| 1 | Scraping white wash/colour wash. [CSR Item No. 8.31 (a)] |
| 2 | White Wash (Two Coats)(CSR Item no. 16.2) |
| 3 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wall putty by applying two or more coats to get required finish. (As per CSR Item No. 16.65) |
| 4 | Distempering with Acrylic washable oil bound distemper (of approved manufacture) two or more coats over one priming coat to give an even shade. (CSR Item No. 16.10) |
| 5 | Distempering with Acrylic washable oil bound distemper (of approved manufacture) one coat over one priming coat on old distempered surface. (CSR item no. 16.11) |
| 6 | Finishing walls with Premium Acrylic smooth exterior paint with silicon additives of required shade with two or more coats applied @ 1.43litre/10 Sqm over and including base coat of water proofing Cement Paint applied@ 2.20 Kg/10 Sqm. (CSR item no. 16.60) |
| 7 | Cement concrete 1:8:16 (b) With stone aggregates 20mm gauge(ii) mixing by mechanical means using concrete mixer volumetric type. [CSR item no. 10.7 (b) (ii)] |
| 8 | Conglomerate floor 50mm thick cement concrete topping 1:2:4 using mechanical mixer for mixing of material. (CSR item no. 14.7) |
| 9 | Applying priming coat with metal primer on new steel or iron work including preparation of surface. (CSR Item no. 16.20) |
| 10 | Painting two or more coats excluding priming coat with synthetic enamel paint in all shades on wood work, metallic or plastered, concrete surface to give an even shade. (CSR item no. 16.17) |
| 11 | Painting two or more coats with synthetic enamel paints in all shades on old wood workor metallic or plastered or concrete surface to give an even shade including rubbing down old paint. (CSR item no. 16.18) |
| 12 | Painting two or more coats with aluminum paint to give an even shade excluding primingcoat. (CSR item no. 16.25) |
| 13 | Regrading terracing of mud plaster covered with tiles or bricks in cement by dismantling tiles or bricks, removing mud plaster, preparing the surface of mud plaster to proper, slope, relaying mud plaster Gobri leaping and tiles or bricks grouted in cement mortar 1:3 (1 cement and 3 fine sand) including replacing unserviceable tiles, or bricks with new over and disposal of unserviceable material to the dumping ground within 50 m lead (The cost of new tiles or bricks excluded). (As per CSR 31.11) |
| 14 | Providing and laying of LDPE (Low density polythene sheets) over roofing before laying of roof tiles, having thicknees of 200 micron including cutting, jointing,(Heat seal joiniting with hot iron) and overlapping of minimum 150 mm ans CC Gola 75 mm vide, complete in all respects to the satisfication/approval of Engineer-in-charge. (AOR) |
| 15 | Cement concrete 1:2:4 gola 10cm x 10cm concave quadrant along junction of roofs with parapet wall finished smooth, where specially specified. (As per CSR item No. 13.55) |
| 16 | Top Khurra 0.6mx0.6m for rain water pipe in 25mm thick cement concrete 1:2:4 over 50.00 thick cement concrete 1:8:1. (As per CSR item No. 13.45) |
| 17 | Waterproofing of wet areas ( Concrete/ Masonary Surface ) and any water retaining structures such as swimming pools, water tanks, Bathrooms, toilets, balconies, planters etc with high performance polymer modified cementitionous coating ( DR. FIXIT FASTFLEX / Equivalent ) to provide tough film build-up and highly elastic film formation, which accommodates thermal movements so as to provide seamless coating without any joints to prevents water leakage. The scope of work also includes surface prepration and cleaning, washing and removing dust,dirt and loose particles from concrete / masonary surface complete in all respects. ( CSR item no. 13.92) |
| 18 | 12.5 mm thick cement plaster 1:3 (As per CSR Item no.15.8) |
| 19 | Providing and fixing 110 mm dia . U.P.V.C Rain water pipe of 4 kgf./sqm as per IS:4985 including jointing during masonary complete as per specifications and to the entire satisfaction of Engineer-in- charge. (CSR item no. 13.74) |
| 20 | Providing and fixing 110 mm dia. U.P.V.C bend for Rain water pipe as per IS:14735 including jointing complete as per specifications and to the entire satisfaction of Engineer- in- charge.(a) UPVC 110 mm bend [CSR item no. 13.75 (a)] |
| 21 | Repairs to plaster in patches of Area 2.5 sqm and under including cutting the patch in proper shape and preparing and plastering the surface of the walls complete including disposal of rubbish to the dumping ground within 50 Metres lead. (As per CSR item No. 31.1) |
| 22 | Preparation of plastered or concrete surface for painting (including sand papering the surface) using ready mixed cement based wallputty by applying two or more coats to get required finish. (As per CSR 16.65) |
| 23 | Distempering with Acrylic washable oil bound distemper (of approved manufacture) two or more coats over one priming coat to give an even shade. (As per CSR Item No. 16.10) |