Housing Urban and Rular Development Government Departments Closing in 0 days TDR #42083020

Construction Of Protection Wall And Storm Water Drains At Bomdila District Hq

Issued by Government Departments · bomdila, Arunachal Pradesh
Tender Value
1.97 Crore
Estimated cost
Bid Submission
12 Feb 2024
0 days left
EMD
1.97 Lakhs
Bank guarantee accepted
Document Fee
2000
Non-refundable
Tender Type
Online

Tender Overview

Competition Type
NCB
Bidding Type
Tender
Location / State
bomdila → Arunachal Pradesh
EMD Exemption
Not Available
Quantity
Not Available

Project Description

Construction Of Protection Wall And Storm Water Drains At Bomdila District Hq

BOQ

Name of Work:C/o Protection Wall and Storm Water Drains at Bomdila District HQ.
Sl. No. Item Description
1(SH :- RRM Wall -- 5.95 mtr ht. & 25.00 mtr Length)
2Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
3PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
4Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical SpecificationRandom Rubble Masonry
5Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification (A) Granular material
6Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
7(SH :- RRM Retaining Wall - 4.00 mtr ht. & 28.10 mtr Length)
8Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
9PCC 1:3:6 in FoundationPlain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
10Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical SpecificationRandom Rubble Masonry
11Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification (A) Granular material
12Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
13(SH :- RRM Retaining Wall - 3.00 mtr ht. & 15.00 mtr Length)
14Excavation for StructuresEarth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material( without de-watering)
15PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
16Stone masonry work in cement mortar 1:3 in foundation complete as drawing and Technical SpecificationRandom Rubble Masonry
17Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification (A) Granular material
18Providing weep holes in Brick masonry/Plain/Reinforced concrete abutment,wing wall/return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical specifications
19(SH:- Storm water drain of Length 227.85m) ( Section B :- Internal size:- Bottom-1.00, Top-1.875 & Depth 1.75 Mtr. )
20Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material (without de-watering)Manual MeansDepth upto 3 m
21Dry rubble Flooring
22PCC 1:3:6 in Foundation Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
23Stone masonry work in cement mortar 1:3 for substructure complete as per drawing and Technical SpecificationsRandom Rubble Masonry
24Providing and laying cement concrete 1 : 1.5 : 3 (1 cement : 1.50 coarse sand : 3 stone aggregate 20 mm nominal size) excluding the cost of centring and shuttering in :a) Foundations and plinth
2515 mm cement plaster 1 : 3 (1 cement : 3 fine sand) on the rough side of single or half brick wall.
26Neat cement punning.
27Centring and shuttering including strutting proping etc. and removal of form work for : foundation and plinth.
28Carriage of Engineering materials by manual means (Head Load) like Cement, Steel, CGI sheet, Stone, Sand etc as per the direction of Engineer-incharge.(Lead=0.145Km)
29( SH :-RCC Wall10.00 m Height & 28.00 m Length)
30Earth work in excavation in foundation and trenches in soils containing 50% or more of shingle or small size boulders upto 30 cm size, lift upto 1.50 m and stacking the excavated soil not more than 3 m clear from the edge of the excavation and returning the stacked soil in 15 cm layers when required, intoplinth, sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as directed within a lead of 50m.
31Providing and laying in foundations and plinth cement concrete 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size) excluding the cost of centring and shuttering.
32Centring and shuttering including strutting, propping etc and removal of form work for :a) Foundation, footings, bases of columns etc. and mass concrete.
33b) Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
34Reinforced concrete work in foundations, footings, bases of columns etc. and mass concrete excluding cost of centring, shuttering and reinforcementin :1 : 1: 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size) M25.
35Reinforced cement concrete in walls (any thickness) including attached pillasters, buttresses, plinth and string course, fillets etc from top of foundation up to floor two level including finishing and plastering the exposed surfaces with cement mortar 1 : 3 (1 cement : 3 fine sand) of thickness not exceeding 6 mm to give a smooth and even surface excluding cost of centring, shuttering and reinforcement in :1 : 1: 2 (1 cement : 1 coarse sand : 2 stone aggregate 20 mm nominal size) M25.
36Reinforcement of RCC work including bending, binding and placing in position complete.b) Tar/ TMT Steel
37Back filling behind abutment,wing wall and return wall complete as per drawing and Technical specification Granular material
38Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications

AI Tender Summary

OUR REF NO 42083020
AUTHORITY Government Departments
TENDER VALUE 1.97 Crore
LAST DATE 12-02-2024
Authority
Authority Name Public Works Department
Work Description Construction Of Protection Wall And Storm Water Drains At Bomdila District Hq
Basic Detail
Tender No BDL/TandA-23/BDL/2023-24/196
Bidding Type Tender
Location
City bomdila
State Arunachal Pradesh
Key Dates
Publish Date 07 Feb 2024
Submission Date 12 Feb 2024
Open Date 13 Feb 2024
Finance
Tender Value 1.97 Crore
Tender Fee 2000
EMD 1.97 Lakhs
Exemption Not Available
Document List
5a40474b-6725-42cb-ac08-bb1c2d0bdb41.html
BOQ_1793.xls
Tendernotice_1.pdf
Tendernotice_2.pdf

Unlock Full AI Tender Summary

Get instant access to the complete AI-generated analysis — scope, eligibility, timeline & more.

Instant Access Secure Free
Your details are secure and used only for document delivery.

Tender Timeline

Feb 07, 2024
11:30 IST

Tender Published

Tender notice published.

Completed
Feb 12, 2024
17:00 IST

Bid Submission Deadline

Online submission via eProcurement portal.

Completed
Feb 13, 2024

Bid Opening Date

Technical bids will be opened and evaluated.

Completed

Tender Documents

Download All (ZIP) ↓
html

5a40474b-6725-42cb-ac08-bb1c2d0bdb41.html

xls

BOQ_1793.xls

pdf

Tendernotice_1.pdf

pdf

Tendernotice_2.pdf

Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

TenderDetail
Loading tenders