Tamil Nadu Small Industries Development Corporation Limited-SIDCO has published Tender For Providing Water Supply Arrangements At Tansidco Pharma Industrial Park, Tindivanam In Villupuram District. Submission Date for this Tender is 13-02-2024. Water Supply Tenders in tindivanam Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Earth work excavation for foundation in all kinds of soils and subsoils and to the required depth as may be directed except hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation and basement with excavated earth in layers of 15cm thick well rammed, consolidated and depositing the surplus earth in places shown with an initial lead of 10 meters and initial lift of 2 meters and clearing, levelling the site etc., complete. (As per TNBP No. 23 & 24) |
2 | Earth work excavation for foundation in Soft Disintegrated Rock (SDR), laterite, soft rock or kankar (not requiring blasting) inclusive of shoring, strutting and bailing out water wherever necessary, refilling the sides of foundation and basement with excavated earth in layers of 15cm thick well rammed, consolidated and depositing the surplus earth in places shown with an initial lead of 10 meters and clearing, levelling the site etc., complete. (As per TNBP No. 23 & 24) |
3 | Below G.L from 2.00m to 3.00m depth |
4 | Below G.L from 3.00m to 4.00m depth |
5 | Earth work excavation for foundation in Medium Rock and Dense Medium Rock (MR & DMR) not requiring blasting to the required depth as may be directed except hard rock requiring blasting but inclusive of shoring, strutting and bailing out water wherever necessary, well rammed, consolidated and depositing on bank with an initial lead of 10 metres and clearing, levelling the site etc., complete. Below G.L from 4.00m to 5.00m depth |
6 | Supplying and filling in foundation and basement with Crushed Stone Sand (M Sand) in layers, not exceeding 150mm thickness well rammed, watered and consolidated complying with relevant standard specification etc., complete. (As per TNBP No. 24 & 25) |
7 | Plain Cement Concrete 1:4:8 (One cement, four of M Sand and eight of coarse aggregate) using 40mm gauge hard broken stone jelly for foundation inclusive of dewatering if found necessary, shoring, strutting, side shuttering, ramming, curing and laid in layers not more than 15cm thick etc., complete complying with standard specification. (As per TNBP No. 28) |
8 | Ready Mixed Cement Concrete of M30 grade including pumping at all floors with minimum cement content of 400 kg per cubic meter of ordinary portland cement with 100mm slump using HRWRA Ad-mix, M Sand,12mm and 20mm gauge HB stone jelly for all RCC items of works excluding centering, shuttering and also cost of reinforcement grill in position but including laying, curing and finishing etc., complete and also fixing fixtures like fan clamps in the RCC floor / roof slab wherever necessary etc., complete complying with standard specifications and as directed by the departmental officers. |
9 | Below GL from 1.50m to 4.50m depth |
10 | Below GL upto 1.50m depth |
11 | Above GL upto 4.50m height |
12 | Above GL from 4.50m to 7.32m height |
13 | Above GL from 7.32m to 10.98m height |
14 | Above GL from 10.98m to 14.64m height |
15 | Above GL from 14.64m to 18.30m height |
16 | Above GL from 18.30m to 21.96m height |
17 | Supplying and erecting Centering for sides and soffits including supports and strutting such as RCC slabs, rectangular beams "T" or "L" beams, lintels, bed blocks, staircase, waist and landing slabs, landing beams, canopy etc. with all cross bracings using silver oak (country wood) joists of size 10cm x 6.5cm spaced at about 90cm centre to centre supported by casurina post of 10cm to 13cm dia spaced at 75cm centre to centre etc. complete. (As per TNBP No. 86 & 86A) |
18 | For Plane Surfaces |
19 | Above GL upto 3.30m height |
20 | Above GL from 3.30m to 4.30m height |
21 | Above GL from 6.30m to 7.30m height |
22 | Above GL from 10.30m to 11.30m height |
23 | Above GL from 15.30m to 16.30m height |
24 | For Square Column |
25 | Above GL upto 3.30m height |
26 | Above GL from 3.30m to 4.30m height |
27 | Above GL from 4.30m to 5.30m height |
28 | Above GL from 5.30m to 6.30m height |
29 | Above GL from 6.30m to 7.30m height |
30 | Above GL from 7.30m to 8.30m height |
31 | Above GL from 8.30m to 9.30m height |
32 | For Square Column |
33 | Above GL from 9.30m to 10.30m height |
34 | Above GL from 10.30m to 11.30m height |
35 | Above GL from 11.30m to 12.30m height |
36 | Above GL from 12.30m to 13.30m height |
37 | Above GL from 13.30m to 14.30m height |
38 | Above GL from 14.30m to 15.30m height |
39 | For Central Circular Column |
40 | Above GL upto 3.30m height |
41 | Above GL from 3.30m to 4.30m height |
42 | Above GL from 4.30m to 5.30m height |
43 | Above GL from 5.30m to 6.30m height |
44 | Above GL from 6.30m to 7.30m height |
45 | Above GL from 7.30m to 8.30m height |
46 | Above GL from 8.30m to 9.30m height |
47 | For Central Circular Column |
48 | Above GL from 9.30m to 10.30m height |
49 | Above GL from 10.30m to 11.30m height |
50 | Above GL from 11.30m to 12.30m height |
51 | Above GL from 12.30m to 13.30m height |
52 | Above GL from 13.30m to 14.30m height |
53 | Above GL from 14.30m to 15.30m height |
54 | For Curved Surfaces |
55 | Above GL upto 3.30m height |
56 | Above GL from 3.30m to 4.30m height |
57 | Above GL from 14.30m to 15.30m height |
58 | Above GL from 15.30m to 16.30m height |
59 | Providing two legged Scaffolding using 13-15cm dia blue gum posts or casurina post or best quality bamboo post of 26.50m overall length (25.50m height + 0.50m projection + 0.50m into the ground). The distance between the two rows being 2m and the spacing of posts being 2m in both rows with two horizontal posts with 0.50m overlap on either side and braces at 2m c/c including longitudinal and transverse middle braces to step up and providing a platform with country wood planks of 40mm thick and 1m width etc. in a complete form using coir and nails for the initial height of 3m and for providing scaffolding for every additional height of 2.50m for the total height of 26.50m for every 1 metre run. |
60 | Supplying, fabricating and placing Reinforcement Steel of high yeild strength ribbed bar of various diameter and grade confirming to IS1786 of reinforced concrete work.The workincluding decoiling, straightening, cutting, bending, fabricating and placing in position at all levels and floors including lead and lift according to drawings, specifications, etc complete. Supply and use of 18Gauge black annealed binding wire double fold to tie the bars in position, chairs pins, space bars, unauthorised laps which willnot be measured separately neither for payment nor for reconsilation and providing precast cement / pvc coverblocksfor main reinforcement to ensure specifiedcover and as directed. Steel and binding wire will be procured by the contractor at his own cost. (As per TNBP No. 30 & 86) |
61 | Plastering with Cement Mortar 1:3 (One of cement and three of M Sand) 20mm thick mixed with water proofing compound at 2% by weight of cement used, including centering, strutting, finishing and curing etc complete complying with standard specification. (As per TNBP No. 56 & 57) |
62 | Plastering with Cement Mortar 1:3 (One of cement and three of M Sand) of 20mm thick including centering, strutting, finishing and curing etc complete complying with standard specification. (As per TNBP No. 56 & 57) |
63 | Plastering with Cement Mortar 1:3 (One of cement and three of M Sand) 10mm thick mixed with water proofing compound at 2% by weight of cement used, including centering, strutting, finishing and curing etc complete complying with standard specification. (As per TNBP No. 56 & 57) |
64 | Plastering with Cement Mortar 1:3 (One of cement and three of M Sand) of 10mm thick including centering, strutting, finishing and curing etc complete complying with standard specification. (As per TNBP No. 56 & 57) |
65 | Painting with two coats of approved weather shield exterior Emulsion Paint in addition to one coat of approved primer cement paint over cement plastered wall surfaces etc., including cost of Emulsion paint, putty, brushes, watering, curing etc., all complete in all respects and as directed by the SIDCO Engineers (Paints and its shade shall be got approved from the Executive Engineer before using). (As per TNBP No. 66A) |
66 | Refilling with excavated soil (other than sand) complying with standard specification for filling in foundation and basement etc., complete. (As per TNBP No. 24 & 25). |
67 | Conveyance the Surplus Earth to the places shown by the Engineer incharge including loading into lorries, conveying unloading from lorries and spreading in places indicated as instructed by the Engineer incharge with a lead of 1 to 2 km etc., complete. |
68 | Supply, delivery and fixing of RCC inside access Ladder suitable for SR with storage depth of 3.5m with hand rails 2 nos. of size 0.15x0.15x4.56m with steps of size 0.15x0.05x0.45m at an intenrval of 0.3m c/c using M30 concrete and RTS reinforcement with main rod of 8mm 4 nos. for each Hand rails and 8mm stirrups at 0.15m c/c with main rod of 8mm 2 nos. for each step with 8mm distributer at 0.10m c/c including cost of all materials, moulding charges, all labour charges, finishing curing etc., complete as directed by the Departmental officers. |
69 | 3.50m depth |
70 | 4.00m depth |
71 | Supply, delivery and fixing of RCC Hand Rail over the Roof of SR with RCC post of size0.10 x 0.10 x 0.90 m at an intenrval of 1.20 m c/c and RCC Jolly of length 1.20m and height of 0.90m each in between RCC posts using RCC 1:2:4 (One of cement, two of M Sand and four of coarse aggregate) using 20mm metal and RTS reinforcement as per approved pattern and design including the cost of reinforcement, contrete, centering, precasting, finishing, curing etc., complete as per standard specifications and as directed by the Departmental officers. |
72 | Supplying and fixing in position of Cut Stone Slab of size 0.30m x 0.30m x 0.15m in cement mortar 1:3 (One of cement and three of M Sand) using well dressed cut stone including cost of all materials, labour charges, curing beneath the inlet pipe of service reservoir etc., and as directed by the Departmental Engineers. |
73 | Supply, delivery and fixing in position of Manhole Cover of size 60 x 60 cm (Heavy Duty) with frame for roof slab using Cement Mortar 1:3 (One of cement and three of M Sand) including labour charges etc., complete and as directed by TANSIDCO Engineers. |
74 | Labour charges for painting TANSIDCO Board Emblem in accordance with the size and specifications as approved including cost of all consumables, one coat of base paint, scaffolding charges, writing slogans and details of scheme on the exposed surfaces of side wall in approved colour and paints etc., complete and as directed by TANSIDCO Engineers. (As per TNBP No. 66) |
75 | Construction of RCC Spiral Staircase in RCC 1:1.5:3 (One of cement, one & half of M Sand and three of coarse aggregate) using 20 mm HBGS of 1.80m dia of required height for approach to the roof of Service Reservoir with RCC Handrails including earthwork excavation, CC 1:4:8, RCC footing 1:1.5:3, GL platform etc., and also including cost of steel reinforcement, fabrication charges, scaffolding, centering, precasting charges, cement, painting etc. complete as per standard specifications. The staircase shall be braced to the column of Service Reservoir at suitable interval etc., complete and as directed by the Departmental officers. (19.45m Heightfor 16m staging SR) |
76 | Providing RCC (1:1.5:3) Ventilator of 0.30m dia using 20mm HBG stone including cost of all materials, centering, shuttering, strutting, reinforcement, placing of concrete, finishing, curing and fixing in position on the roof slab with mosquito proof net arrangement etc., complete and as directed by the departmental officers. |
77 | Supply, delivery and fixing of outside MS Ladder for sump outside of vertical height including painting etc., complete and as directed by TANSIDCO engineers. |
78 | Supply and delivery of the following CID/F Pipes and specials conforming to IS 7181/1986 & IS 1537 for D/F pipes andIS 1538/1993 for D/Fspecials and as amended from time to time with ISI marking including cost, loading freight, unloading and stacking at site etc., complete and as directed by the departmental officers. |
79 | 200mm CI D/F Pipe |
80 | 200 mm CID/F Duck Foot Bend |
81 | 200 mm CI Spigot Flage Tail Piece |
82 | 200 mm CI D/F Bend 90 deg. |
83 | Supply and delivery of 200 mm CI D/F Sluice Valve with cap / wheel of class PN-1 along with non raising high tensile brass spindle valve operating in anti clock direction as per IS NO 14846/2000and as amended from time to time andsuitable forwater supply mainincluding loading freight, transit, unloading and stacking them at site etc., complete and as directed by the departmental officers. |
84 | 300mm CI D/F Pipe |
85 | 300 mm CID/F Duck Foot Bend |
86 | Supply and delivery of the following CID/F Pipes and specials conforming to IS 7181/1986 & IS 1537 for D/F pipes andIS 1538/1993 for D/Fspecials and as amended from time to time with ISI marking including cost, loading freight, unloading and stacking at site etc., complete and as directed by the departmental officers. |
87 | 300 mm CI Spigot Flage Tail Piece |
88 | 300 mm CI S/SpipeLA Class |
89 | Supply and delivery of 300 mm CI D/F Sluice Valve with cap / wheel of class PN-1 alongwith non raising high tensile brass spindle valve operating in anti clock direction as per IS NO 14846/2000 and as amended from time to time and suitable for water supply main including loading freight, transit, unloading and stacking them at site etc., complete and as directed by the departmental officers. |
90 | 150mm CI D/F Pipe |
91 | 150mm x1.00 m CI D/F Pipe |
92 | 150 mm CID/F Duck Foot Bend |
93 | 150 mm CI Spigot Flage Tail Piece |
94 | 150 mm CI S/Spipe |
95 | Supply and delivery of 150 mm CI D/F Sluice Valve with cap / wheel of class PN-1 alongwith non raising high tensile brass spindle valve operating in anti clock direction as per IS NO 14846/2000and as amended from time to time and suitable forwater supply main including loading freight, transit, unloading and stacking them at site etc., complete and as directed by the departmental officers. |
96 | Supply and delivery of MJ Coller of the following sizes with necessary rubber insertions, bolts & nuts including loading & unloading, transporting charges etc., complete as per standard specification and as directed by the departmental officers. |
97 | 200mm MJ coller |
98 | 300mm MJ coller |
99 | 150mm MJ coller |
100 | 250mm MJ coller |
101 | 100mm MJ coller |
102 | Lifting and positioning of C.IPipes & Specialsin vertical direction for service reservoir pipe connection incluing all labour charges etc., complete and as directed by the departmental officers. 0 to 2 m |
103 | 2 to 4 m |
104 | 4 to 6 m |
105 | 6 to 8 m |
106 | 8 to 10 m |
107 | 10 to 12 m |
108 | 12 to 14 m |
109 | 14 to 16 m |
110 | 16 to 18 m |
111 | 18 to 20 m |
112 | Earth work excavation for laying various type / size of pipes in hard stiff clay, stiff block cotton soil, hard red earth shales murrams, gravel stoney earth and earth mixed with small sized boulders and hard gravelly classification of soil and depositing on bank with an initial lead of 10m to the required depth including shoring, strutting bailing out water from the trenches wherever necessary and all other incidental charges such as barricading providing danger light and depositing surplus earth within a lead of 10m from the tenches etc., complete and as directed by the departmental officers. |
113 | 200mm CI Pipes& DIK7 S/S Pipes |
114 | 300mm CI Pipes & DIK7 S/S Pipes |
115 | 150 mm CI Pipes & DIK7 S/S Pipes |
116 | 250mm DIK7 S/S Pipes |
117 | 100mm DIK7 S/S Pipes |
118 | Refilling trenches with excavated earth in layers not exceeding 15cm in depth, ramming and consolidation of each layer, watering etc., complete and as directed by the departmental officers. |
119 | 200mm CI Pipes & DIK7 S/S Pipes |
120 | 300mm CI Pipes & DIK7 S/S Pipes |
121 | 150mm CI Pipes & DIK7 S/S Pipes |
122 | 250mm DIK7 S/S Pipes |
123 | 100mm DIK7 S/S Pipes |
124 | Lowering of C.I / D.I Pipes and Specials carefully into the trenches and laying to proper grade and alignment including labour charges, incidental and operational charges etc., complete and as directed by the departmental officers. |
125 | 200mm CI Pipes & DIK7 S/S Pipes |
126 | 300mm CI Pipes & DIK7 S/S Pipes |
127 | 150mm CI Pipes & DIK7 S/S Pipes |
128 | Jointing ofC.I / D.I double flanged pipes and specials with rubber insertion to the required specifications with M.S. bolts and nuts (including cost of jointing materials) etc., complete and as directed by the departmental officers. |
129 | 200mm CI Pipes & DIK7 S/S Pipes |
130 | 300mm CI Pipes & DIK7 S/S Pipes |
131 | 150mm CI Pipes & DIK7 S/S Pipes |
132 | Labour charges for jointing of mechanical joint collar, nuts, gasket and fixing in position etc., complete and as directed by the departmental officers. |
133 | 200mm MJ coller |
134 | 300mm MJ coller |
135 | 150mm MJ coller |
136 | 250mm MJ coller |
137 | 100mm MJ coller |
138 | Supplying, delivery and fixing of RCC Cylinderical Ventilator of internal dia 0.30m and height of 0.45m with sidewall and cover slab of 0.10m using RCC 1:1.5:3 (One of cement, one & half of M Sand and three of coarse aggregate) using 20 mm HBGS of approved pattern including cost of cement, reinforcement, centering, shuttering, strutting etc., complete and as directed by the departmental officers. |
139 | Construction of Masonry Valve Pit for fixingsluice valves as per type design No.9/43.The foundation will be in PCC 1:4:8 and brick workin C:M 1:5, Plastering in CM 1:3-12mm thickand the pit provided with 100mm thick RCC1:11/2:3 cover slab. The rate includes earth work excavation in various soils met with at the site of work, refilling the pit after theconstruction of pit, cost of levelling course, brickwork, plastering, cut stone, RCC cover slab, cost of reinforcemet, fabrication charges and fixing the valves in position inside the pit, laying and jointing of CIpipes and specials etc., complete. The jointing materials such as bolts, nut washers, rubber insertion sheets, white lead have to be procured and utilised by the contractor at his own cost etc., complete and as directed by the departmental officers. |
140 | Sluice Valve pitforhousing150 mmdia Sluice valves |
141 | Sluice Valve pitforhousing200 mmdia Sluice valves |
142 | Sluice Valve pitforhousing300 mmdia Sluice valves |
143 | Supply and delivery of the following sizes ofDIK7 S/S / DIK9 S/S pipes as per standard Specification. |
144 | 300mm DIK7 S/S Pipes |
145 | 250mm DIK7 S/S Pipes |
146 | 200mm DIK7 S/S Pipes |
147 | 150mm DIK7 S/S Pipes |
148 | 100mm DIK7 S/S Pipes |
149 | Supply and delivery of DI S/S Specials like DI AS Tee, DI DS Taper, DI D/S Bend, tail piece and blank flange conforming to IS 9523/2000and as amended from time to time with ISI marking includingloading, freight unloading and stacking at site etc., complete and as directed by the departmental officers. |
150 | Supply and delivery of DI D/F Gate Sluice Valves (soft seated) resilient seated soft sealing Gate Valves (Sluice Valves) with body Bonnet of Ductile cast iron of Grade GGG 40 or equivalent grade, Wedge fully rubber lined with EPDM replaceable spindle nut without gland packing and with 3 O- Ring protection on the shaft and seals of NBR and the valves should be of Vacuum tight and 100% leak proof with face to face dimensions as per BS 5163- 89/ISI 14846-2000/DIN 3202 F4. All the valves should be with electrostatic powder coating both inside and out side with pocket less straight through body passage. All the valves are to be compatible for buried application with pressure rating PN 10/16 and with 5 years guarantee. |
151 | 300mm dia DI D/F Sluice Vales |
152 | 200mm dia DI D/F Sluice Vales |
153 | Supply and delivery of Tamper proof DI single chamber Air release valves with pressure range from PN 1.0 to 2.5 with body and cover made of Ductile Iron of grade GGG 40/45/50 or equivalent grade conforming to IS 1865 with food Grade Epoxy powder coating (EP-P) inside andfor outside of colour blue RAL 5005. ALL internal parts such as float,shell etc., cover bolts, made of Austenitic allloy steel of SS AISI 304/316. The float for DN50 made of polytetrafluroethylene/ Austentic alloy steel of AISI 304/316. Gaskets and seals of EPDM/ Neoprene rubber for works including loading freight, transit, unloading and stacking them at site etc., complete and as directed by the departmental officers. |
154 | 80mm dia AV in 300mm Main |
155 | 50mm dia AV in 200mm Main |
156 | 50mm dia AV in 150mm Main |
157 | Supply and delivery of DI Specials required for sluice value |
158 | Supply and delivery of DI Specials required for scour values |
159 | Supply and delivery of DI / GI Specials required for air values |
160 | Provision for Cross drainage works |
161 | Lowering the following size of DI K7 Class Pipes and Specials into the trenches and laying to proper grade and alignment etc., complete and as directed by the departmental officers. |
162 | 300mm DIK7 S/S Pipes |
163 | 250mm DIK7 S/S Pipes |
164 | 200mm DIK7 S/S Pipes |
165 | 150mm DIK7 S/S Pipes |
166 | 100mm DIK7 S/S Pipes |
167 | Jointing the D.I S/S Pipes and Specials with rubber gaskets (tyton joint) including cost of lubricants etc., complete and as directed by the departmental officers. |
168 | 300mm DIK7 S/S Pipes |
169 | 250mm DIK7 S/S Pipes |
170 | 200mm DIK7 S/S Pipes |
171 | 150mm DIK7 S/S Pipes |
172 | 100mm DIK7 S/S Pipes |
173 | Testing of following DI pipes / PVC pipes wiith hydraulic testing equipment by fuilling with water (including cost of water) and testing to recommended pressure in convinient stetches and attending the bursts if any occured during the tests, excluding cost of pipes, including other incidental and operational charges etc., complete and as directed by the departmental officers. |
174 | 300mm DIK7 S/S Pipes |
175 | 250mm DIK7 S/S Pipes |
176 | 200mm DIK7 S/S Pipes |
177 | 150mm DIK7 S/S Pipes |
178 | 100mm DIK7 S/S Pipes |
179 | Cutting BT Road portion for laying of pipes |