Indian Oil Corporation Limited-IOCL has published Design, Detailed Engineering, Manufacture, Testing At Manufacturer`S Works Inspection By Third Party And Supply And Installation Of All Equipment Pertaining To5 Kg/10 Kg Composite & 47.5 Kg Lpg Cylinder Filling At Iocl Silchar Bpat Lpg Bottling Plant, Sil. Submission Date for this Tender is 15-02-2024. Tanks and Cylinders Tenders in silchar Assam. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Prefilling Machine suitable for 5/10 Kg Composite net weight LPG Cylinder filling facility. |
2 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Filling Machine suitable for 5/10 Kg Composite net weight LPG Cylinder filling facility. |
3 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Electronic Check Scale with CVT suitable for 5/10 Kg Composite net weight LPG Cylinder filling facility. |
4 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Roller Conveyor Section suitable for 5 kg/ 10 Kg Composite net weight LPG Cylinder filling facility. |
5 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Prefilling Machine suitable for 47.5 Kg net weight LPG Cylinder filling facility. |
6 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Filling Machine suitable for 47.5 kg net weight LPG Cylinder filling facility. |
7 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Electronic Check Scale with CVT suitable for 47.5 kg net weight LPG Cylinder filling facility. |
8 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Dip type Test Bath suitable for 47.5 kg net weight LPG Cylinder filling facility. |
9 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Lowering platform suitable for 47.5 kg net weight LPG Cylinder filling facility. |
10 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Cylinder trolley suitable for 47.5 kg net weight LPG Cylinder filling facility. |
11 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Roller Conveyor Section suitable for 47.5 kg net weight LPG Cylinder filling facility. |
12 | DESIGN, RESIDUAL ENGINEERING, MANUFACTURE, TESTING AT MANUFACTURER"S WORKS, INSPECTION BY THIRD PARTY AND SUPPLY OF FOLLOWING EQUIPMENTS & MATERIALS ALONG WITH Assembly, erection, testing at site of all equipment and materials supplied herein including supply, fabrication, erection, laying, testing and commissioning of compressed air piping and valves: Purging unit suitable for 5/10 Kg Composite/ 47.5 kg net weight LPG Cylinder filling facility. |
13 | Transportation Charges |
14 | GST COMPONENT (18% GST) |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail