Tender For Repair / Replacement Of Summer Appliances At Ins Hamla And Manual Rescue And Operation Rescue Of Swimming Pool, Dg Set, Pump House Erangle Area, Pump House Hamla, Central Ac Plant Hamla At Ins Hamla Under Ge (Nw) Bhandup, hamla-Maharashtra

Military Engineer Services-MES has published Tender For Repair / Replacement Of Summer Appliances At Ins Hamla And Manual Rescue And Operation Rescue Of Swimming Pool, Dg Set, Pump House Erangle Area, Pump House Hamla, Central Ac Plant Hamla At Ins Hamla Under Ge (Nw) Bhandup. Submission Date for this Tender is 12-03-2024. Diesel Generators Tenders in hamla Maharashtra. Bidders can get complete Tender details and download the document.




Tender Notice

42221589
Corrigendum : Tender For Repair / Replacement Of Summer Appliances At Ins Hamla And Manual Rescue And Operation Rescue Of Swimming Pool, Dg Set, Pump House Erangle Area, Pump House Hamla, Central Ac Plant Hamla At Ins Hamla Under Ge (Nw) Bhandup
Open Tender
Indian
Maharashtra
hamla
12-03-2024

Tender Details

Repair / Replacement Of Summer Appliances At Ins Hamla And Manual Rescue And Operation Rescue Of Swimming Pool, Dg Set, Pump House Erangle Area, Pump House Hamla, Central Ac Plant Hamla At Ins Hamla Under Ge ( Nw ) Bhandup

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-Feb-2024 BOQ CORRIGENDUM BOQ 12-03-2024

Key Value

Document Fees
INR 1000 /-
EMD
INR 168400.0 /-
Tender Value
INR 95.60 Lakhs /-

BOQ Items

Name of Work: REPAIR / REPLACEMENT OF SUMMER APPLIANCES AT INS HAMLA AND MANUAL RESCUE AND OPERATION RESCUE OF SWIMMING POOL, DG SET,PUMP HOUSE ERANGLE AREA, PUMP HOUSE HAMLA, CENTRAL AC PLANT HAMLA AT INS HAMLA UNDER GE (NW) BHANDUP
Sl. No. Item Description
1Supply & Fix new hermetically sealed compressor in existing Split type AC, 1.5 Ton capacity including intial filling of refrigerant gas to the required pressure, brazing, electric/piping connection etc complete all as specified and directed Make : Voltas/Shriram/Tecumesh/Kirloskar/Hitachi/LG/Blue
2-ditto- all as per item No.1 above but for Water cooler 40/80 liters capacity Note for item Nos. 1 to 2 :(i) The Contractor shall submit original purchase voucher alongwith manufactures test certificate and Guarantee Card etc (ii). The quotd rates shall be deed to include to undertake Guarantee of one year from certified dated of completion by the contractor for free replacement of compressor and /or rectification of the same (including charging of gas) all as directedby the GE in case any defects are noticed (during Guarantee period of 01 year) due to any reasons whatsoever may be
3Taking out window type air conditioner of capacity upto 1.5/2 TRof any make/typeafter disconnecting of electric supply and removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacing the spares like relay, capacitors, thermostat, fan motor, blades & blowerand including servicing,overhauling and charging of refrigerantand testing including fixing back in its original location complete all as specified and directed.
4Taking out split type air conditioner (both indoor and outdoor units) of capacity upto 1.5/2 TRof any make/type after disconnecting refrigerant pipes, drain pipe and electric connection and removing dust by using blower and cleaning the condenser coils and components by using water and caustic soda, checking and replacingthe spares like relay, capacitors, thermostat, fan motor, blades & blowerand including servicing, overhauling and connecting of refrigerant pipe,drain pipe and charging of refrigerant and testing including fixing back in its original location complete all as specified and directed. NOTE FOR ITEM NOS. 3 & 4 (i) Spares will be measured and paid separately as supply only. (ii) Refrigerant gas will be measured and paid separately as supply only.
5Replacement of corroded body base tray & connected portion of window type AC upto 2 Ton capacity (base tray made out of M S Sheet 18 Gauge and other portionwith MS sheet 20 Gauge) including motor mounting frame, nuts/bolts of suitable size and spray painting with two coats of synthetic enamel paint over one coat of primer including replacement of damaged insulation etc complete all as specified and directed. Note : For replacement of the body, cost of dismantling of compressor etc including reassembling and gas charging etc as required at site shall also be deemed to be included in the quoted rates.
6Taking out corroded body & frame of water cooler of 40/80 Litres storage capacity and replacement with new angle iron frame of size 40 x 40 x 6mm and cooler body with MS/CRCA sheet of 20 gauge, painting with two coats of synthetic enamel paint over a coat or red oxide primer by spray painting, including reassembleing & refixing of all parts etc complete all as specified and directed .
7Supply onlyblower fan motor for 1.5/2 TR capacity window type air conditionercomplete all as specified and directed.
8Replacement of fan blades ofmotor for water cooler upto 150 Ltr capacity including testing etc complete all as specified and directed
9Supply only blower fan blade for 1.5/2.0TR window type air conditionercomplete all as specified and directed.
10Supply onlyblower drum of window type AC upto 1.5/2 ton capacity complete all as specified and directed. Make: Voltas/Carrier/Blue Star/LG.
11Replacement of PVC cover grill of window type AC upto 1.5/2 ton capacitycomplete all as specified and directed.
12Supply only starting capacitor 60 to 80 MFD for water coolers complete all as specified and directed.
13Supply only starting capacitor 80 to 100 MFD complete all as specified and directed.
14Supply only running capacitor of 36/45 MFD complete all as specified and directed.
15Supply only relay for window type ACupto 1.5/2 Ton capacity complete all as specified and directed.
16Supply only relay for Split type AC(Non Inverter Type)upto 1.5/2 Ton capacity complete all as specified and directed.
17Replacement ofrelay for Water Cooler of upto 60 to 150 Litre storage capacity, complete all as specified and directed.
18Taking out existing unserviceable thermostat switch of water cooler and Supply & fix new thermostat switch for water cooler of any capacity including testing etc complete all as specified and directed. (Make:INDOFOSS/RANUTRAL)
19Supply and fix in repairs blower motor capacitor 6 MFD etc for water coolers complete all as specified and directed. (Make : ASIAN/KEIL/EPCOS)
20Taking out existing unserviceable over load relay and supply & fixnew over load relay in water cooler upto 150 ltrs capacity etc complete all as specified and directed.
21Taking down carefully split type AC upto 2 Ton capacity & refixing inner & outer unit at new location alongwith existing frame work, bracket, refrigerant tubing, cable, stablizer etc and making good existing surface to match with the adjoining surfaces etc complete all as specified and directed.
22Supply, fixing, clamping and jointing copper tubing in replacement of3/8" dia for suction line and for liquid discharge line duly insulated with suitable insulation material for split AC including necessary soldering, flaring work, jointing, testing etc, making hole in wall for passing though pipe and making good to the disturbed surface to match with the adjoining surfaces etc complete all as specified and directed.
23Supply & Lay PVC Nylon braided pipe 20 mm bore heavy duty including fittings to drain out condensed water of split AC including cutting of floor /wall & making good after laying of pipe to match the existing surface etc complete all as specified and directed.
24Supply& fix in repair, push cock / lift cock 15mm bore of brass, chromium plated, ISI marked for water cooler of any capacity etc complete all as specified and directed.
25Supply and fix in repair 12mm dia flexible PVC connection pipe upto 600mm long with brass nuts & washers at both ends suitable for water cooler etc complete all as specified and directed.
26Supply and fix water tray made out of GI sheet 2 mm thick for water coolerany capacity with out let system connection provided with and including PVC nylon braided pipe of 20 mm dia upto 3 mtr length and also connecting to drain pipe etc complete all as specified and directed.
27Supply & fix PVC pipe 25 mm bore with and including fittings and necessary saddles fixed on wall etc for outlet drain etc complete all as specified and directed.
28Removing existing unserviceable electronic circuit control board of split AC unit upto 2 ton capacity and supply and fixing new electronic PCB & display board kit in the indoor unit including testing etc complete all as specified and directed. Make : Voltas/Bluestar
29Repairing existing unserviceable electronic circuit control board of split AC unit upto 2 ton capacity and Refixing the same in the indoor/outdoor unit including testing etc complete all as specified and directed. Make : Voltas/Bluestar
30Removing existing unserviceable electronic circuit control board of window AC for 1.5 ton capacity and supply and fixing new electronic PCB & display board kit unit including testing etc complete all as specified and directed. Make : Voltas/Bluestar
31Supply only remote sensorhandset suitable for split AC upto 2.0 ton capacity(Of Existing make of AC only)etc complete all as specified and directed.
32Supply and fix in repair remote sensorplate suitable for split AC upto 2.0 ton capacity etc complete all as specified and directed.
33Supply and fix in repairs multipurpose door lock with duplicate key of water cooler of any make & capacity etc complete all as specified and directed.
34S & F in repairs 15mm bore gun metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipes etc complete all as specified and directed.
35S & F in repairs 15mm bore ball brass valve high pressure with polythene float & fly nut screwed for iron pipes etc complete all as specified and directed.
36Supply only refrigerant (R-134A,R32,R-410A) gas as per requirement complete all as specified and directed.
37Supply and fixing sediment filter for blue star water cooler upto20-25 inch length 40/80 ltrs capacity
38Supply and fixing Carbon filter for blue star water cooler upto 20-25 inch length 40/80 ltrs capacity
39Supply and fixing sediment filter for Voltas water cooler upto10-15 inch length 40/80 ltrs capacity
40Supply and fixing Carbon filter for Voltas water cooler upto 10-15 inch length 40/80 ltrs capacity
41Supply and fixing SV Valve HNS No - 84811000
42Supply and fixingUV lamp HNS No - 85044090
43Supply and fixing LEDHNS No - 85394900
44Supply and fixingin replacement of old u/s PCB Suitable for Bluestar 80/40 Lts Storage capacity
45Supply and fixing in replacement of old u/s PCB Suitable for Voltas 80/40 Lts Storage capacity
46Removing existing PCB circuit kit in existing water cooler of any storage capacity and any make and repair for serviceable and refixing the same after tesing complete all as specified and directed.
47Supply and fixingUV Sensor suitable for bluestar/voltas storage water coolers having storage capacity 40/80 Ltrs complete all as specified and directed.
48Manual Rescue and Operation Resqueof the following items in Three shifts per day (each shift 08 hrs continuous duration,operated by one operator in each shift including periodical maintenance/repairs (daily check and cleaning, monthly, quarterly, half yearly maintenance) with all consumables parts (except for major assembly/items/jobs which shall be measured and paid separately under item concerned as supplied only)of Central AC plant . (a) Central AC plant of capacity 3 x 26 TR Capacity (One unit stand by) comprising of compressors, motor, condensers, Chillers, AHU, refrigerant, piping, controls, pumps, water supply pipes and controls cooling towers, eletrical panels, instruments starters, strip heaters and repairs/replacement of control cabling/wiring including for the smooth and effiecient of AC plant to achieve desired inside conditions through out the given period. (Location EDP SchoolINS Hamla)
49Comprehensive maintenance of Central AC Plant of capacity 11TR X 3 Nos.Package Type (Blue Star Make)and repairs including replacement of minordefective parts costing upto 1500 Rs.Each 11TR unit comprising of following equipment mentioned below complete all as specified and directed by Engineer-in-Charge. (a)Sealed Compressor -02Nos. (Compressor model Nos :- Make:- Copeland Scroll (16K6005ET)) (b)Condenser water pump set mono block 3HP-02Nos (c)Air handling unit with blower motor -01No. (d) FRP Cooling tower with CT Fan- 01No. (e) Electrical control panelcubical type floor mounted complete with main switch, MCCBs, MCB"s,voltmeter, Ammeter, auto matic star delta starter for compressors, pumps, CT fans, condenser etc. complete-01 Set. (f) Control devices such as expansion valve, thermostat solenoidvalves, HP/ LP/ OPcut outs with panel boardinstalled gauges-01Set (g)Digit type thermometer-01Set (h)Air supply duct with grill diffusers, dampersand pre heater & re heater back of each complete-01Set (i)Condenser MS piping 50/40mm dia with valves, pressure gauge, temperature gauge,complete-01Set.
50Rewinding ofunserviceable electric motor 3/5 Hp, 3 phase 50 Hz 415volt offollowing capacity pump set complete comprising as under :- (i)Disconnecting& removing the electric motor from installed position including, loading, unloading and transporting to approved workshop. (ii) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wireofexisting gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. completefor class "F" insulation. (iii) Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continously to check the RPM etc. to the satisfactory performance etc. complete.
51Material and labour for HVE-11 expansion valve of AC plant capacity 11TR including taking down unserviceable valve complete all as specified and directed by Engineer-in-Charge. Make : Sporlon or equivalent
52Pumping down the plant to preserve the existing in refrigerantgas & leak testing of plant by charging of nitrogen gas in to entire plant & monitoring for 24hrs to find the leakages, rectification of leak by brazing & replacement of necessary gasket packingwherever required including copper tubes of suitable size vacumising of the plant by vacum pump & keeping 24hrs for pressure testing including rectification of leakages if any finally recharging of existing refrigerant gas to the plant and topping up ofrefrigerant if required to maintain the standard pressure complete testing of the plant for smooth functioning complete all as specified&as directed by Engineer-in-Charge. Note : Any Extra Refrigerant gas required will be measured and paid seperatily.
53Material and labour for disconnecting condenser for descaling, plugging them & providing of 15mm tee out let for local circulation of mild acid solution in the condenser (separate container and small pump set to circulate diluted acid solution to be used) PH value of solution to be circulated & to be kept 4 and checking frequently i.e. every one hour during the operation Scalgun WS solution to be used for descaling purpose after2 to 3 hours of cleaningif ph value remains less than flush with fresh water mixed with sodium carbonate tubes and cleaning with nylonbrush after closing the end covers, circulating diluted acid solution as specified above, to maintaine PH value as above & flushing the same with fresh water including recharging of storedrefrigerant up to required pressure of capacity 2x11 TR Working 22 TR (11 TR Stand by) plant complete all as specified& directed by Engineer-in-Charge.
54Supply andcharge refrigerant410A/R32GasISI marked.
55Taking down old unserviceablepre filter and supply and fix new pre filters efficiency 90% down to particular size of 10 micron double knitted twisted polymer fabric (washable) rated with press drop of 6 mm WC, including aluminium anodized frame work of 16 SWG to be mounted infilter assembly for existing Suitable sizecomplete all as specified and directed. Make:DYNA/ASPAWYMAN/MHP as approved
56Replacement of unserviceable 2KW Heater strip for AC plant complete all as specified and directed.
57Removing the unserviceable solenoid valve 5/8" flare from the liquid line and supply and fix new solenoid valve 5/8" suitable for AC plant of various capacitiescomplete with all as specified and as directed by Engineer-in-Charge
58Removing the unserviceable waterpressure gaugesfrom water line &supplying and fixing new water meter up to pressure 7Kg. / square centimeter complete with necessary accessories all as specified & directed by Engineer-in-Charge
59Replacement of old unserviceable thermostat with new thermostat suitable(-)18 deg C to (-) 23deg C cold storage plant complete all as specified and directed.
60Replacement ofold unserviceable liquid line filter with new liquid line filter complete all as specified and directed. Make: Danfoss or equivalent as approved by GE.
61Supply and fix single phase preventor For 3 phase Motors Upto 10.0 HP Capacity complete all as specified and directed.Make: Minilec or equivalent as approved by GE.
62Material and labour for replacement of un serviceable power contactor for starter of water pump including all electrical connection of the following type complete all as specified and as directed Note : Power contactor type ML 1.5 suitable for 5.0/7.5/ 10 HP pump set starter. Make L&T / Siemens
63Manual operation and Rescue operation and maintenance of INS HAMLA swimming pool and its pump sets along with electrical panel board and chloronome plant including their periodical maintenance and repairs with consumable items shall be measured separately as supplied only all as specified in onr operator one shift of 16 hours consisting of the following :- (a)Vertical type pressure filter with 1/2" dia nozzle, complete with pumping set monoblock with 3 HP 3 phase electric motor complete-2 Nos (b) Pumping set mono block with 5 HP induction motor electric driven for pressure filter- 2Nos (c )Suction sweeper trolley mounted 2" wide complete with pumping set monoblock with 3HP, 3 phase electric motor complete (d)Air compressor 125 cubic feet air per minute driven by 5HP induction electronic motor 3 phase, 415 Volts, 50 Hz including DOL starter etc complete -1 No. (e) Electrical control LT panel board complete with starter switches, MCB etc, all as specified and directed by Engr-in-Charge
64Supply only copper sulphate of super quality ISI Marked complete all as specisified and directed.
65Supply only aluminium potash of super quality ISI Marked complete all as specisified and directed.
66Supply only trichloroisocyanuric acid (TCCA-90) to make swimming pool water bacterial free , ISI Marked complete all as specisified and directed.
67Supplyonly stable bleaching powder (calcium hypochloride with chlorine content not less than 30%) as per IS: 15738 : 2007 and 1065 : 1989 Marke : M/s Sree Rayalaseema Hi-Strength Hypo Ltd or Grasim industries Ltd or Bengal Chemichal & Pharmaceuticals.
68Supply only sluice valve of dia 150mm classPN1.6
69Supply only sluice valve of dia 100mm Class PN 1.6
70Supply install testing and commissioning Replacement of old u/s single phase 230v operated microprocessor base Addressble 0ne (01) loop automatic fire alarm control panel with LCD display,event storage include numerical key pad ,battery back up minimum 12 hours mouted on wall having sound alarm output, control keys such as Mute buzzer,Evacuate,system reset,show alarm zones,Silence/Resound and Extend delay include Key for panel lock etc complete all as specified and directed.Location : SE-IV Building Make : Honeywell/Apollo or any Equivalent specifications make as in MES approved List.
71Supply and fix in replacement of Old u/s Weather proof Addressble type manual call Points suitable for Surface mounting ,making necessary connections,testing complete all as specified and directed.
72Supply and fix in replacement of Old u/s Addressble Hooter cum storbe complete all as specified and directed.
73Supply fix in replacement u/s brass made fire sprinkler pendant complete all as specified and directed.
74Manual Rescue and Operation Resque of electric driven pump set along with electrical panel board and chloronome plant including their periodical maintenance and repairs with all consumables and spare parts (excluding major Accessory / items / jobs which shall be measured and paid separately as supplied only under concerned items controlling the valves of distribution lines for distribution water in the area with one operator in a shift of 8 hrs for 24 Hrs in 3 (Three) shift for the following type/capacity of pumping set :- (a) Operation of two pump set mono block out of four pump set :10 HP - 02 Nos & 7.5 HP-02 Nos, -KV Pump house (b) Operation of one pump set mono block out of two pump set as required : 10 HP - 02 Nos : NSB Well pump house. (c)Operation of one pump set mono block out of two pump set as required : 5 HP pump Set -02 Nos &DG Set 10 KVA -1 No: Location :Nausena baug, KV School, KV staff qtrs sea Hawk Bldg and MAP bldg,50 Alpha area at INS Hamla)
75Manual Rescue and Operation Resque of electric driven pump set along with electric panel board and their periodical maintenance & repairs (excluding major Accessory / items / jobs which shall be measured and paid separately as supplied only under concerned items including controlling the valves of distribution lines for distributing the water in the area with one operator in a shift of 8 hrs for the following type/capacity of pumping set for 16 Hrs in 2 (Two) shiftfor the following type/capacity of pumping set :- (i)Pumping set monoblock 10 HP - 04 Nos (Main Pump House) (ii) Pumping set monoblock 10 HP - 01 Nos,7.5 HP -01 Nos (A Zone well Pump House) (iii) Pumping set monoblock 10 H.P-01 Ns 5.0 HP - 01 Nos (Sea Eagle - I Pump House) (iv) Pumping set monoblock 10 HP - 02 Nos (C Zone well Pump House) (v) Fire pump at SE-III and SE-IV The operator is also responsible to operate fire pump in case of fire in INS hamla,NSB area and KV school round the clock
76Supply Only Altoc GP Grannule based Chlorine
77Testing of water Supply and obtain the following the research and tested through NABL accredited Lab including submitting of test certificate to Engineer – in Charge complete all as specified. Details of tests to be carried out (i)Turbidity (NTU), (ii) PH, (iii) Total Hardness CaCO3 (mg/l), (iv) Sulphate (SO4) (mg/l), (v) Iron (Fe) (mg/l), (vi) Magnesium (Mg) (mg/l), (vii) E-coli or thermo tolerant coliform bacteria Note: The contractor shall collect sample of water in four different locations from FSB Erangal & INS Hamla area and the test to be carried out in the every quarterly of the contract.
78Attending of day to day Storage Electric Geysers( 25/50 Ltrs storage capacity ) complaints by disconnecting of electric connection and water supply connection,and refixing after repair and rectification of defects of geyser i.e to replace burnt wires to change indicator lamp, top plug nuts/bolts/gaskets/safety release valve/anchor fastners etc and making the Geyser ready for re-useAny small items such asare deemed to be included in the rate quoted for this item. Note: - The inner shell, outer cover, thermostat switch, Geyser assembly. Geyser elements, bottom cover ,SS Pipe set(02Nos) of hot and cold water supply ., if replaced shall be measured and paid separately completeall as specified and as directed.
79Supply and fixing in replacement Water heating element upto 3 KW in round / angular etc of any shape fitted in existing geyser25/50 ltrs capacity complete.Make :Havells/Racold/Baja Note:-Quoted rate shall be included cost of taking down of water heater (geyser) and refixing the same.
80Supply and fixing in replacement Thermostate asssembly manually adjustment type setting range with 35 to 100 CC for fixing upto 50 Ltrs capacity. Make :Havells/Racold/Baja/Jaquar Note:-Quoted rate shall be included cost of taking down of water heater (geyser) and refixing the same.
81Supply and fixing in replacement Temperature auto cut with indication lampsunitMake - as per sample Note:-Quoted rate shall be included cost of taking down of water heater (geyser) and refixing the same.
82Supply and fix in repairsHot and Cold water stainless steel connecting pipe 2ft long with Connecting bolt 15mm diaISI Marked complete all as specified & directed.
83Manual Rescue and Operation Resue of electric driven pump set along with electrical panel board and chloronome plant including their periodical maintenance and repairs with all consumables and spare parts (excluding major Accessory / items / jobs which shall be measured and paid separately as supplied only under concerned items controlling the valves of distribution lines for distribution water in the area with one operator in a shift of 8 hrs for 16 Hrs in 2 (Two) shift for the following type/capacity of pumping set :- (a) Operation of One pump set mono block out of Two pump set :05 HP - 02 Nos Location : FSB Erangle (Trata) Pump House.
84Manual Rescue and Operation Rescue including repairs minor repairs like cleaning of DG and Pump sets ,oil greasing of pump set and maintance of DG sets and Pumps used for alternate water source at Ins Hamala and NSV area ,He is also responsible to filling of Diesel ,A Check of DG sets and running of pump of alternate water source at various location at INS Hamla and as directed by Engr-in-charge.The major itemsmeasured and paid separately as supplied only under concerned itemsand periodical maintenance of the following diesel engine driven generating set with 16 hrs operation of two shiftwith one operator per shift. Note :- For majorrepair only items shall be provided separetly fixing charges are included in above M&O items
85Material only carrying out "B" check for 100 KVA DG set all as per manufacturers instructions. Location:"" A Zone - 1 No, Note : Rate quote shall be deemed to be inclusive of spares and filters but excluding engine oil.
86Material only for carrying out "B" check for 62.5 KVA DG set all as per manufacturers instructions. Location: SE-III - 1 No & D Zone - 1 No Note : Rate quote shall be deemed to be inclusive of spares and filters but excluding engine oil.
87Material only for carrying out "B" check for 200 KVA DG set all as per manufacturers instructions. Location: B Zone - 1 No Note : Rate quote shall be deemed to be inclusive of spares and filters but excluding engine oil.
88Supply Only Engine oil 20W 40
89Supply only coolent for 200/100/62.5/10 KVA DG set complete all as specified and directed
90Supply onlyMaintenance free sealed Lead-acid battery 12V DC started of capacity 120-150 Ah with suitable existing dimention size for 62.5/100/200 KVA DG sets of Kirloskar make.The contractor shall brought the size of battery with existing can be fitted only Make : Exide/Aamaron aor any equivalent specification approved by the GE.
91Supply only Fan belt of DG set of Capacity 100 KVA to 200KVA
92Supply only Copper cable of 16 sqmm including Battery terninals
93AMC of solar system grid type of 350Kwp capacity different location of INS hamla bldg cleaning of solar pannel once in a week andadjustment of wires by providing clips,fasteners etc checking of inverter including setting (Existing AMC will be completed on 24 Jun 2024) Note Replacement of any major items shall be measured and paid separetly.
94Manual rescue and operation rescue of Electric supply installations round the clock inthree shifts each shift 8 hrs (Shifts : 1st shift : 0600 to 1400 hrs, 2nd shift : 1400 to 2200 hrs, 3rd shift : 2200 to 0600 hrs)including Sunday & holiday by employing one skilled Electrician (having knowledge of HT VCB, Transformers, APFC & LT Panels) in each shift at Main Receiving Station at MO (MB) Ghatkopar including operating HT & LT panels, carrying out break down maintenance in transformer, HT,LT Panels cables etc, daily cleaning and upkeep of surrounding area of installation and Maintaning record of daily Break Down & maintenace, Monitoring & Recording of parameters such as Voltage, Current, PF etc Powerfactor atMRS, at MO (MB) Ghatkopar all as specified and as directed by Engineer-in-Charge. Note: (a) All the T&P required for the Manual rescue & Operation rescue of installations shall be provided by the contractor and cost of the same is inclusive of quoted rate (b) Materials required for upkeep of installations such asrooms, dusty cloth for cleaning of plants, buckets, etc shall bealways available at the installations for use and shall be deemed to be included in the quoted rates. (c) The Contractor should prepare duty chart on monthly basis and shall be got approved by Engineer-in-Charge. (d) Attendance register shall be submitted to Engineer-in-Charge on Daily basis. (e) In case any operator is missing or absent from duty, a penalty of Rs 2000/- per technician shall be recovered from contractor and Engineer-in-Charge decision shall be final and binding on this account. (f) To provide uniform, tools & plants, safety means like glove etc to the employees and also alternative employee (reliever) for Manual rescue and operation rescue of Installation so that the other employees can avail the facility of weekly leave etc. (g)To keep the installation & allied area in clean and tidy condition during the operation period. (h)To carryout the routine maintenance, minor repairs, oiling, greasing and to rectify the minor defects to keep the plants / Installation in serviceable condition all as directed by the GE and Engineer-in-Charge.However, the major repairs, replacements, overhauling, topping-up oil etc are not included in the scope of the above items. (j)To keep necessary documentation duly signed by all the concerned. (k) To hand over the entire substaion E/M machenaries in serviceable condition at the time of completion. (l)To keep first aid kit in all duty sub station.
95Manual rescue & operation rescueand routine maintenance ofMO MB Ghatkopar swimming pool and its pump sets alongwith electrical panel board and chloronomes plant including their periodical maintenance and repairs (excluding major assy/items/jobs as mentioned in Sch "A" Part II) all as specified in one shifts of 8 hours consisting of the following:- (a)Vertical type pressure filteration plant capacity 3500 Ltrs / hour with 1/2"thick nozzle, inlet, out let complete with filter media, GI Pipe sluice valve etc complete. (b)Pumping set monoblock centrifugal 5HP induction motor electric driven for pressure filter -2 Nos. (c ) Suction sweepr trolley mounted 2ft wide complete with centrifugal pump driven by electric motor 2HP 415V 50 cycles supply with DOL starter etc complete-2 Nos. (d) Water Softener - 01 No. (e)Alum dosing tank FRP material 8 gallons capacity with manual mixing arrangement inlet and outlet connection etc complete - 1 No (f)Air compressor 125 Cubic ft air per minute driven by 5HP induction electric motor 3 ph, 415 Volts 50Hz incl DOL starter etc complete - 1 No. (g)LT panel board suitable for 3 phase 415 Volts AC supply wall mounted and 100 Amps MCCB incoming
96Material only Altoch GPGarnual Calcium Based Chlorine usefull for Disinfection Of Drinking Water treatment. These highly concentrated solid calcium hypochlorite products deliver upto 68% available chlorine. conforms to BS EN 900:2007 (Chemicals used for treatment of water intended for human consumption - calcium hypochlorit
97Testing of water Supply and obtain the following the research and tested through NABL accredited Lab including submitting of test certificate to Engineer – in Charge complete all as specified. Details of tests to be carried out (i)Turbidity (NTU), (ii) PH, (iii) Total Hardness CaCO3 (mg/l), (iv) Sulphate (SO4) (mg/l), (v) Iron (Fe) (mg/l), (vi) Magnesium (Mg) (mg/l), (vii) E-coli or thermo tolerant coliform bacteria Note: The rate quoted deemed to include the cost of collecting sample of water in four different locations from MO (MB) Ghatkopar and the test to be carried out in the first and seventh month of the contract.
98Overhauling of monoblock pump set by removing and dismantling of pump from connected suction/ delivery pipes and electric connections etc. and taking to workshop and replacing (labour element only) unserviceable spares such as gland packing set, gun metal bushes, bearing, water seal packing set, gun metal bushes , bearing, water seal packingetc. cleaning of impeller, greasing etc. reassembling and refixing in original position including packing, and necessary nut & boltetc. including minor parts and reconnection, recommissioningand testing for smooth functioningoffollowing capacity pumps. (Note:- Major spares such as gunmetal bushes, gland packing, bearing to be replaced will be measured & paid as supply only under respective items) 10 HP Capacity
99Rewinding ofunserviceable electric motor 3 phase 50 Hz 415volt offollowing capacity pump set complete of Motor of capacity10 HP complete all as specified and directed. a) Disconnecting& removing the electric motor from installed position including, loading, unloading and transporting to approved workshop b) Taking out the existing burnt winding from the motor including rewinding complete with super enameled copper winding wireofexisting gauge including all insulating material such as insulation paper, sleeves, tape, varnish etc. completefor class "F" insulation c) Transporting the motor back to the location, reinstalling in original position including alignment, electrical & water connection, commissioning and testing for 8hours continously to check the RPM etc. to the satisfactory performance etc. complete. NOTE: Any damage caused during handling will be made good without any extracost to department
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail