| 1 | Vegetation Clearance to a depth of 60 cm from the ground level or 30 cm from the structures without disturbing the adjoining structural members and protecting the structures from any type of damages, refilling the holes/hollows/ground area formed by digging for uprooting tree &stumps with earth/stones well rammed, refilling the cavities arising out of the trees removed from the fort/structure with same members if available at site so that the surface at these points confirm not allowing to re-grow of trees from the roots if any remains in the core/ground, pruning of wood, branches, twigs of any trees as directed if any, applying weedicide if any, stacking all useful trunks/logs/materials arising out from the cleaning and grabbing operations, disposing all unserviceable materials far away or fired in piecemeal, including the cost of tools, scaffoldings equipments and incidentals necessary to complete the work execution etc., complete as directed by the site in charge of work. |
| 2 | De-watering (Bailing out the dirty water) the dirty water are very in organic impurities and night soils from a depth of 7.60 mtrs . (Lift) and to lead of 30 mtrs using 10 HP oil motors and 6\" hose pipes after removing the quatic growth including hire of machinery ,fuel charges and labour charges etc complete as directed by the site in charge of work. |
| 3 | Desilting the sludge from ancient water tank upto avg. depth of 3.00 mtrs for safety of devotees and to avoid untoward incidents. Desilting by way of using including hiring charges of tractors etc. complete as directed by the site in charge of work. |
| 4 | Pointing to the Steps of ancient water tank alround with Lime Mortar 1:1:1 and finely finishing the surfaces with an addition of extract like Gallnut and Joggery natural additives with hand grinding and finish neatly to the surfaces as per original including cost, conveyance of all materials, labour charges, curing, Machine grinding, coloring, seigniorage charges etc. complete as directed by the site in charge of work. |
| 5 | Construction of Coursed rubble masonry with hard stone (first or second sort) in superstructure above plinth level and upto floor five level. 7.8.2 Masonry work (first sort), in cement mortar 1:6 (1 cement : 6 coarse sand) including all taxes etc complete as directed by the site in charge of work. |
| 6 | Pointing to Cr stone dwarf wall with cement mortar 1:4 alround the ancient tank including GST etc complete as directed by the site in charge of work. |
| 7 | Providing PCC (1:2:4) using 20mm HBG metal for providing coping to the dwarf wall all-round the site (of size 120x200m) as per the design to check the stray animals and for safety and security purpose of the site including cost, conveyance of all materials, labor charges for head loads, loading and un loading, conveyance charges, placing, curing charges of concrete, GST and other applicable taxes if any etc. complete as directed by the site in charge of work. |
| 8 | Providing MS Grill fencing by using 50X50X6mm. \"L\" Angle as vertical post and Horizontal @equal intervals and 20mm. M S Square bar at 20 Cm. C/C., 20X5mm. MS Flat for Design and fixing in position with bolt and nut in Cement Concrete 1:4:8, including Digging Pit of size 0.30 X 0.30 X 0.45 m in Existing R R Masonry for fixing grill, Painting to M S Grill with approved Enamel Paint etc. including cost of materials, Labour charges and conveyance etc. complete as directed by the site in charge of work. |
| 9 | Providing enamel painting two coats over a primary coat of red oxide including cost, conveyance of all materials, labour charges etc. complete as directed by the site in charge of work. |
| 10 | Resetting of the steps wherever missed 15% of overall area including cost of labour, material etc complete as directed by the site in charge of work. |