DUE TO ADMINISTRATIVE REASON TENDER POSTPONED AS ON 26.2.2024
Date
26-02-2024
NAME OF THE WORK :IMPROVEMENT OF BT SURFACE ATEAST KAKKAN NAGAR ROAD - 078032R835,HANUMANTHA NAGAR BRIDGE - 078032R1358, EZHIL NAGAR - 078032R840, KUMARASAMY KONAR STREET - 078013R457 - PACKAGE - V
Sl. No.
Item Description
1
Milling the existing BT surface 5 to 7 cm depth charges for cutting the BT surface to 5 to 7cm depth using milling machine conveying the milled waste materials to atleast for 20 km distance including hire and running charges for the machine conveyance charges unloading at unobjectional space cleaning the milled surface as to avoid slippery including all other incidental and unforeseen items etc complete as per the direction of departmental officers
2
Providing and laying tack coat of 2 kgs/10 sqm over the BT surface treated with binder using 2kgs of bituminous emulsion (RS1) for 10 square meter area including cost of bituminous binder, including labour charges for applying the required quantity of bituminous binder as tack coat manually etc., complete as per 503 of MORTH specifications.
3
Providing and laying 50mmconsolidated thick Dense Bituminous Macadam using 0.24cum of 26.50- 13.20mm, 0.25cum of 13.20 -2.36mm and 0.23 cum of 2.6mm & below and with 53.20 kgs of VG30/ bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 50mm with paver to the specified grades and cross sections and compacted by vibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 505 MORTHRev-5
4
Providing and laying Bituminous Concrete to 30mmthick using 0.13cum of 19.00- 9.50mm, 0.17cum of 9.50 -2.36mm and 0.26 cum of 2.36mm & below and with 45.27 kgs of VG30 & 5.03 kg of plastic waste (total.50.30 kg) bitumen for premixing per 10sqm including cost and conveyance of all meterials to CMP site , heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity , conveying the mix by tipper trucks to work site , spreading the mix to uniform thickness of 40mm withmechanical paver to the specified grades and cross sections andconsolidated by 8-10 tonevibratory / pneumatic roller to the required density etc ., including labour for attending to paver ay site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler , tipper trucks , paver Finisher ,/9 m paver finisher, vibratory / pneumatic rollers and all other tools and plant reauired , including fuel and all other incidental charges etc ., complete and per specification using CMP as per clause 507 MORTHRev-5
5
Providing and existing manhole cover using frame m 20 Concrete slab of size of uniform size including cost of steel fabrication for raising manhole and fixing RCC manhole of size 600 mm dia including cost of materials and labour chargesetc. complete as per standard specification
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.