Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Supply Of Tapping Channel Croos Arm. Submission Date for this Tender is 15-02-2024. Electric Pole Tenders in thanjavur Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Supply of Tapping Channel Cross Arm |
2 | 0.6KVA UPS |
3 | Tapping Channel Cross Arm |
4 | Pole pit for 9.0M and 9.14 M PSC/RCC / all metal poles (each pit) 1.25 x 0.6 x 1.83 mtr |
5 | Ordinary soil |
6 | Semi rocky soil |
7 | Heavy rocky soil where blasting/ cheseling required [specific approval should be obtained from concerned EE] |
8 | Stay pit |
9 | in ordinary soil [0.95 x 0.6 x 1.2m] |
10 | semi rocky soil |
11 | Stay pit in heavy rocky soil where blasting/ cheseling reqiured [specific approval should be obtained from concerned EE] |
12 | Erection of poles & stays (Including refilling of excavated earth) |
13 | Erection of 7.5m / 8.0m poles [RCC / PSC] |
14 | Erection of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all Metal Poles |
15 | Stay set |
16 | Erection stay set complete |
17 | Stay erection without rod and pit |
18 | Replacement of stay rod only. (Including stay pit excavation & refilling & erection) |
19 | Replacement of guy shackle only in existing stay |
20 | Erection of LINE MATERIALS |
21 | Fixing of LT 1 ph "X" Arm |
22 | Fixing of LT/HT TI Fitting |
23 | Fixing of LT 3 ph "X" Arm |
24 | Fixing of 3[1/2]" " V` X " arm |
25 | Fixing of4[1/2]" V` X " arm |
26 | Fixing of 5" V X arm |
27 | Fixing of tapping channel / guarding "X" arm |
28 | Providing of line spacers in LT lines 1 phase |
29 | Providing of line spacers in LT lines 3 phase |
30 | Erection of AB Switch with PT insulator & Jumpering complete |
31 | Erection of centre rotating Switch AB Switch complete |
32 | FIXING OF HT PIN INSULATOR / STRAIN DISC |
33 | 11 KV Pin insulator with pin |
34 | 11 KVstrain disc / polymer disc with hardware |
35 | 22 KV Pin insulator with pin |
36 | 22 KV Strain disc / polymer disc with hardware |
37 | 33 KV Pin insulator with pin |
38 | 33 KV PinStrain disc/polymer discwith hardware |
39 | Fixing of LT Pin insulator with pin |
40 | LT Shakle with hardware |
41 | Fixing of Aluminium knob |
42 | Paving Stringing and sagging of conductor including binding of pin and proper tight [including transport of condutor from Road side to work spot] per run |
43 | Upto 7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm |
44 | ACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm |
45 | ACSR 7/4.09 mm |
46 | Above 7/4.09 mm ACSR & DOG conductor |
47 | Earthing wiring and connection including transporting of earth pipe and excavation of pit] |
48 | Transformer structure earthing 10ft depth - 3 nos of pipe throughTubes |
49 | DP earthing including all works [double side earthing] |
50 | Erection of 4th Earth pipe including earthing |
51 | Earthing of poles |
52 | Earth pit masonary work 3 nos earth pits or using 3 nos concrete tub. |
53 | Replacement of detoriated earth pipe per location |
54 | Concreting with Mixture 1:3:6 [including All materials]. |
55 | Mass Concreting for centre support for 2 feet including all materials |
56 | Mass concreting for pole0.6x0.6x1.25M.with coping |
57 | Sleeve concreting for pole 0.6 m x 0.6m x 0.3 m with coping |
58 | Sleeve concreting for stay set 0.3 m & 0.75 long |
59 | Erection of Distribution Transformer Structure Complete |
60 | Excavation of structure pole Pits 0.9 X0.9 X 1.83 Mtr |
61 | Transporting of pole to pit location 2 Nos. |
62 | Erection of poles 2 Nos |
63 | Excavation of stay pit 4 Nos |
64 | Erection of stay set (4 sets) |
65 | Mass concreting (Cement:Sand:Jelly supplied by the contractor) 2 Nos. |
66 | Erection of 22 KV AB Switch |
67 | Ttransformer structure earthing 10ft depth - 3 nos of pipe through Earth Tubes |
68 | Erection of Top Channel |
69 | Bed Channel [2 nos channel] Erection |
70 | Cross with stud for bed channel Erection |
71 | Erection of belting angle / HG fuse angle |
72 | Erection ofHG fuse Set |
73 | Erection of HT LAS with jumpering and earthing |
74 | Erection of LT LAS with jumbering and earthing |
75 | Erection of Jumpering [HT Side] |
76 | Transformer wiring in LT side including Jumpering Bus bar etc. |
77 | Erection LT open type fuse unit arrangement single |
78 | Erection LT open type fuse unit arrangementDouble |
79 | Painting of stru. Complete excluding DT [two coat of red oxide] all metal parts(excluding cost of paint). |
80 | Painting of stru. Complete excluding DT [one coat Alu paint, excluding cost of paint) |
81 | Colour washing of 2 numbers structure pole [excluding cost of distember / snowsem] |
82 | Painting name of SS at seating channel including paint. |
83 | Painting of DT alone [excluding painting] with red oxide and double coating of aluminium paint. |
84 | DT metering arrangement (without materials) |
85 | Erection of distribution Transformer /dismantling of DT |
86 | Upto 100 KVA |
87 | above 100 KVA and Upto 250 KVA |
88 | 500 KVA |
89 | Colour washing of RCC / PSC poles |
90 | Numbering of poles including cost of paint / loc [black background and yellow letters] |
91 | Painting of SC details in the meter board / Agl boxes / Hut SCs including paint. |
92 | SERVICE CONNECTION |
93 | Transporting of required materials from road side to work spot and erection of street light fixture including wiring Clamping of pipe aerial board assembling |
94 | Transporting of required materials from road side to work spot and erection of 250 WS.V. lamp / Mercury lamp/LED Yard Light Fittingincluding wiring, clamping of pipe, serial board assembling etc. |
95 | Fixing of street light fitting with 2 CFL/ 4 CFL |
96 | Provision of St. Lt. switching arrangements including fixing meters, wiring, service board etc. |
97 | Erection of hut service connection complete with / without meter including transport of 5materials from section store to work spot |
98 | Erection/dismantling of metering set 11 KV / 22 KV/33 KV |
99 | Fabrication Works. |
100 | Labour charges for alteration of back clamp / stay clamp to suitable for works. |
101 | Providing of Holes. |
102 | All size angles / channel upto 5/8" |
103 | All size angles / channel above 5/8" |
104 | Slot holes in flat / angles / channel upto 3/4" |
105 | Slot holes in flat / angles / channel above 3/4" |
106 | Fabrication of centre support only for DT structure |
107 | Cutting of RS Joist / Angles / MS Channels |
108 | Welding of RS Joist / Angles / MS Channels |
109 | GENERAL |
110 | Set right the leaning pole in both HT & LT[ pin point ] location |
111 | Set right the leaning pole in both HT & LT[ cut point ] location |
112 | Resagging of lines for all sizes cut point location |
113 | Converting pin point into cut point HT lines |
114 | Converting pin point into cut point LT lines |
115 | Clearing tree branches ofcoconut tree |
116 | Clearing tree branches of Neem, tamarind, countrytree etc., |
117 | Releasing and erection 1 ph SC wire [during conductor or support change] |
118 | Releasing and erection 3 ph SC wire [during conductor or support change] |
119 | Destruction of pole concerting at site. |
120 | Retrieving grill from detoriated pole [grill separate from damaged pole] |
121 | Re earthing of structure completely including earthpipe changing if any 3nos earth pipe |
122 | Re examination of DT earthing ( Digging , inspection and making connection in between extg. 3nos Earth pipe ) |
123 | Guarding Arrangement :- |
124 | Cradle guarding including earthing and earth pit excavation [railway & P&T crossing ] |
125 | Flat guarding with 4 wire |
126 | Split Netural Guarding |
127 | LOADING AND UNLOADING : |
128 | Loading of 7.5 Mtr / 8.0 Mtr RCC / PSC/ Metal Pole [per pole ] |
129 | Loading of [ 9.14 mtr ] 9.0 mtr poles RCC /PSC Pole / Metal Pole [ per pole ] |
130 | Unloading of PSC / RCC / Metal Poles |
131 | TRANSPORTING FROM ROAD SIDE TO WORKSPOT |
132 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles Upto 1.0 Km |
133 | Transport 7.5 mtrs / 8.00 mtrs of poles including R.S.Joist and Rail Poles above additional 1.0 Km or part thereof[ certified by AEE ] |
134 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto 1.0 Km |
135 | Transport of 9.0 mtr and above poles including R.S. Joist and Rail poles upto above additional 1.0 Km or part thereof |
136 | TRANSPORT OF LINE MATERIALS |
137 | Transport of line Materials [ minimum 1 MT ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading Upto 8 kms |
138 | Transport of line Materials [ minimum 1 MT ]from sub stores to section pocket store ornear to work spot at road side by using private vehicleor vice versa excluding loading and unloading above 8 Kms and for every addl. 1 KM |
139 | TRANSPORT OF EQUIPEMENTS |
140 | Transporting of Distribution Transformer/Metering set by using private vehicleload of one No.MinimumUp to 30 Km |
141 | .Transporting of Distribution Transformer/Metering set by using private vehicleload of one No.Minimum above 30 Km for every addl .1 KM |
142 | DISMANTLING WORKS |
143 | Dismantling of 7.5m / 8.0m poles [RCC / PSC] |
144 | Dismantling of 9.00m / 9.14m RCC / PSC/Rail pole, Tubular pole and all metal poles |
145 | Dismantling stay set complete |
146 | Dismantling of LT 1 ph "X" Arm / LT/HT TI Fitting |
147 | Dismantling of LT/HT TI Fitting |
148 | Dismantling of LT 3 ph "X" Arm |
149 | Dismantlingof 3[1/2]" V` X " arm |
150 | Dismantlingof Tapping channel and Guarding X Arm |
151 | Dismantling of 11 KV strain disc/polymer disc with hardware |
152 | Dismantling of 22 KV Pin insulator with pin |
153 | Dismantling of 22 KVStrain disc with hardware |
154 | Dismantling of 33 KV Pin insulator with pin |
155 | Dismantling of 33 KVStrain disc with hardware |
156 | Dismantlingof LT Pin insulator with pin |
157 | Dismantlingof LT Shackle with hardware |
158 | Dismantling of Aluminium knob |
159 | Dismantling of Conductor7/2.59 mm ACSR, 7/2.50 AAAC including PVC cable upto 25 sqmm |
160 | Dismantling of ConductorACSR 7/3.35mm & 7/ 3.15 AAAC including PVC cable above 25 sqmm |
161 | Dismantling of ConductorACSR 7/4.09 mm |
162 | SINGLE PHASE METER &3 PHASE METER |
163 | Fixing of single phase meter |
164 | Fixing of 3 phase meter |
165 | Dismantling of single phase meter |
166 | Dismantling of 3 phase meter |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail