| Sr No | Corrigendum Date | Corrigendum | Type | New Submission Date |
|---|---|---|---|---|
| 1 | 23-04-2024 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 29-04-2024 |
| 2 | 16-04-2024 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 23-04-2024 |
| 3 | 03-04-2024 | BOQ | BOQ | 16-04-2024 |
| 4 | 28-03-2024 | Date | Date | 16-04-2024 |
| 5 | 19-03-2024 | BOQ AMENDMENT | BOQ | 06-04-2024 |
| 6 | 18-03-2024 | Date Amendment | Date | 06-04-2024 |
| 7 | 09-03-2024 | Amendment to Date 02Apr | Date | 26-03-2024 |
| 8 | 07-03-2024 | Amendment to Date | Date | 26-03-2024 |
| 9 | 29-02-2024 | corrigendum29feb23 | Date | 16-03-2024 |
| Sl. No. | Item Description |
| 1 | ITEMS OF E/M |
| 2 | Taking down carefully by disconnecting and unscrewing from boards /outlets boxes, electric meters of any size, rating, of any locations and depositing and handover to E & M storesas per bldg inventory and making good the disturbed surfaces after installation of new meters complete all as directed. |
| 3 | Design, supply, installation,testing, commissioning & integration of Advance Metering Infrastructure (AMI) for Bareilly Cannt CWE Bareilly comprising of performing site survey and deciding/suggested the communication technology to ensure data availability/connectivity of all the consumers. The design should be in such a way that it must include at least three Plus different makes of smart meters with Maximum 33 % metersofevery make must be installed at siteIt will include the following components:- |
| 4 | Supply, installation,testing & commissioning of single Phase,2 Wire, AC Static Direct connected, Smart Prepaid Energy Meters, Complying toBIS-16444, ISIMarkedBoard /current range 10-60 Amp, 240 V, accuracy class 1.0 UC1 category and above alongwith in-built load control switch, containing provision for TOD & RTC, capable to define multiple tariff slabs incl meter boxes.Meter should support the following data : (i) 15/30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, daily and monthly billing survey for Cumulative Energy and Max Demand (ii) Meter should have connect / disconnect functionality operable for MDM/billing software and prepaid features would be operable for MDM / Billing end as per Appliable |
| 5 | (iii) Meter should support communication protocol through RF/ (4G/5G)NB IOT with the software all as required at site and directed(cost of (4G/5G)NB IOT sim withrecharge facilities,mapping, vending portal charges up to the completionetc deemed to included in rate quated for meter) .Incase of RF Communication, the cost of DCU and repeaters are deemed to be included in the rates quoted for meters.(iv) The meter should support open communication protocol DLMSwith the software. |
| 6 | Supply, installation,testing & commissioning of three Phase,4 Wire, AC Static Direct connected, Smart Prepaid Energy Meters, Complying toBIS-16444, ISIMarked in existing Meter Board/ Floor Panels, current range 10-60 Amp, 240 V, accuracy class1.0 UC1 category and above alongwith inbuilt load control switch, containing provision for TOD & RTC, capable to define multiple tariff slabs incl meter boxes.Meter should support the following data : (i) 15/30 min instantaneous data for voltage, current, power factor, power, cumulative energy and frequency, daily and monthly billing survey for Cumulative Energy and Max Demand (ii) Meter should have connect / disconnect functionality operable for mdm/billing software and prepaid features would be operable for MDM / Billing end as per IS 15959 part 2. |
| 7 | (iii) Meter should support communication protocol through RF/ (4G/5G)/NB IOT with the software all as required at site and directed(cost of (4G/5G)NB IOT sim with recharge facilities,mapping vending portal charge upto the completion,etc deemed to included in rate quated for meter) . Incase of RF Communication, the cost of DCU and repeaters are deemed to be included in the rates quoted for meters.(iv) The meter should support open communication protocol DLMSwith the software. |
| 8 | Note for item no 3&6 -(a) The meter should be capable to runin both prepaid and postpaid mode & must support online and offline recharging system as required basis and directed by Engr -In -charge.(b) The manufacturer or their service provider shall furnish 05 (Five) years plus 5 years replacement guarantee for smart prepaid meters installed under this contract. The cost of the same are deemed to beincluded in the rates quoted for the item.(c) In case of Cellular communication such as 4G, NBIOT, 5G etc, the meter should be demonstrated working with more than one telecom service provider available in all the areas/stations covered under this contract.(d) Meter should be integrable to third party software. Meter vender should provide all the necessary protocols and passwords including LLS key, HLS key, authentication passwords, encryption password.(e) Meter shall be supplied with repeater battery backup of RTC (f) The rates quoted for this items are deemed to be inclusive of all other additional works including materials which is not mentioned here but need to be executed for proper and smooth functioning of pre paid smart meter system. |
| 9 | (g)Sim charges for RF/Cellular communication for 5years are included in the quoted rates i.e validity.(h) The communication technology used may be of any type as per site requirement i.e. GPRS/ RFor Canopy/ Hybrid (RF+ GPRS) of any other advanced technology as per CEA/TRAI regulations. |
| 10 | (j) Remot Data reading at configurable interval(Plus/Poll)(k)Time of Day(TOD/TOU) metering(l) Net metering /Billing(m) Alarm/Event detection , notification and Reporting(n) Remot Load Limiter and connection /disconnection at defined /on demanding condition.(o) Remote firm ware Upgrade(p) Intergation with billing & collection sofware ,mapping consumer Indexing ,connection and disconnction ,anayises software ,outage Management Sysetm etc(q) Security feature to prevent unauthorised acces to AMI including Smart meter & meter data etc and to insure authentication of all AMI elements by CERT Auditor.(r)Pairing with communication Module (s)Geo location Identification(t)Time synchronousation |
| 11 | Supply and Configuration of the Web based Software with following modules:(i) Meter Data Management Module :-The meter data management module would be responsible for collecting the data from the concentrator meter and make the data available to the billing system.The meter data management system would capture and provide the following data:(a) Real time energy monitoring with 30 min instantaneous data from all the meters for seven parameters – Cumulative Energy, Cumulative Apparent Energy (as applicable), Power, Current, Voltage, Power Factor and Frequency.(b) Monthly billing survey data for Cumulative energy and max demand(ii) Postpaid /Prepaid Billing Module :-The billing module would collect the data from the meter data management module, calculate the energy consumption, calculate billing determinant and make energy data / billing data available to admin and end users. The billing module would include functionalities for tariff setup, bill format setup, bill adjustment, occupation billing and vacation billing. It would allow postpaid and prepaid functionality as required. |
| 12 | (iii) Occupation and Vacation Module:-The system would support occupation / vacation and billing reports.the software would be collecting data from meter. The software would provide access to authorised MES rep as well as the occupant for the data.(iv) Web site Acces: There would be a dedicated website for the GE/AGE (as administrative)and BSO(as transectional) team to view all the data and information. The designated users in MES would have the admin access to the application. The MES staff would also have the access of the key information on an android mobiles app (for admin use).(v) Customer Portal:- The system would include a customer portal for the resident /occupant to log in and view their own energy / billing data. There would be android and iOS mobile apps for the user to monitor its own data and balance on regular basis. |
| 13 | (vi) Energy Accounting ModuleThe system would include features of energy accounting. The system would be able to account for total energy block wise, facility wise and would also allow calculations of unaccounted energy in case total energy meter is also available.(vii) Communication ModuleThe system would provide communication of energy data and bills via print, email /sms methods. (viii) Meter Master DataThe system would support meter master data repository. The system would support meter replacement process.(ix) Excel ExportThe system would support export of metering and billing data in excel format. |
| 14 | (x)Customer Care Module - The software would include a customer care module where the user would be log in any complaints. The service provider would monitor the complaints and carry out the necessary activities for the complaints resolution.(xi) Meter Installation Module - The software would include an app based meter installation module where the meter installation or changes can be captured on the app itself and the readings may be demonstrated to the user if required on the app itself.(xii) Activities Communication - The software support communication of the various activities such as occupation, vacation, meter change. detail change etc. with the user as well as the department on email/sms.(xiii)The software should be demonstrated to work in both RF and GPRS-based systems for future compatability.(xiii) Cyber security of software:- The CERT Audited software provided for the smart prepaid meters shall be secure from cyber threats and shall be provided regular security patches and updates including firewall and latest feature updates.Make: As per the OEM of the meter developed in India. |
| 15 | Note : (a) The software would contain two year defect liability including all operating expenses such as GPRS charges, hosting charges, sim charges etc.(b) One bank account detail will be provided by MES. The cost of integration of payment gateway with software and bank account deemed be included in the quoted rates. No extra charges will be paid by MES on account of integration of payment gateway with bank aacount and software.(c) The software would be scalable and expandable for meters and system of different make complying with IS16444.(d) The software should strictly adhere to IS 15959 standard & must be compatible with all makes of smart meters. and the software should be capable of handling at-least 10000number of meters of different makes as per BIS 16444 with 25 % expansion without any additional infrastructure and cost implication to MES |
| 16 | (e) The software must be audited by CERT India empaneled firm and documentary proof of same must be produced before commencement of work(f) The contractor must arrange/produce a MoU between OEM(maximum quantity of smart meter makeinstalled) ,before commencement of work, for technical support ( Upgrading/updating software, troublshooting any kind of problems related to meter/software/communication etc) for 10 years after date of physical completion of work. |
| 17 | Provision of wireless Report Printer with 12 pages per minute capacity, 600 x 600 dpi with HP, REt, 1200 dpi effective output quality (600 x 600 x 2 dpi with REt, with duty cycle 3,000 single-sided pages per month for report printing complete as required, Make: HP LaserJet 1020 or equivalent in canon, Epson and Samsung printer all as specified. |
| 18 | Provision of infrastructure for system like computer PCdesktop with processor i-7, 9 Generation, 8-GB RAM, hard disk 1TB, 4-USB Port including 18.5\" monitor of same make, keyboard mouse, Make-HP/DELL/IBM/Equivalent with licensed Operating system (Windows 10), along with 1K VA capacity UPS all as specified.Note : One PC Desktop will be used as a stanalone and will work as a backup of main PC. |
| 19 | Installation and provn of 1 broadband connections For Bareilly completeincluding billing. |
| 20 | Installation and provn of 1 broadband connections For Shahjahanpur completeincluding billing. |
| 21 | Installation and provn of 1 broadband connections For Hempur completeincluding billing. |
| 22 | Supply and Installation of Dell PowerEdge T340 or equivalent servers with the following specifications (the specifications would be suitable for the proposed system for upto 10000 meters) and can be updated by approval from Engineer in charge (one production and one back)• Intel Xeon Bronze 3106 1.7G, 8C/8T, 9.6GT/s , 11M Cache, No Turbo, No HT (85W) DDR4-2133• Chassis with up to 16, 2.5\" Hot Plug Hard Drives, Tower Config• 2666MT/s RDIMMs.• 2 16GB RDIMM, 2666MT/s, Dual Rank• iDRAC9,Enterprise.• 1TB 7.2K RPM SATA 6Gbps 512n 2.5in Hot-plug Hard Drive• PERC H730P+ RAID Controller, 2GB NV Cache, Adapter, Full Ht• Standard Heat Sink for Less = 150W.• DVD +/-RW, SATA, Internal• Dual, Hot-plug, Redundant Power Supply (1+1), 1100W• Jumper Cord,10A,4M,C13/C14 (India BIS).• Deskside Power Cord, G Type, 230V,2M .• Trusted Platform Module 2.0.• Dual-Port 1GbE On-Board LOM |
| 23 | • Casters, T440.• RAID 1.• Performance BIOS Settings.Make: Dell, HP, IBMNote: (1) These are indicative server specifications (2)One server would act as back up and will be setup at GE(W) Bareilly in the AOR of CWE Bareilly (3) Server room andpower supply will be provided by MES (4) The server cost would include suitable Data Switch. (5) CERT audit of Sever at the timecommissioning shall be carried out. |
| 24 | Supply and fixing UPS for server with following specifications complete all as specified and directed by Engr-in-Charge(a) Capacity of 2 KVAwith Output voltage 230V AC+10% of frequency 50HZ+1%(b) Battery of 12 Volts,65 AH-6 No. with min 90 minutes backup with full battery condition(c) Output waveform of Pseudo Sine(d) Off mode battery charging with high voltage protection(e) Battery warrenty of atleast 2 yearsMake: V-Guard//Luminous/Microtekor equivalent |
| 25 | Supply and install hi wall split units indoor/outdoor complete with cordless remote control unit and with in built Heating and Cooling arrangement and Digital Inverter twin rotary of capacity 2 TR. |
| 26 | Supply and install roomsplit type air conditionerelectric driven (single phase) cooling capacity 1.5 Ton BEE 5 star rated including all accessories as directed by Engineer-in Charge complete all as specified and directed. |
| 27 | Supply and fix LT Meter box wall mounted made out of CRCA sheet of 2 mm thick indoor type totallty enclosed weather ,dust and vermin proof with front opening hinged door and locking arrangement mounted on MS flat iron with clamp welded to suitable size of angle iron frame alround panel body duly grouted on wall, 415 Volt, 3 Phase, 4 wire AC 50 Hz having 3 phase with nuetral aluminium Bas Barsuitable for connection of 12/14 meter,insulated with PVC sleeves, spacefor fixing three/singlephase smart prepaid meter of suitable capacity 12/14 Nos meter with transparent tuffen Glass not less than 4mm thick for each meter , Copper lugs, spacers, Mounting Channel, rubber gasket, locking knobs, Hylam sheets pieces, PVC shrinkable connections, suitable compartments for each prepaid meters and epoxy powder spray painted with one coat primer complete includingtaking down old type meter box:-(i) Incomming MCCB 100 Amps 16 KA, 415 V, 4 pole--01 No(ii) R-Y-B phase LED indicating lamp-03 Nos(iii) 200 Amps TPN main aluminium bus bar(v) Space for mounting three/single phase smartprepaid meter -12 Nos(vi) All connection with wiring with 10/6 sqmm PVC insulated single core multistranded copper conductor drawing through PVC flexible conduitand connected with appropriate size copper thimbles. Sub main wire will be paid separately. |
| 28 | Design, supply installing testing and commissioning factory fabricated indoor type totally enclosed sheet metal board suitable size for fixing of smart prepaid meter and DB conforming to relevant IS and protection class IP 65 dust vermin and weather proof fabricated out of 3.00mm thick CRCA sheet duly powder coated mounted on wall, duly welded in shape and coated with two coats of synthetic enamel paint of approved colour over a coat of redoxide primer including suitable compartments for controls and monitors including cable glands for incoming and outgoing cables, locking arrangement including accomdating as per the requirement of site complete all as specified and directed by Engr- in - charge |
| 29 | Supply and fix LT Meter box wall mounted made out of CRCA sheet of 2 mm thick indoor type totallty enclosed weather ,dust and vermin proof with front opening hinged door and locking arrangement mounted on MS flat iron with clamp welded to suitable size of angle iron frame alround panel body duly grouted on wall, 415 Volt, 3 Phase, 4 wire AC 50 Hz having 3 phase with nuetral aluminium Bas Barsuitable for connection of 4 meter,insulated with PVC sleeves, spacefor fixing three/singlephase smart prepaid meter of suitable capacity 4 Nos meter with transparent tuffen Glass not less than 4mm thick for each meter , Copper lugs, spacers, Mounting Channel, rubber gasket, locking knobs, Hylam sheets pieces, PVC shrinkable connections, suitable compartments for each prepaid meters and epoxy powder spray painted with one coat primer complete includingtaking down old type meter box:-(i) Incomming MCCB 63 Amps 16 KA, 415 V, 4 pole--01 No(ii) R-Y-B phase LED indicating lamp-03 Nos(iii) 200 Amps TPN main aluminium bus bar(v) Space for mounting three/single phase smartprepaid meter -04 Nos(vi) All connection with wiring with 10/6 sqmm PVC insulated single core multistranded copper conductor drawing through PVC flexible conduitand connected with appropriate size copper thimbles. Sub main wire will be paid separately. |
| 30 | Supply and fix LT Meter box wall mounted made out of CRCA sheet of 2 mm thick indoor type totallty enclosed weather ,dust and vermin proof with front opening hinged door and locking arrangement mounted on MS flat iron with clamp welded to suitable size of angle iron frame alround panel body duly grouted on wall, 415 Volt, 3 Phase, 4 wire AC 50 Hz having 3 phase with nuetral aluminium Bas Barsuitable for connection of 1 meter,insulated with PVC sleeves, spacefor fixing three/singlephase smart prepaid meter of suitable capacity 1 Nos meter with transparent tuffen Glass not less than 4mm thick for each meter , Copper lugs, spacers, Mounting Channel, rubber gasket, locking knobs, Hylam sheets pieces, PVC shrinkable connections, suitable compartments for each prepaid meters and epoxy powder spray painted with one coat primer complete includingtaking down old type meter box:-(i) Incomming MCCB 63 Amps 16 KA, 415 V, 4 pole--01 No(ii) R-Y-B phase LED indicating lamp-03 Nos(iii) 200 Amps TPN main aluminium bus bar(v) Space for mounting three/single phase smartprepaid meter -01 Nos(vi) All connection with wiring with 10/6 sqmm PVC insulated single core multistranded copper conductor drawing through PVC flexible conduitand connected with appropriate size copper thimbles. Sub main wire will be paid separately. |
| 31 | S&F in replacement sheet metal enclosure DB\"s 415 Volts, IP-42, vertical suitable for mounting MCCB\"s, TPN,4 way with 200 Amps rated copper bus bar complete all as directed by Engineer-in-charge. |
| 32 | Supply and Fixingin repairsMCCB TPN 63 Amps, 415V, 16kA ,Thermal Magnetic Release |
| 33 | M&Lin reacement of sub main wiring with 2 single core 10 Sqmm (FRLS)copper conductor PVC unsheathed cable medium grade including PVC conduit (appropriate size) concealed in wall for sub main connection including 10 Sqmm (FRLS) PVC insulated multistranded unsheathed copper conductor used as a earth wire to common earth and connection to earth dolly all as specified.( Note :- four runs of 10 sqmm (FRLS) and one run of 10 sqmm (FRLS) copper conductor shall be measured as one unit length.) |
| 34 | M&L in reacement of sub main wiring with 2 single core 6.0 Sqmm (FRLS)copper conductor PVC unsheathed cable medium grade including PVC conduit (appropriate size) concealed in wall for sub main connection including 6.0 Sqmm (FRLS) PVC insulated multistranded unsheathed copper conductor used as a earth wire to common earth and connection to earth dolly all as specified.( Note :- Two runs of 6.0 sqmm (FRLS) and one run of 6.0 sqmm (FRLS) copper conductor shall be measured as one unit length.) |
| 35 | Material and labour for submain wiring with 1100 volts grade two single core PVC insulated and unsheathed cable with standard copper conductor (FRLS) of following sizes drawn into and including electrical grade PVC conduit not less than 25mm dia with all accoessories fixed concealed including chase cutting in brick / stone masonry for fixing conduit and making good the disturb surfaces of wall as per existing including multi- standard copper conductor as earth wire in green colour complete all as specified and directed. |
| 36 | (a) 2 run of 2.5 sqmm cable and 1 run of 2.5 sqm cable connected of common earth dolly. ( Note :- Two runs of 2.5 sqmm (FRLS) and one run of 2.5 sqmm (FRLS) copper conductor shall be measured as one unit length.) |
| 37 | (b) 2 run of 4.0 sqmm cable and 1 run of 4.0 sqmm cable connected of common earth dolly.( Note :- Two runs of 4.0 sqmm (FRLS) and one run of 4.0 sqmm (FRLS) copper conductor shall be measured as one unit length.) |
| 38 | (c) 2 run of 6.0 sqmm cable and 1 run of 4.0 sqmm cable connected of common earth dolly.( Note :- Two runs of 6.0 sqmm (FRLS) and one run of 4.0 sqmm (FRLS) copper conductor shall be measured as one unit length.) |
| 39 | (d) 4 run of 6.0 sqmm cable and 2 run of 4.0 sqmm cable connected of common earth dolly.( Note :- Four runs of 6.0 sqmm (FRLS) and two run of 4.0 sqmm (FRLS) copper conductor shall be measured as one unit length.) |
| 40 | (e) 2 run of 10.0 sqmm cable and 1 run of 10.0 sqmm cable connected of common earth dolly. ( Note :- Two runs of 10.0 sqmm (FRLS) and one run of 10.0 sqmm (FRLS) copper conductor shall be measured as one unit length.) |
| 41 | Supply and fix flush sheet metal enclosure SPN DB 8 way with double door IP-42 protection detachable gland plates, flush mounting for MCB fitted with bus bar , earth bar and neutral links all as specified and directed including taking out. |
| 42 | Supply and fixing 240V, 10 KA \"B\" curve miniature circuit breaker (MCB) of single poles and current carrying capacity 40 AMP, in the MCB DB Complete with connection testing and commissioning including taking out. |
| 43 | Supply and fixing 240V, 10 KA \"B\" curve miniature circuit breaker (MCB) of single poles and current carrying capacity 5 to 32 AMP, in the MCB DB Complete with connection testing and commissioning including Taking out. |
| 44 | Comprehensive and operation includic perioding charge of telecom operator, smart meter billing from completion of works for 1 year under defect liability period under area of GE (west) bareilly. |
| 45 | Comprehensive and operation including periodic charge of telecom operator, smart meter billing from completion of works for 2 year under defect liability period under area of GE (west) bareilly. |
| 46 | Comperhensive and operation of system including project inplementation & management all expenditure including periodic charges of telecom operator smart meter billing and maintanace from completion of works for 3rd year under area of GE (west) bareilly. |
| 47 | AU as per item no.46 here in before but from completion of works for the 4th year under area of GE (west) bareilly. |
| 48 | AU as per item no.46 here in before but from completion of works for the 5th year under area of GE (west) bareilly. |
| 49 | AU as per item no.46 here in before but from completion of works for the 6th year under area of GE (west) bareilly. |
| 50 | AU as per item no.46 here in before but from completion of works for the 7th year under area of GE (west) bareilly. |
| 51 | AU as per item no.46 here in before but from completion of works for the 8th year under area of GE (west) bareilly. |
| 52 | AU as per item no.46 here in before but from completion of works for the 9th year under area of GE (west) bareilly. |
| 53 | AU as per item no.46 here in before but from completion of works for the 10th year under area of GE (west) bareilly. |
| 54 | Comprehensive and operation includic perioding charge of telecom operator, smart meter billing from completion of works for 1 year under defect liability period ofShahjahanpur under area of GE (East) bareilly. |
| 55 | Comprehensive and operation including periodic charge of telecom operator, smart meter billing from completion of works for 2 year under defect liability period of Shahjahanpur under area of GE (East) bareilly. |
| 56 | Comperhensive and operation of system including project inplementation & management all expenditure including periodic charges of telecom operator smart meter billing and maintanace from completion of works for 3rd year ofShahjahanpur under area of GE (East) bareilly. |
| 57 | AU as per item no.56 here in before but from completion of works for the 4th yearShahjahanpur under area of GE (East) bareilly. |
| 58 | AU as per item no.56 here in before but from completion of works for the 5th year of Shahjahanpur under area of GE (East) bareilly. |
| 59 | AU as per item no.56 here in before but from completion of works for the 6th yearof Shahjahanpur under area of GE (East) bareilly. |
| 60 | AU as per item no.56 here in before but from completion of works for the 7th year ofShahjahanpur under area of GE (East) bareilly. |
| 61 | AU as per item no.56 here in before but from completion of works for the 8th year of under area of GE (west) bareilly. |
| 62 | AU as per item no.56 here in before but from completion of works for the 9th yearof Shahjahanpur under area of GE (East) bareilly. |
| 63 | AU as per item no.56 here in before but from 5completion of works for the 10th year of Shahjahanpur under area of GE (East) bareilly. |
| 64 | Comprehensive and operation includic perioding charge of telecom operator, smart meter billing from completion of works for 1 year under defect liability period of Hempurunder area of GE (East) bareilly. |
| 65 | Comprehensive and operation including periodic charge of telecom operator, smart meter billing from completion of works for 2 year under defect liability period of Hempurunder area of GE (East) bareilly. |
| 66 | Comperhensive and operation of system including project inplementation & management all expenditure including periodic charges of telecom operator smart meter billing and maintanace from completion of works for 3rd year of Hempurunder area of GE (East) bareilly. |
| 67 | AU as per item no.66 here in before but from completion of works for the 4th year of Hempurunder area of GE (East) bareilly. |
| 68 | AU as per item no.66 here in before but from completion of works for the 5th year of Hempurunder area of GE (East) bareilly. |
| 69 | AU as per item no.66 here in before but from completion of works for the 6th yearof Hempurunder area of GE (East) bareilly. |
| 70 | AU as per item no.66 here in before but from completion of works for the 7th yearof Hempurunder area of GE (East) bareilly. |
| 71 | AU as per item no.66 here in before but from completion of works for the 8th year of Hempurunder area of GE (East) bareilly. |
| 72 | AU as per item no.66 here in before but from completion of works for the 9th yearof Hempurunder area of GE (East) bareilly. |
| 73 | AU as per item no.66 here in before but from completion of works for the 10th year of Hempurunder area of GE (East) bareilly. |
| 74 | Note: An amount of Rs 549640.00 shall be deducted from the total quoted amount on account of Sch of credit. |