| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc complete complying with SS20B. TNDSS No:23&24 |
| 2 | Cement concrete of mix 1:4:8 (one part of cement four part of sand and eight part of aggregates) using 40 mm gauge machine broken granite stone jelly for foundation including de watering if found necessary and laid in layers of not more than 15 cm thick well rammed and consolidated etc complying with standard specification. TNDSS No:28 |
| 3 | Supplying and erecting centering to sides and soffits including supports and strutting with necessary centering for soffits upto 3 meter height using mild steel sheet of size 90 cm x 60 cm x 10 mm gauge with MS angles of size 25mm x 25mm x 3mm laid over silver oak (CW) joists of size 10cm x 6cm spaced upto 90cm c/c and casurina props or 10 cm to 13 cm dia spaced at 0.750 cm c/c complying with standard specifications as per TNDSS NO : 30 & 86. |
| 4 | Cement concrete of mix 1:3:6 (one part of cement three part ofsand and six part of aggregates) using 40 mm gauge machine broken granite stone jelly for foundation including de watering if found necessary and laid in layers of not more than 15 cm thick well rammed and consolidated etc complying with standard specification. TNDSS No:24 |
| 5 | Supplying, fabricating and placing in position of Steel Reinforcement using Mild steel or ribbed tar steel rods, for all RCC works as per the design given by the departmental officers including cost of steel cutting, bending, placing in position and binding with binding wire and all labour charges for cutting, bending, tying and placing in position etc, complete. TNDSS No:97 |
| 6 | Reinforcement Cement concrete 1:2:4 (one part of cement two part of sand and four part of aggregates) using machine broken granite jelly of 20 mm size for all reinforced cement concrete works excluding cost of centering shuttering strutting and also cost of reinforcement grill in position but including laying vibrating with mechanical vibrators using finishing etc complete, as directed by the departmental officers etc complete complying with standard specification. TNDSS No:30 |
| 7 | Brick work in cement mortar 1:3 (one part of cement three part of sand) mix using best country bricks of size 8¾\"x4¼\"x2¾\" from approved quarry including curing, cost and conveyance of all materials to site and all labour charges etc complete as per standard specification. |
| 8 | Plastering walls with cement mortar 1:4 (one part of cement four part of sand) 12 mm thick including all cost and conveyance of all materials and all labour charges etc. complete as per standard specification. |
| 9 | Supplying and fixing of steel gate of the following specification. The outer frames should be made out of equal angels section and braces are made out of flat section cost including welding and conveyance of all materials to site locking arrangements and painting one coat of primer etc complete as per standard specifications. |
| 10 | Supply and fixing of RCC Precast slab in cement concrete 1:1½:3 mix (one part of cement one and a half part of sand and three part of aggregates) of thick 0.10 m using 20 mm ISS HBG metal including cost of molding charges mixing laying and curing cost and conveyance of all materials to site and all labour charges etc. complete as per standard specification but excluding cost of reinforcement. |
| 11 | Painting two coats with ready mixed plastic emulsion paints of first class quality and of approved colour over a priming coat including through scraping clean removal of dirt etc, complete and including cost of necessary plaster of paris, putty, brushes, wherever required and all labour charges, scaffolding charges etc., complete as per standard specification. |