| 1 | Construction of LAHAN MATI BAANDH(LMBAt.DHANAAJE, Gat No .1 TALUKAAKRANIDIST NANDURBAR |
| 2 | ( MREGS-2023-24) Item No A/1 :Excavation Iin all kind of soil including bouldersfor canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lift upto 10 mts. by labours on head and deposition upto 30 cm. thicknesslayers upto 1.50mts. height and all lifts as directed |
| 3 | ( MREGS-2023-24) Item No A/2 :Excavation Iin all kind of soil including bouldersfor canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lift upto 10 mts. by labours and deposition upto 30 cm. thicknesslayers upto 1.50mts. height and all lifts as directed |
| 4 | ( MREGS-2023-24) Item No A/8-1 : Lead charges forproviding and carrying on head by labour all kind ofsoil,sand, rubble, stonechips etc. upto 110 mts. excluding first 10 mts. |
| 5 | ( MREGS-2023-24) Item No A/33 : Excavating stones of 15 kg to 20 kg and Providing an constructingthick dry rubble stone pitching of 15 cm to 23 cm thickness using stones and stone chips from localy available,excavated materials including labour,hand packing/wedgingstone chips, finishing etc., complete with lead upto 10 m and all lifts upto 1.5 mts. |
| 6 | ( MREGS-2023-24) Item No A/8-3 : Lead charges forproviding and carrying on head by labour all kind ofsoil,sand, rubble, stonechips etc. upto 130 mts.excluding first 10 mts. |
| 7 | Provision For Work Insurance Charge at 1% of work cost |
| 8 | Provision For Labour Welfare Fund Charge at 1% of work cost |
| 9 | GST 12 %Charge onTotal Work Cost of Work |
| 10 | SDAO office shahada level expenditure Contigencies at 2 %Charge onTotal Work Cost of Work |
| 11 | Construction of LAHAN MATI BAANDH(LMB), At. CHONDWADE KHU Ga No.1 TALUKAAKRANIDIST NANDURBAR. |
| 12 | ( MREGS-2023-24) Item No A/1 :Excavation Iin all kind of soil including bouldersfor canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lift upto 10 mts. by labours on head and deposition upto 30 cm. thicknesslayers upto 1.50mts. height and all lifts as directed |
| 13 | ( MREGS-2023-24) Item No A/2 :Excavation Iin all kind of soil including bouldersfor canal,seating of embankment,filter drains/catch water drains etc. and placing the excavated stuff neatly in dump area or for formation of service road/embankment encluding cost of materials,machinery,labour,dressing bed and sides to required level and profile etc. complete with lift upto 10 mts. by labours and deposition upto 30 cm. thicknesslayers upto 1.50mts. height and all lifts as directed |
| 14 | ( MREGS-2023-24) Item No A/8-1 : Lead charges forproviding and carrying on head by labour all kind ofsoil,sand, rubble, stonechips etc. upto 110 mts. excluding first 10 mts. |
| 15 | ( MREGS-2023-24) Item No A/33 : Excavating stones of 15 kg to 20 kg and Providing an constructingthick dry rubble stone pitching of 15 cm to 23 cm thickness using stones and stone chips from localy available,excavated materials including labour,hand packing/wedgingstone chips, finishing etc., complete with lead upto 10 m and all lifts upto 1.5 mts. |
| 16 | ( MREGS-2023-24) Item No A/8-3 : Lead charges forproviding and carrying on head by labour all kind ofsoil,sand, rubble, stonechips etc. upto 130 mts.excluding first 10 mts. |
| 17 | Provision For Work Insurance Charge at 1% of work cost |
| 18 | Provision For Labour Welfare Fund Charge at 1% of work cost |
| 19 | GST 12 %Charge onTotal Work Cost of Work |
| 20 | SDAO office shahada level expenditure Contigencies at 2 %Charge onTotal Work Cost of Work |