing Complete |
| 22 | GI Wire 8 SWG for Guarding |
| 23 | GS/GI Earth wire 6 SWG |
| 24 | MS Angle 75x75x2028 MM :Long (CVT Base) |
| 25 | MS Angle For Guarding |
| 26 | Gi wire 6 SWG & 10 SWG for Guarding |
| 27 | Guarding X-Arm (MS Angle 65x65x6 MM) 1.6 Mtr |
| 28 | MS Angle Cross Brecing |
| 29 | 11 KV TPMO |
| 30 | 3x70Sq mm 11KV Cable Jointing Kit |
| 31 | DE-CENTRALIZED MATERIALS |
| 32 | Cross Arm Holding Clamp With Nut & Bolt |
| 33 | Danger Board With Nut & Botlts |
| 34 | Stone Pade (300x300x75)mm |
| 35 | F- Clamp With Nut & Bolt |
| 36 | Barbed Wire |
| 37 | Top, T-Off & Cross Brassing Asngle Clamp With Nut & Bolt |
| 38 | Nut& BoltWith Washear |
| 39 | 3x120 SQ MM 11 KV Cable Jointing Kit |
| 40 | 3x300 SQ MM 11 KV Cable Jointing Kit |
| 41 | Number Plate With Clamp |
| 42 | Gi Pipe 6\" Dia |
| 43 | Earthing of I/D Equipment |
| 44 | PG Clamp for Conductor |
| 45 | Work of following materials as Per RESSPO/PuVVNL norms at the work site. |
| 46 | Erection of single support ST/PCC pole for construction of 11 KV line including digging of pit, fitting of all accessories, back filling of earth & others required work.(Depth of Grouting Pole 1500 mm & Pole Pit Dia 500mm, Copping of each of STP Pole 300mm) |
| 47 | Erection of Sectional Double Pole Structure of ST/PCC pole including digging of pit, fitting of accessories, back filling of earth, grouting of each pole & stay sets & other required works with by jumpering with E bracket & Pin Insulator.(Depth of Grouting Pole 1500 mm & Pole Pit Dia 500mm, Copping of each of STP Pole 300mm) |
| 48 | Grouting of pole with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) (Depth of Grouting Pole 1500 mm & Pole Pit Dia 500mm, Copping of each of STP Pole 300mm) |
| 49 | Grouting of stay Complete with 1:4:8 ratio of cement sand & brick ballast as per RESSPO norms. (cement sand & brick ballast wil be supplied by the constractor on his own his own cost) ( Grouting of Stay with 800mm Depth & Pit Dia 500mm ) |
| 50 | Earthing Complete |
| 51 | Stringing & sagging of 3 phase 11 KV line upto proper sag including laying of Weasal Conductor, binding with insulators & jumpering. |
| 52 | 11 KV XLPE Cable3 X 300 Sq mm |
| 53 | 11 KV XLPE Cable3 X 120 Sq mm |
| 54 | 11 KV XLPE Cable3 X 70 Sq mm |
| 55 | Installation of 200/100/5A O/G 11 KV VCB Pannel |
| 56 | Installation of10 MVA T/F |
| 57 | Installation of11 KV TPMO |
| 58 | 11 KV V-Type Steel X-Arm |
| 59 | 3x70Sq mm 11KV Cable Jointing Kit |
| 60 | Stay Loop Insulator |
| 61 | GI Wire 8 SWG for Guarding |
| 62 | GS/GI Earth wire 6 SWG |
| 63 | MS Angle 75x75x2028 MM :Long (CVT Base) |
| 64 | MS Angle For Guarding |
| 65 | Gi wire 6 SWG & 10 SWG for Guarding |
| 66 | Guarding X-Arm (MS Angle 65x65x6 MM) 1.6 Mtr |
| 67 | MS Angle Cross Brecing |
| 68 | Road Restoration Charges for Pucca Footpath Side |
| 69 | Road Restoration Charges for Pucca Raod Crossing |
| 70 | Cable Layning Charges along with Cost of Bricks and Sand |
| 71 | Hord Rock Broken |
| 72 | Tree cutting Compensation |