Military Engineer Services-MES has published Tender For Repair/ Maint Of Central Ac Plant, 360Tr At Admc And Connected Works Under Ge (North) Bangalore. Submission Date for this Tender is 18-03-2024. AMC of Air Condition Tenders in bangalore Karnataka. Bidders can get complete Tender details and download the document.




Tender Notice

42219790
Corrigendum : Tender For Repair/ Maint Of Central Ac Plant, 360Tr At Admc And Connected Works Under Ge (North) Bangalore
Open Tender
Indian
Karnataka
bangalore
18-03-2024

Tender Details

Repair / Maint Of Central Ac Plant, 360Tr At Admc And Connected Works Under Ge ( North ) Bangalore

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 27-Feb-2024 AMDT IN BOQ AND TENDER DOCU BOQ 05-03-2024
2 05-Mar-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 12-03-2024
3 12-Mar-2024 Bid Auto Extn Corrigendum Bid Auto Extn Corrigendum 18-03-2024

Key Value

Document Fees
INR 500 /-
EMD
INR 23300.0 /-
Tender Value
INR 11.65 Lakhs /-

BOQ Items

Name of Work:REPAIR/ MAINT OF CENTRAL AC PLANT, 360TR AT ADMC AND CONNECTED WORKS UNDER GE (NORTH) BANGALORE
Sl. No. Item Description
1Dismantling existing cooling tower side cover carefully without damaging the other portion of cooling towerremoving unserviceablePVC fills carefully from cooling tower supply and fix PVC fills for 200 TR capacity cooling tower including replacement of unserviceable bolts and Nuts etc all as directed. Note : (i)Any minor part required to carryout the job is included in the unit rate quoted in Contract.
2Supply and fix removable type factory made mettalic pre -filters of 20 microm of standard size lift GI frame both side including taking out unserviceable mettalicpre - filters etc all as directedMake- Acrosol / Dyna / Johnflower / MAF
3Supply and fix factory made high performance bag filters of 99 micron down to 5 micron standard size with multiple pockets and self supporting filter bagswith MS / GI anodised aluminium frame suitable for central AC plant including replacement of bolts and nuts and taking down unserviceable bag filters etc all as directedMake- Acrosoi / MAF / Dyna / Johnflower
4Supply and fix water pressure gauges of any size up to 0- 300 PSI/0-150Kg cm² capacity including taking out unserviceable water pressure gauge etc all as directedMake- KI / H-Guru / Feibeg / Adarsh
5Supply and charge R-22 Refrigerent Gas Make Fluron / refron / mefron
6Supply and fix AC power contact 4 pole 415 vots 50 Hz of the following capacityincluding taking out unserviceable contact etc all as directedMake- L&T / Siemens/ BCH / CSS (a)33 Amps to 63 A capacity MNX-32, 440 VoltsAC Supply
7(b) 65 Amps to 100 amps capacity MNX-95, 440 Volts AC
8Disconnecting and isolating the compressor of Voltas 5H-120 model compressor from the system by putting dummy plates to suction and discharge valves opening of the compressor, removing of internal parts cleaning of the all parts throughly, replacement of Thrust washers O rings minor parts like Nuts, Bolts etcreassembling back all the serviceable parts removing of the dummy plate of the compressor, testing of compressor complete all as specified and as directed. Note :(i) Spare parts & consunable will be measured & paid seperately (ii) charging of compressor oil will be measuredn& paid separately. (iii)Any minor part required to carryout the job is included in the unit rate quoted in Contract.
9Supply and fix the following spares for model Voltas 5H-120 compressor including taking down old unserviceable spare parts complete all as specified and as directed. (a)Main bearing pump and seal end
10(b) Cylinder liner
11(c)Connecting rod
12(d)Discharge valve assembly
13(e)Piston assembly
14(f)Oil pump assembly
15(g) Valve plate assembly
16(h)Gasket set
17(j) Oil filter
18(k)SV reeds
19(l)CR bearing
20(m)SV spring
21(n) pressure release valve
22Descaling of condensing unit of 120 TR capacity of air conditioning plants by circulating descaling agent (HCL) through the condenser by forced feed method, removing of the end cover of the condenser cleaning of each tube of condenser throughly by the brushing refixing back the end cover of the condenser by removing of the rubber gasket, nuts bolts washers cleaning of spray nozzles, cooling tower cup, water line.strainer and testing spray nozzle working pressure all as specified and as directed.
23Evacuation refrigerent gas from the system in to the empty cylinder of120 TR capacity of air conditioning plants leak testing of the plant with dry nitrogen (N2) pressure by seperating the entire system like low side high side, compressors, condensers and rectifing the leakage vaccummising, recharging of evaculated refrigerent gas testing and brazing of cooling coil complete all as directed Note : (i)Supply of refregirent gas & consumable will be measured and paid separately (ii) Installed capacity of the plant to be considered.(iii)Any minor part required to carryout the job is included in the unit rate quoted in Contract.
24Supply and fixing of the following pressure cut-outs including dismantling of unserviceable cut-outsall as specified and as directed Make- Indfoss / Danfoss (a) HP/LP Cut-outs
25(b) Oil Pressure cut-outs
26(c )Water pressure cut-outs
27Disconnecting and removing the centrifugal monoblock pump set 3 phase 415 Volts from the existing position following capacity of any make, transporting to workshop, opening up check the pump winding, cutting and removing of the burnt out winding, rewinding with same size of gauge of copper conductor, insulating, varnishing greasing and replacing of ball bearing 2 Nos, reassembling, including cleaning, oiling, greasing of internal parts, replacing of worn out nut bolts, gland packing etctesting for proper functioning, bring back to site re fixing back in the same position including replacement of gland packing worn out nuts bolts etc, and testing and commissioning complete all as directed. (a) 15 HP CapacityNote : (i)Any minor part required to carryout the job is included in the unit rate quoted in Contract.
28PVC Ball valve high pressure with polythene float complete of size 25 mm dia including taking down unserviceable float valve etc all as specified and as directedMake Prayag / equivalent
29Shaft seal assembly5H120 of any make and model of compressor including removingof the unserviceable shaft seal assembly and testing all as specified and as directed.
30Removing / Replacement of AHU Belt SPA 1550.
31Removing / Replacement of AHU Belt SPA 1700.
32Removing / Replacement of AHU Belt SPA 1360.
33Removing / Replacement of AHU Belt SPA 1220.
34Removing / Replacement of AHU Belt SPA 1600.
35Removing / Replacement of Pressure gauge 0-100 Psig.
36Removing / Replacement offix Ceiling Psychrometer.
37Rubber tyre coupling suitable for 120 TR capacity compressor motor including taking out U/S rubber coupling etc all as directed.
38Supply and charge compressor oil servo frizol F-68 grade of IOC/BPCL / Hindustan petroleum all as directed
39Supply and fix Pressure Feeding / Expansiontankto maintain the pressure within the permissible limit to prevent vaccum, cavitationincluding taking out old unserviceable tank etc all as directed.
40Removing the Pump Set from Foundation , Dismantaling the unserviceable MS Channel base & foundation, Provision of mild steel MS channel / Tee section of the same size and thickness of existing one , fabricate the base suitable for the pump motor and fixed to the foundation and motor with necessary nuts, bolts , washers, all fixing arrangements etc including welding, fabrication work , cutting, grinding,making frame etc including foundation concrete in PCC (1:2:4) with necessary form work suitable for pump sets rangingfrom 20 HP to 90 HP capacity. Note : (i)Any minor part required to carryout the job is included in the unit rate quoted in Contract.
41Supply and fix Solenoidal valve to control the flow of refrigerant including taking out old unserviceable valves etc all as directed.
42Disconnecting the compressor shaft and motor shaft by removing tyre coupling and other connected items and do the necessary alingment work of shaft for avoiding any misalingment with the help of dial Guage of Voltas 5H-120 model compressor from the system reassemblingall theparts removingof the compressor, testing of compressor complete all as specified and as directed. Note :(i) Spare parts & consunable will be measured & paid seperately . (ii)Any minor part required to carryout the job is included in the unit rate quoted in Contract.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail