| 1 | Brick work with 1 st class bricks in cement mortar (1:4)(a) In foundation and plinth[Ref : P.W.D.(Bldg) 2017 , Page - 15, Item-7] |
| 2 | (A) Filling in foundation or plinth by silver sand in layers not exceeding 150 mm as directed and consolidating the same by thorough saturation with water, ramming complete including the cost of supply of sand. (payment to be made on measurement of finished quantity)[Ref : P.W.D (Bldg) 2017. Page -2, Item-4(A)] |
| 3 | Single Brick Flat Soling of picked jhama bricks including ramming and dressing bed to proper level and filling joints withlocal sand[Ref : P.W.D (Bldg) 2017, Page -14, Item-1] |
| 4 | Cement concrete with graded jhama khoa (30 mm size) excluding shuttering In ground floor and foundation. (a) 1:3:6 proportion[Ref : P.W.D.(Bldg) , Page-23, Item No.1(a)] |
| 5 | Ordinary Cement concrete (mix 1:1.5:3) with graded stone chips (20 mm nominal size) excluding shuttering and reinforcement if any, in ground floor as per relevant IS codes.(i) Pakur Variety[Ref: P.W.D (Bldg) 2017, Page-26 Item No- 10] |
| 6 | Hire and Labour Charges for shuttering with hard wood for precast R.C. Slab curved, or stright and striking out the same including fitting, fixing the precast slab in position with necessary carriage and haulage, hosting etc, complete in all respect.[Ref: P.W.D (Bldg) 2017, Page-43,Item No- 38] |
| 7 | Reinforcement for reinforced concrete work in all sorts of structures including distribution bars, stirrups, binders etc initial straightening and removal of loose rust (if necessary), cutting to requisite length, hooking and bending to correct shape, placing in proper position and binding with 16 gauge black annealed wire at every intersection, complete as per drawing and direction.(a) For works in foundation and upto roof of ground floor/upto 4 m (i) Tor steel/Mild Steel1. SAIL/TATA/RINL[Ref : P.W.D (Bldg) Page-43, 44 Item No. 40.a.(i).II] |
| 8 | Plaster (to wall, floor, ceiling etc.) with sand and cement mortar including rounding off or chamfering corners as directed and raking out joints including throating, nosing and drip course, scaffolding/staging where necessary.[Excluding cost of chipping over concrete surface](a) with 1:4 cement mortar(ii) 20 mm thick plaster[Ref : P.W.D.(Bldg), Page-189 , Item No. 1] |
| 9 | Neat cement punning about 1.5 mm thick in wall, dado, window sills, floor etc.[Ref : P.W.D.(Bldg), Page- 192, Item No- 15] |
| 10 | Bamboo pile walling made of 65 mm to 75 mm dia. Bamboo (in single line) driven about half length into the ground at very close spacing side by side including necessary bamboo stays, ties, runners etc. and lining the exposed portion with sheets made from cut-drums fitted and fixed complete as per direction, (Payments to be made on length of wall)(c) With bamboos of length above 2.40m. and upto 3.00m. each[Ref : P.W.D.(Bldg) 2017 , Page - 217, Item-11.(c)] |
| 11 | Add G.S.T @ 18% |
| 12 | Welfare Cess |