Directorate of Local Bodies has published Tender For Work Of Laying And Interconnection Of 138 Meter Drinking Water Pipeline Of 140 Mm Diameter From Bodla Jagadishpura Road To Shri Suresh Chands House 46 96 3A.. Submission Date for this Tender is 17-02-2024. Water Pipe Line Tenders in agra Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Dismantling of Bitumin road, brick work or stone work in lime or cement mortar and including stacking of materials as directed by E/IC with in a distance of 60mters. |
2 | Dismantling of C.C. Interlocking tiles road, brick work or stone work in lime or cement mortar and including stacking of materials as directed by E/IC with in a distance of 60mters. |
3 | Dismantling of C.C. road, brick work or stone work in lime or cement mortar and including stacking of materials as directed by E/IC with in a distance of 60mters. |
4 | Excavation in soil with mixed kankar bolder in foundation reqauiring use of all req. tools & tackles, lift upto1.5 mt & lead upto30 mtr and removel of surplus earth as directed by engineer incharge upto a distance of 30mtr from foundation trench incl. royalty @9.00 Cum |
5 | Providing of 140mm PVC pipe conforming to ISI make working pressure 6kg/Sqcm2 incl. testing labour T&P and all complete. |
6 | Supply of pipe Special (Labour,140mm P.V.C fitting incl. End cap, reducer, shocket ) T & P complete.(10% Cost of Pipe) |
7 | Providing of 150mm G.I. pipe heavy (C Class) |
8 | Laying & jointing of 140mm PVC or 150mm G.I. pipe line with all labour T&P and all complete. |
9 | Supply & fixing of 100mm Valve (Brass) all Complete. |
10 | Supply of 140mm Djoint with rubber ring & Nutt bolt etc. all complete. |
11 | Supply of Solvent cement pack of 500ml Tin. |
12 | Sifting of house connection. |
13 | Barricading of site with all required material labour, T & P supporting material of public vheicle safty |
14 | Interconnection with new line following dia distribution main and already laid 200mm dia pipe line incl. hanging out 140mm dia or 110mm dia pipe required excavation cutting and talking out of pipe, making face of pipe in proper shape lowering and fixing of special and its jointing excluding all materials, Tee, nut-bolts, rubber packing etc incl. barricading, dismantling of road etc required for proper completion of the work.200/250mm to 140mm |
15 | Interconnection with new line following dia distribution main and already laid 200mm dia pipe line incl. hanging out 140mm dia or 110mm dia pipe required excavation cutting and talking out of pipe, making face of pipe in proper shape lowering and fixing of special and its jointing excluding all materials, Tee, nut-bolts, rubber packing etc incl. barricading, dismantling of road etc required for proper completion of the work.140mm to 110mm/90mm |
16 | Making Chamber for sluice valve constructing brick masonary chamber for underground C.I. inspection chamber and bands with bricks in cement mortar 1:4 (1cement :4 coarse sand ) R.C.C. cover with frame (light Duty) 455x610mm internal demention ,total weight of cover with frame tobe not less than 38kg (weight of cover 23kg and weight of frame 15kg ), R.C.C top slab with 1:2:4 mix (1cement :2 coarse sand :4 graded stone aggregate 20mm normal size) foundation concrete 1:5:10 (1cement :5 fine sand :10 graded stone aggregate 40mm nominal size) inside plastering 12mm thick with cement mortar 1:3 (1cement :3 coarse sand ) finished smooth with a floating coat of neat cement on walls and bed concrete etc complete as per standard design : (c) inside dimensions 600x850 mm and 150mtr deep. |
17 | Re-instatement of Bitumin road surfaces after laying of pipe line and house connection incl. supply of all materials, T&P etc, required for proper completion of work as per direction of eingineer-in-charge. the quantity of re-instatement has been increased by thirty percent in the view of additional damaged of dismantled road due to traffic / vehicle movement. |
18 | Re-instatement of C.C. Interlockingroad surfaces after laying of pipe line and house connection incl. supply of all materials, T&P etc, required for proper completion of work as per direction of eingineer-in-charge. the quantity of re-instatement has been increased by thirty percent in the view of additional damaged of dismantled road due to traffic / vehicle movement. |
19 | Re-instatement of C.C. road surfaces after laying of pipe line and house connection incl. supply of all materials, T&P etc, required for proper completion of work as per direction of eingineer-in-charge. the quantity of re-instatement has been increased by thirty percent in the view of additional damaged of dismantled road due to traffic / vehicle movement. |
20 | Contigency work.(2% of the Estimate Amount.) |
21 | Sub Total (A) |
22 | Add 18% G.S.T. |
23 | Sub Total (B) |
24 | Add/Deduction Rs. For Estimate Figure Amount Match |
25 | Grand Total |