Tamil Nadu Generation And Distribution Corporation Limited-TANGEDCO has published Tender For Running Works Contract For The Erection Worksto Pethappampatty Section Of Pethappampatty Sub Division In Pollachi Division. Submission Date for this Tender is 22-02-2024. Civil Work Tenders in pollachi Tamil Nadu. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | EXCAVATION OF POLE PITS / Stay Set: |
2 | Excavation of Pole pits for pole upto 8.00mm length by using JCB/Manual |
3 | Excavation of Pole pits for pole above 8.00mm length by using JCB/Manual |
4 | Excavation of Pole pits for pole in rocky area (common to all size of poles) by blasting / Manual |
5 | Excavation for Stay pit 4.5" to 5" depth using JCB /Manual |
6 | Excavation & Backfillingof Stay Pit per location - Hard rock without blasting |
7 | Erection of REC/RCC/PSC pole upto 8.0 m length using Crane/Manual |
8 | Erection of REC/RCC/PSC pole above 8.0 m length using Crane/Manual |
9 | Erection of metal supports above 9.0m / RSJ/Rail pole/Tubular |
10 | Erection of Stay set complete with fixing up stay wire, Eye Bow, Guy Shackle binding etc., |
11 | Erection of Additional Stay in the same Stay Rod excluding excavation of Stay pit and burrial of stay rod |
12 | Erection of Stay set complete including excavation of Stay pit in the Rock area by blasting with fixing of Stay wire, eye, bow, Guy Shackle, Binding etc., |
13 | Replacement of Stay rod only (including stay pit excavtion refilling and erection) |
14 | Replacement of Guy shackle only in existing stay |
15 | Fixing of LT 3 Ph Cross Arm |
16 | Fixing of LT 1 Ph Cross Arm |
17 | Fixing of V Cross Arm 3.5 Feet |
18 | Fixing of V Cross Arm 4.5 Feet |
19 | Fixing of HT/LT TI Fitting |
20 | Fixing of Double Channel cross Arm |
21 | Fixing of Guarding X Arm |
22 | Fixing of Tapping channel cross Arm |
23 | Fixing of Two Tapping cross arm per cut point upto 33KV line including fixing of Discs, Insulators and Jumbering etc |
24 | Fixing of HT PIN Insulator withpin 11KV |
25 | Fixing of HT PIN Insulator withpin 22KV |
26 | Fixing of HT PIN Insulator withpin 33KV |
27 | Fixing of LT Pin insulator |
28 | Fixing of HT Strain disc 11KV |
29 | Fixing of HT Strain disc 22KV |
30 | Fixing of HT Strain disc 33KV |
31 | Fixing of LT Shackle with Hardwares |
32 | Fixing of Alumium Knob |
33 | Fixing of HT LAS (3 Nos) |
34 | Fixing of LT LAS (3 Nos) |
35 | Fixing of open type fuse unit arrangements |
36 | Providing of line spacers in LT lines 1 phase |
37 | Providing of line spacers in LT lines 3 phase |
38 | Paving and stringing of conductors of sizes upto 7/2.59mm ACSR or other equivalent conductor |
39 | Paving and stringing of conductors of sizes above 7/2.59mm ACSR or other equivalent conductor upto 7/3.35mm ACSR or other equivalent conductor |
40 | Paving and stringing of conductors of 7/4.09 mm ACSR or other equivalent conductor |
41 | Resagging of lines for All sizes at cutpoint location per wire /span |
42 | Earthing of Poles with GI wires 4 or 6 SWG by coil earthing |
43 | Concreting with 1:4:8 mix using 40 mm Jelly including curing (Material + Labour) Sleeve Concreting per pole |
44 | Mass Concreting of poles |
45 | Stay Concreting |
46 | Erection of Distribution Transformer structure as per TNEB standard including painting, feeders arrangement, color washing of RCC Poles etc., Fixing of poles type to be unit LT/HT LAS and Jumbering 3 Nos Earth pits with earth through except erection of Distribution Transformer. (Data as per Annexure II) |
47 | Erection of Distribution Transformer including loading of Distribution Transformer at stores and Erection of Stucture or vice versa upto 25KVA Distribution Transformer/ Metering Set |
48 | (ii) Above 25 KVA to 100 KVA |
49 | (iii) Above 100 KVA to 250 KVA |
50 | (iv) 500 KVA and Above |
51 | (v) Failed DT replacement below 100 KVA |
52 | (v) Failed DT replacement 100 KVA and Above |
53 | Erection of 11 KV Single pole Structure including erection of DT Complete without centre support.(Data as per Annexure III) |
54 | Erection of 11 KV Single pole Structure including erection of DT Complete with centre support.(Data as per Annexure III) |
55 | Provision of guarding with two numbers earth pits excluding stay set erection - flat guarding with earth pit |
56 | Split neutral |
57 | Loading of REC/ RCC/PSC/Metal Pole upto 8.00m length |
58 | Loading of REC/ RCC/PSC/Metal Pole above 8.00m length |
59 | Loading of Metal poles all sizes |
60 | Unloading of REC/ RCC/PSC/Metal Pole upto 8.00m length |
61 | Unloading of REC/ RCC/PSC/Metal Pole above 8.00m length |
62 | Unloading of Metal poles all sizes |
63 | Loading or unloading of Distribution Transformer Upto 100 KVA |
64 | Loading or unloading of Distribution TransformerAbove 100 KVA and upto 500 KVA |
65 | Loading / Unloading of line materials |
66 | Loading / Unloading of 11 KV strain disc |
67 | Loading / Unloading of LT Pin insulator shackle, guy shackle, LT Pin, Metal parts, HT pin etc., |
68 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) For a lead upto 5 KM |
69 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading ) Above 5 KM of lead of every KM |
70 | Transportation of all sizes of poles and other associated materials from road side to pole pit and vice versa upto 0.5 Km |
71 | Transport of Conductors of all sizes from Road side to pit locations upto 1 KM of Conductor |
72 | Transport of Distribution Transformer/Line Materials from sub stores to office/site upto 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
73 | Transport of Distribution Transformer/Line Materials from sub stores to office/site above 10 KM distance by engaging 1 Ton capacity Minidor (Lorry) |
74 | Dismantling of RCC, RCC, PSC metal poles all sizes 7.5m /8.0m /9.0m / 9.14m poles(RCC/PSC) including the closing of the pit |
75 | Dismantling Stay set complete including stay rod |
76 | Dismantling Stay set complete including without stay rod |
77 | For Breaking the mass concrete of all supports |
78 | Dismantling of Double channel X Arm |
79 | Dismantling of Guarding X Arm |
80 | Dismantling ofTapping channel cross Arm |
81 | Dismantling of 11 KV pin with insulator |
82 | Dismantling of 11KV composite Disc with MP |
83 | Dismantling of 22 KV pin with insulator |
84 | Dismantling of 22 KV composite Disc with MP |
85 | Dismantling of 1372 mm (4"6"" V X Arm) |
86 | Dismantling of 1068 mm (3"6"" V X Arm) |
87 | Dismantling of HT /LT TI fitting |
88 | Dismantling of 3 ph X Arm |
89 | Dismantling of 1 ph X Arm |
90 | Dismantling of Aluminium Knob |
91 | Dismantling of LT Shackle with Mp |
92 | Dismantling of LT Pin with Insulator |
93 | Dismantling of LT Open Type |
94 | Dismantling of metering set 11KV/22 KV/33KV |
95 | Dismantling of DT below 200KVA |
96 | Dismantling of DT 200KVA and above upto 500KVA |
97 | Dismantling of HT LAS (3 nos) |
98 | Dismantling of LT LAS (3 nos) |
99 | Dismantling of Cross arm clamps TI fitting hardwares, insulators, etc., |
100 | Dismantling ofconductor upto 7/3.35mmincluding transporting the conductors to the nearest road side and stocking of coils |
101 | Dismantling ofconductor above 7/3.35mmincluding transporting the conductors to the nearest road side and stocking of coils |
102 | Releasing and reerection (resagging) of one run of all sizes of conductor |
103 | Releasing and Erection of 1 Ph SC wire (During conductor or Support Change |
104 | Releasing and Erection of 3 Ph SC wire (During conductor or Support Change |
105 | Dismantling of Transformer structure materials complete set and transporting the same from the location to the road side |
106 | Numbering of poles including base painting and with cost of paint |
107 | Manufacturing / Altering of Clamps |
108 | Drilling of holes in the structure materials clamps etc., |
109 | AB switch or open type side arm stud, cutting and drilling holes |
110 | Clearing tree branches of Coconut tree |
111 | Clearing tree branches of Neem, tamarind, country tree etc., |
112 | Leveling of Ground using Bul Dozer |
113 | Clearing of Branches / Trees with JCB |