Name of work : Improvements to Riding Quality at Km 9/800 – 10/900 of Pallikonda – Palamaneri Road (SH-127)
Sl. No.
Item Description
1
Tack coat- Providing and applying tack coat with bitumen emulsion (RS-I type) using emulsion pressure distributor at the rate of 0.20 kg per sqm on the prepared bituminous/granular surface cleaned with mechanical broom as per clause 503 of MORTH Specification- over bituminous surfaces. MORTH No. 111,112,501,503,900
2
Bituminous Macadam - Providing and laying bituminous macadam with Hot mix plant using crushed aggregates of specified grading premixed with bituminous binder (Viscosity Grade 30), transported to site, laid over a previously prepared surface with paver finisher to the required grade, level and alignment and rolled as per clauses 501.6 and 501.7 to achieve the desired compaction, complete as per clause 504of MORTH Specification (MORTH No. 111, 112, 501, 505 & 900)(Table 500-7) - Grading II.
3
Bituminous Concrete (Table500-17) - Providing and laying Bituminous Concrete with Hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (Viscosity Grade-30) at percentage specified by Job Mix Formula of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher to the required grade, level and alignment, rolled as per clause 501.6 and 501.7 to achieve the desired compaction as per clause No. 507 of MORTH Specification complete in all respects (MORT&H Nos. 111, 112, 501, 507 & 900) - Grading II.
4
Excavation for Roadway and drainage Excavation including removal and satisfactory disposal of all materials necessary for theconstructionof roadway and side drains in accordance with the specifications andthe lines, grades and cross sections shown in the drawings or as indicated by the Engineer,as per MORTH Specification. Carted earth with an average lead of 1km
5
Calculation of SubTotal, GST and Total Amount carried out by system automatically
6
Basic cost of value put to tender as per estimate
7
Add GST at 18%
8
Total Value put to Tender
9
Quoted value
10
Final Quoted Value
11
Add GST at 18% of Final Quoted Value
12
Total Value of Contract Including 18% of GST
13
Basic cost of value put to tender as per Estimate
14
Quoted Rate in Figures (Total Value of Contract Including 18% of GST )
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.