Military Engineer Services-MES has published Tender For Repair To Certain Desks, Chairs School, Tables, Trestle Charpoy Plytop And Niwar Under Ge Kaluchak. Submission Date for this Tender is 05-03-2024. Office Furniture Tenders in kaluchak Jammu And Kashmir. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 27-Feb-2024 | Bid Auto Extn Corrigendum | Bid Auto Extn Corrigendum | 05-03-2024 |
Sl. No. | Item Description |
1 | Desk with MS Frame Model-2 :CEPZ/FD-01/07 |
2 | Repair to Desk MS Frame Model-2 with removing of old unserviceable MDF/Particle board from Top of the desk, Back rest of sittting bench & all the sides of desk and replacing with 18/19mm thick prelaminated MDF board fix properly with screws/bolt nuts as shown in drg & as directed by Engr-in-charge. All prelaminated MDF board edges shall be covered with 6mm thick teakwoodbeading and should be polish with matching of Prelaminaded MDF board colour. All as shown in drg and as directed by Engr-in-charge Note: All repairs need to be carry out at User End during office/school working hrs. Contractor shall arrange all transport fecilities. |
3 | Removing of old unserviceable wooden plank seat with MS frame and supply & fixing of 40mm thick wooden plank seat with MS sq frame as shown in drg and as directed by Engr-in-charge. The wooden plank seat shall be painted with synthetic enamel paint matchaing with MDF board as directed by Engr-in-charge. Note:All repairs need to be carry out at User End during office/school working hrs. Contractor shall arrange all transport fecilities. |
4 | M&L for required welding work on the steel frame structure as per Engr-in-charge direction and the Steel frame of the desk shall be painted with synthetic enameled paint with Black/Grey colour with spray gun after properly smootheningthe surface with help of electric grinder complete all as directed by the Engineer-in-Charge. Note: All repairs need to be carry out at User End during office/school working hrs. Contractor shall arrange all transport fecilities. |
5 | All bottom of steel frame should be cover with hard rupper shoes and top end shall be covered with PVC cap. |
6 | Desk with MS Frame Model-3 :CEPZ/FD-01/07 |
7 | Repair to Desk MS Frame Model-3 with removing of old unserviceable MDF/Particle board from Top of the desk, Back rest of sittting bench & all the sides of desk and replacing with 18/19mm thick prelaminated MDF board fix properly with screws/bolt nuts as shown in drg & as directed by Engr-in-charge. All prelaminated MDF board edges shall be covered with 6mm thick teakwoodbeading and should be polish with matching of Prelaminaded MDF board colour. All as shown in drg and as directed by Engr-in-charge Note: All repairs need to be carry out at User End during office/school working hrs. Contractor shall arrange all transport fecilities. |
8 | Removing of old unserviceable wooden plank seat with MS frame and supply & fixing of 40mm thick wooden plank seat with MS sq frame as shown in drg and as directed by Engr-in-charge. The wooden plank seat shall be painted with synthetic enamel paint matchaing with MDF board as directed by Engr-in-charge. Note:All repairs need to be carry out at User End during office/school working hrs. Contractor shall arrange all transport fecilities. |
9 | M&L for required welding work on the steel frame structure as per Engr-in-charge direction and the Steel frame of the desk shall be painted with synthetic enameled paint with Black/Grey colour with spray gun after properly smootheningthe surface with help of electric grinder complete all as directed by the Engineer-in-Charge. Note: All repairs need to be carry out at User End during office/school working hrs. Contractor shall arrange all transport fecilities. |
10 | All bottom of steel frame should be cover with hard rupper shoes and top end shall be covered with PVC cap. |
11 | SOFA SET 5 SEATER : FD- 281 Supply & fixing of following existing old broken wooden components of various furniture items or similar items carefully without disturbing the adjoining parts and providing new components of 1st grade BWR Teak/sheesham/sagwan wood in lieu of dismantled components including tightening the joints, pinning, screwing, nailing, wedging, glueing, placing every part in-tact complete all as specified, shown on drg or as directed by Engr-in-Charge. |
12 | Cushion 100 mm thick 40 densitycovered with tapestry cloth not less than Rs 550 per mtr secured with a concealed high quality zipper for easy removal all as approved, specified & as directed by Engr-in-Charge. |
13 | Rubber/PVC shoes |
14 | Scrapping off the entire existing polish of the wooden members with an electric grinder, filling putty to the bore holes/pits/cracks & chippings, scratching the surface smooth, polishing in shade as approved with PU (polyurethane) polish or MELAMINE polish following complete steps for TRADE PATTERN MIRROR LIKE SMOOTH & GLOSSY FINISH complete all as specified and as directed by Engr-in-Charge. |
15 | CHAIR TUBLER WITH PLACTIC SEAT AND BACK (TP) |
16 | S & F blowplastic one piece seat & back |
17 | Rubber/PVC shoes |
18 | Painting to the steel structure in BLACK/GREY color after removing the old wornout paint all as specified by Engr-in-Charge, |
19 | STUDY TABLE CEPZ-FD-10/09 |
20 | Removing of old unserviceable top of the study tableand replacing with 18/19mm thick prelaminated MDF board fix properly with screws/bolt nuts as shown in drg & as directed by Engr-in-charge. All prelaminated MDF board edges shall be covered with 6mm thick teakwoodbeading and should be polish with matching of Prelaminaded MDF board colour. All as shown in drg and as directed by Engr-in-charge Note: All repairs need to be carry out at User End. Contractor shall arrange all transport fecilities. |
21 | Rubber/PVC shoes |
22 | Painting to the steel structure in BLACK/GREY color after removing the old wornout paint all as specified by Engr-in-Charge, |
23 | TRESTLE STORE ROOM STEEL FD-86/ FD-1043 |
24 | M&L for required welding work on the steel frame structure as per Engr-in-charge direction and the Steel frame of the TRESTLE STORE ROOM shall be painted with synthetic enameled paint with two coat of Black colour after properly smootheningthe surface with help of electric grinder complete all as directed by the Engineer-in-Charge. Note: All repairs need to be carry out at Unit End. Contractor shall arrange all transport fecilities. |
25 | TABLE COMPUTER: FD/E6/MAP/03 |
26 | Supply & Fixing ofUNSV existing top of table computer with 18mm thick prelaminated MDF/Particle board commercial type both sides laminated duly covered with PVC edgingin color approved by the GE/Engr-in-charge. Steel frame of the table shall be painted with synthetic enameled paint BLACK colour after properly smootheningthe surface with sand paper complete all as directed by the Engineer-in-Charge. Make: ACTION TESA/CENTURYPROWUD/GREENPLY |
27 | Supply & Fixing ofUNSV existing bottom of table computer with 18mm thick prelaminated MDF/Particle board commercial type both sides laminated duly covered with PVC edgingin color approved by the GE/Engr-in-charge. Steel frame of the table shall be painted with synthetic enameled paint BLACK colour after properly smootheningthe surface with sand paper complete all as directed by the Engineer-in-Charge. Make: ACTION TESA/CENTURYPROWUD/GREENPLY |
28 | Removing of Keybord holded and Supply & Fixing of keybord holder with 18mm thick MDF/Particle board matching with the top of table. |
29 | Removing of old unsv telescopic channels and Supply & Fixing of high quality telescopic channels to the mouse pad board/ Key board holder & drawer of the tables. |
30 | Hard rubber bush stud type |
31 | CHAIR SCHOOL WITH HAND BOARD- FD/E6/MAP/05 |
32 | S & F blowplastic one piece seat & back |
33 | S & F writing rest made out of 18mm thick prelaminated MDF board same as existing. |
34 | Rubber/PVC shoes |
35 | Painting to the steel structure in BLACK color after removing the old wornout paint all as specified by Engr-in-Charge, |
36 | CHAIR WRITING MAP :- FD/E6/MAP/12 Supplying & fixing the following parts in replacement of the old existing unserviceable parts of the chair as approved, shown on drawing & as directed by Engr-in-Charge :- |
37 | Seat & back of 12 mm thick hot pressed plywood upholstered with fabric & moulded polyurethane foam. The back foam shall be designed with contour lumber support with PVC lipping all around. The cushions shall be of 40 density, 75mm thick for seat & 50 mm thick for back alongwith the fabric of approved quality & color complete all as directed by Engr-in-Charge. |
38 | Handrest to match with existing all in shape, size, material & quality. |
39 | Rubber stoppers. |
40 | CHARPOY GI PIPE PLYTOP (FD-220) |
41 | Removing of old unsv Plt top fron Charpoy GI pipe and Supply & Fixing top made out of 12 mm thickplywood board commercial grade conforming to IS:303 ofMake-CENTURY PLY /KIT PLY/DUROPLY/ARCHIDPLY as approved by GE/Engr-in-charge withthe help of nut,bolt & washer of size 62-65 mm & 6 mm dia. |
42 | S & F three way elbow GI 32mm bore/dia"ISI marked", complete all as specified,shown on drg & directed. |
43 | S & F check nut GI 32mm bore& 10mm wide as per sample kept in BSOs office, complete all as specified,shown on drg & directed. |
44 | S & F long railsof GI pipe 32mm bore, medium grade duly threaded upto 22mm on both side, to be fitted to the frame, complete all as specified,shown on drg & directed. |
45 | Replacing unsv GI short rails with short rails made out from long rail retrieved under Srl item No. 3.04 above duly threaded upto 22mm on both side, to be fitted to the frame, complete all as specified,shown on drg & directed. |
46 | Replacing unsv legs with legs of GI pipe made out of short rail retrieved under Srl item No. 3.05 above duly threaded to require size fitted to the frame, lower end of the leg provided with hard rubber shoe/ hard rubber sheet of thickness 5mm duly covering the hole for scratch free movement irrespective of what is shown in drawings, complete all as specified,shown on drg & directed. |
47 | CHARPOY GI PIPE NIWAR (FD-220) |
48 | Removing of old nylon niwar and reweaving of charpoy GI pipe after tightening of frame, with new nylon niwr of 50/55 mm wide of 1st quality multicolour niwar, weight of niwar shall not be less than 1.50Kg per charpoy, closely woven having minimum 34 bands on long rails and 14 bands on short rails the end of nylon niwar shall be stitched with nylon niwar by giving one fold with pipes. |
49 | S & F three way elbow GI 32mm bore/dia"ISI marked", complete all as specified,shown on drg & directed. |
50 | S & F check nut GI 32mm bore& 10mm wide as per sample kept in BSOs office, complete all as specified,shown on drg & directed. |
51 | S & F long railsof GI pipe 32mm bore, medium grade duly threaded upto 22mm on both side, to be fitted to the frame, complete all as specified,shown on drg & directed. |
52 | Replacing unsv GI short rails with short rails made out from long rail retrieved under Srl item No. 3.04 above duly threaded upto 22mm on both side, to be fitted to the frame, complete all as specified,shown on drg & directed. |
53 | Replacing unsv legs with legs of GI pipe made out of short rail retrieved under Srl item No. 3.05 above duly threaded to require size fitted to the frame, lower end of the leg provided with hard rubber shoe/ hard rubber sheet of thickness 5mm duly covering the hole for scratch free movement irrespective of what is shown in drawings, complete all as specified,shown on drg & directed. |
54 | TABLE DRESSING LADIES WITH MIRROR:(FD/MAP-II/07 &FD-378) |
55 | Removing of old unsv Side from Table dressing ladies. Supply with 18mm thick MDF/Particle board with both side laminated as approved colour byGE/Engr-in-charge & matching with the parts clour and fixing it properly as shown on drawing. The edge of the board shall be binding with 6mm thick teakwood beaten. |
56 | Supply & Fixing of drawer as shown on drawing |
57 | Fancy knobs as approved by GE/Engr-in-charge |
58 | Stool Cushion 75 mm thick 40 densitycovered with tapestry clothsecured with a concealed high quality zipper for easy removal all as approved, specified & as directed by Engr-in-Charge. |
59 | Castor wheels 50mm dia |
60 | Supply & Fixing of mirror with frame as shown on drg. |
61 | TABLE BED SIDE (FD-276/FD-248) |
62 | Removing of old unsv Side from Table bed side. Supply with 18mm thick MDF/Particle board with both side laminated as approved colour byGE/Engr-in-charge and fixing it properly as shown on drawing. The edge of the board shall be binding with 6mm thick teakwood beaten. |
63 | Removing of old unsv back from Table bed side. Supply with 06mm thick BWR plywood board and fixing it properly as shown on drawing. The back of the Bed side board shall be polished with matching of the Board. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail