| 1 | (SH :- RRM Wall -- 5.95 mtr ht. & 25.00 mtr Length) |
| 2 | Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering) |
| 3 | PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 4 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical SpecificationRandom Rubble Masonry |
| 5 | Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification (A) Granular material |
| 6 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 7 | (SH :- RRM Retaining Wall - 4.00 mtr ht. & 28.10 mtr Length) |
| 8 | Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering) |
| 9 | PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 10 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical SpecificationRandom Rubble Masonry |
| 11 | Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification (A) Granular material |
| 12 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 13 | (SH :- RRM Retaining Wall - 3.00 mtr ht. & 15.00 mtr Length) |
| 14 | Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering) |
| 15 | PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 16 | Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical SpecificationRandom Rubble Masonry |
| 17 | Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification (A) Granular material |
| 18 | Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications |
| 19 | (SH:- Storm water drain of Length 227.85m) ( Section B :- Internal size:- Bottom-1.00, Top-1.875 & Depth 1.75 Mtr. ) |
| 20 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering)Manual MeansDepth upto 3 m |
| 21 | Dry rubble Flooring |
| 22 | PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days. |
| 23 | Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical SpecificationsRandom Rubble Masonry |
| 24 | Providing and laying cement concrete 1 : 1.5 : 3 (1 cement : 1.50 coarse sand : 3 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth |
| 25 | 15 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall. |
| 26 | Neat cement punning. |
| 27 | Centring and shuttering including strutting proping etc. and removal of form work for : foundation and plinth. |
| 28 | Carriage of Engineering materials by manual means (Head Load) like Cement, Steel, CGI sheet, Stone, Sand etc as per the direction of Engineer-incharge.(Lead=0.145Km) |
| 29 | ( SH :-RCC Wall10.00 m Height & 28.00 m Length) |
| 30 | Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, intoplinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m. |
| 31 | Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering. |
| 32 | Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete. |
| 33 | b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc. |
| 34 | Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcementin :1 : 1: 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size) M25. |
| 35 | Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :1 : 1: 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size) M25. |
| 36 | Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/ TMT Steel |
| 37 | Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification Granular material |
| 38 | Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications |