Tender For Providing And Installment Of Cng Based Crematorium For Animal In Mc Ambala City, ambala-Haryana

Urban Local Bodies has published Tender For Providing And Installment Of Cng Based Crematorium For Animal In Mc Ambala City. Submission Date for this Tender is 02-03-2024. Cremetorium Tenders in ambala Haryana. Bidders can get complete Tender details and download the document.




Tender Notice

42061412
Corrigendum : Tender For Providing And Installment Of Cng Based Crematorium For Animal In Mc Ambala City
Open Tender
Indian
Haryana
ambala
02-03-2024

Tender Details

Tender For Providing And Installment Of Cng Based Crematorium For Animal In Mc Ambala City- 1 Cng Cremation Furnace For Big Cattle:-The Cremation Furnace Designed, Supply, Installation, Testing And Commissioning Manufacture In Latest Technology With Double Chamber System With Safety Indication Lamp During The Working Unit As Such A Way That Each Furnace Efficient Working In Minimum Time Cremation. Generally A Maximum Temperature Of 850°C To 1100 Can Be Brought, Though The Operating Temperature Required Is 550°C. With Double Chambers, One Primary Other Secondary And 2 Burners Are Required For Each Furnace ( Bad Mass Self Exhaust System Having Size 700 X 700 X 1.5 Mm:-I ) Overall Size:- 3300Mm ( L ) X 3700Mm ( H ) X 2500Mm ( W ) .Ii ) Working Chamber Size ( Inside ) :- 2750Mm ( L ) X 1000Mm ( H ) X 1370Mm ( W ) .Iii ) Frame Make With Ms Steel Structural With U Channel Sail / Equivalent Size:- 75Mm X 4Mm. 2 Refractory Lining Of The Furnace And Insulationhot Face Insulation Bricks, Ceramic Fiber, Dead Body Support Will Be Cng Furnace With Dual Chamber Primary And Secondary. Highly Efficient Insulation For Maintain The Temperature With 6 Step In Be Used Of 70% Fire Bricks ( Mahakoshal / Equivalent ) , 40% Fire Bricks Good Quality, Light Weight Insulation Brick, 1” Fibber Insulation Board Good Quality, Red Bricks With Plaster And Frame Work With Fibber Insulation And Ss Sheet 304 Grade, 0.8Mm Of Proper Thickness That Is 570 Mm Shall Be Provided In Order To Operate The Furnace With Minimum Gas Consumption And Lost The Temperature Burner Block And Dead Body Supporter Should Be Used ( Burner Block Size :- 225Mm X 225Mm Or 300Mm X 300Mm ) ( Dead Body Supporter Size:- 600Mm X 300Mm X 75Mm ) Reputed Make Mahakoshal / Equivalent 70%. ( Centre Two No 100Mm ) 3 Frontdoors Mechanicaldrivesystemandcounterweight Etc.The Front Doors Made Of Ms Base Sheet 2Mm In Front Side Sheet Duly Fabricate The Frame Of Ms Angel / Channel Fill With High Complete Insulation Material With 1.5” Fibber Insulation Board And Ss Rod 8Mm Inside For Hold The Insulation Door Operation Material.Consists Of Front Door Pressing Handle Of 190Mm ( Dia ) Handle And 16Mm Thickness.Consists Of Front Gate Screws And Castions Nuts Having 350Mm Length X 40Mm Diameter.Provided With Gate Pulleys 2 Nos Having Diameter 300Mm X 25Mm Thk X 50Mm Id X Key Nays Of 10X5mm.Provided With Big Gears Duplex 250Mm Diameter X 30Mm Thk Provided With Small Gear Bottom Size With 100Mm X 30Mm Thk Safety Guard For Driving End Of Door.Consist Of Main Shaft Of 1600Mm Long X 50Mm Dia With Key Ways, And Plummer Block Having Sizes Of 50Mm And 30Mm Of Reputed Make Skf / Fag. 4 Track And Charging Trolley.Made By Section Of Size 100Mm X 50Mm X 5Mm Channel Provided With Complete Arrangements For Uplift And Lowering Of Body, Provided With C.I. Wheels Side Plate Assembly 1000Mm Long X 50Mm Width Having Wheel Plats Of Size 190Mm X 10Mm Thk Provided With Guided Wheels Size 80Mm X 20 Mm ( Thk ) Pins Complete With Trolley Supporter 5 Dead Body Of Heavy Cattles For Loading On Trolley System With Hoist Having Capacity 500 Kgs Lifting 6 Chimney 30000Mm ( 30Mtr ) Height With Frequency Check, Staad Design, Loading On Platform, Seismic Analysis, Sf And Bm Due To Eq, Deflection Check, Bolt Tension Calc. Ab And Bp ( 30M ) Etc As Per Wind Pressure Approved By Chartered Engineer.I ) Foundation Bolts L-Type:- 32Mm ( Dia ) X1250mm ( L ) With Nuts And Washer X 50Mm Long Thread.Conems Cone 1250Mm Bottom Dia X 8Mm Thickness X 3000Mm Heighti ) Base Plate:- 1500Mm X 1500Mm X 25Mm Thickii ) Top Size Of Cone Welded With 25Mm Thick Flange Suitable For Fixing With Pipe.Iii ) Service Window 600Mm X 600Mm.Iv ) Ribs : 15Nos: 600Mm X 200Mm X 10Mm Pipejindal / Equivalent Reputed Make 300Mm Dia X 5Mm Thick With 18Mm Flange Welded Both Sides, Having 20Mm Dia Holes Suitable For Fixing 18Mm Diahigh Tensile Boltsi ) Having 15 Nos Of Ribs 125Mm X 100Mm X10mm Thick With Top Safety Cap .Ladder With Safety Cagemonkey Type Ladder With 35X3 Ms Angle. Plate Form 01 Nos. For Smoke Testing With Gi Earthling Strip 25X3 With Arrester With Indication Aviation Light.Ms Chimney Structure Duly Painted With Heat Resistance Aluminum Paint Bottom To Top 7 Ss Wet Scrubber For Gases And Pollution Control Size 1000 X 500 X 500 Total 1200Mm ( L ) With Ss 304 Horizontal Round Shape.Wet Scrubber Will Be Provided For Gases And Pollution Control Size Of Based Dia 800Mm X 2.5Mm Thick X 1200Mm ( L ) Sprinkler 5Mm 8Nos With Ss Fitting And Ss Socket 2 Nos Baffle Plat 2 Nos 800Mm X 25Mm Hole X 50Mm Pitch Thick 2.5Mm Outlet Ss 304 Pipe Lines, Valves And Necessary Pumping With Water Hold System For Low Temp. Of The Scrubber Unit Fitted On Water Tank, Minimum 1000 Lt Capacity Pvc Over Head Tank For Each Unit Furnace. Required With Exhaust Fan, Tube Light For Main Hall And Scrubber Room.Heavy Duty Belt Driven 3 Hp Id Blower Fitted In Scrubber To Chimney:- Blower Size Dia:- 840Mm X 380Mmcfm :- 7000Motor:- 5 Hp 3 Phase Compton Make Rpm :- 1200Body Dia :- 840Mm Inlet / Outlet :- 250Mmbody Type:- Body M.S. 2.5Mm Thick With Red Oxide And Painted Joints Type :- M.S. Flange 8 Internal Gas Pipe Lines And Gas Train.All The Internal Gas Pipelines 2” Seamless 3.5Mm Jindal And Equivalent Reputed Make Will Be Welded With Leak Prove Gasket As Per The Norms Of Igl. Piping Of Gas Line From Igl Source To Furnace With Power Failure Safety Value And By-Pass System And Gas Train Would Be Fitted In Main Gas Pipeline To Reduce The Pressure By Fitting The Regulator, Gauges, Hose Pipes, Steel Nipples, S.S Valves, Pressure Switch Etc. 9 Electrical Control Panel For Cng Furnace Auto Ignition And Temp, Electrical Control Panel Size:- 1000Mm ( L ) X 300Mm ( D ) X 750Mm ( W ) With Heat Removing Inside Of Control Panel With 3 Phase Over Load Mcb Cot Off, Individual 3 Phase Mcb , Control Mcb, I.D. Fan Contactor Andamp: Over Load Rely, Water Feeding Motor Contactor, Gas High-Pressure Cot / Off On / Off Switch, Indication Led , Flame Failure Buzzer, Burner Auto / Manual Rely, Volt / Ampere / Hz. Indicator, Temperature Controller 0 – 1200 Deg. Centigrade, Thermocouple And Compensating Lead , Out Put Warring Etc 10 Suitable Burner For Primary Chamber 2Nos X 1, 70, 000 / - 11 Ducting Scrubber To Chimney 12 Cng Gas Fired Fully Automatic Burner For Secondary Chamberin Belt Blower Single Phase, Auto Ignition , Ignition Electrode, Auto Sequencecontroller.

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 28-Feb-2024 date extended Date 02-03-2024

Key Value

Document Fees
INR 10000 /-
EMD
INR 300000.0 /-
Tender Value
Refer document

BOQ Items

providing and installment of cng based crematorium for animal in MC Ambala City
Sl. No. Item Description
1CNG Cremation furnace for big cattle:- The cremation furnace designed, supply, installation, testing and commissioning manufacture in latest technology with double chamber System with safety indication lamp during the working unit as such a way that each furnace efficient working in minimum time cremation. Generally a maximum temperature of 850°C to 1100 can be brought, though the operating temperature required is 550°C. With double chambers, One primary other secondary and 2 burners are required for each furnace (BAD MASS SELF EXHAUST SYSTEM HAVING SIZE 700 x 700 x 1.5 MM:- i) Overall Size:- 3300mm(L) x 3700mm(H) x 2500mm(W). ii) Working Chamber Size (inside):- 2750mm(L) x 1000mm(H) x 1370mm(W). iii) Frame make with MS Steel Structural with U Channel SAIL/ equivalent size:- 75mm x 4mm.
2Refractory lining of the furnace and Insulation Hot face insulation bricks, Ceramic fiber, dead body support will be CNG furnace with dual chamber primary and secondary. Highly efficient insulation for maintain the temperature with 6 step in be used of 70% fire bricks (Mahakoshal/ equivalent), 40% fire bricks good quality, light weight insulation brick, 1” fibber insulation board good quality, red bricks with plaster and frame work with fibber insulation and SS sheet 304 grade, 0.8mm of proper thickness that is 570 mm shall be provided in order to operate the furnace with minimum gas consumption and lost the temperature burner block and dead body supporter should be used ( Burner Block Size :- 225mm x 225mm or 300mm x 300mm) (Dead Body supporter Size:- 600mm x 300mm x 75mm) reputed make Mahakoshal/ equivalent 70%. (Centre two no 100mm)
3FrontDoors mechanicaldrivesystemandcounterweight etc. The front doors made of MS base Sheet 2mm in front side sheet duly fabricate the frame of MS angel/channel fill with high complete insulation material with 1.5” fibber insulation board and SS rod 8mm inside for hold the insulation door operation material. Consists of front door pressing handle of 190mm (dia) handle and 16mm thickness. Consists of front gate screws and castions nuts having 350mm length x 40mm diameter. Provided with gate pulleys 2 Nos having diameter 300mm x 25mm thk x 50mm ID x key nays of 10x5mm. Provided with big Gears duplex 250mm diameter x 30mm thk Provided with small gear bottom size with 100mm x 30mm thk Safety guard for driving end of door. Consist of main shaft of 1600mm long x 50mm dia with key ways, and Plummer block having sizes of 50mm and 30mm of Reputed make SKF/FAG.
4Track and Charging Trolley. Made by section of size 100mm x 50mm x 5mm channel provided with complete arrangements for uplift and lowering of body, provided with C.I. wheels side plate assembly 1000mm long x 50mm width having wheel plats of size 190mm x 10mm thk provided with guided wheels size 80mm x 20 mm (Thk) pins complete with trolley supporter
5Dead body of Heavy Cattles for loading on trolley system with hoist having capacity 500 kgs lifting
6Chimney 30000mm(30mtr) height with frequency check, STAAD Design, loading on platform, seismic analysis, SF and BM DUE TO EQ, Deflection Check, Bolt Tension Calc. AB and BP (30m) etc as per wind pressure approved by Chartered Engineer. i) Foundation Bolts L-type:- 32mm(dia)x1250mm(L) with nuts and washer x 50mm long thread. Cone MS Cone 1250mm bottom dia x 8mm thickness x 3000mm height i) Base plate:- 1500mm x 1500mm x 25mm thick ii) Top size of cone welded with 25mm thick flange suitable for fixing with pipe. iii) Service window 600mm x 600mm. iv) Ribs : 15Nos: 600mm x 200mm x 10mm Pipe Jindal/ equivalent reputed make 300mm dia x 5mm thick with 18mm flange Welded Both Sides, having 20mm dia holes suitable for fixing 18mm dia high tensile bolts i) Having 15 Nos of ribs 125mm x 100mm x10mm thick with top safety cap . Ladder with safety cage Monkey type ladder with 35x3 MS Angle. Plate Form 01 Nos. for Smoke testing with GI earthling strip 25x3 with arrester with indication Aviation light. MS Chimney structure duly painted with heat resistance aluminum paint bottom to top
7SS Wet Scrubber for Gases and Pollution control size 1000 x 500 x 500 total 1200mm(L) with SS 304 horizontal round shape. Wet scrubber will be provided for gases and pollution control size of based dia 800mm x 2.5mm thick x 1200mm(L) Sprinkler 5mm 8Nos with SS fitting and SS Socket 2 Nos baffle plat 2 Nos 800mm x 25mm hole x 50mm pitch thick 2.5mm Outlet SS 304 pipe lines, valves and necessary pumping with water hold system for low temp. of the scrubber unit fitted on water tank, minimum 1000 Lt capacity pvc over head tank for each unit furnace. Required with exhaust fan, tube light for main hall and scrubber room. Heavy duty Belt Driven 3 HP ID Blower fitted in scrubber to chimney:- Blower Size Dia:- 840mm x 380mm CFM :- 7000 Motor:- 5 HP 3 Phase Compton Make RPM :- 1200 Body Dia :- 840mm Inlet/ Outlet :- 250mm Body Type:- Body M.S. 2.5mm Thick with Red Oxide and painted Joints Type :- M.S. Flange
8Internal Gas pipe Lines and Gas Train. All the internal gas pipelines 2” seamless 3.5mm jindal and equivalent reputed make will be welded with leak prove gasket as per the norms of IGL. Piping of gas line from IGL source to furnace with Power failure Safety value and by-pass system and Gas train would be fitted in Main Gas pipeline to reduce the pressure by fitting the regulator, gauges, Hose pipes, steel nipples, S.S valves, Pressure Switch etc.
9Electrical Control Panel for CNG Furnace auto ignition and temp, Electrical Control Panel Size:- 1000mm(L) x 300mm(D) x 750mm(W) with heat removing inside of Control panel With 3 Phase Over Load MCB COT OFF, Individual 3 Phase MCB , Control MCB, I.D. Fan Contactor andamp: Over load Rely, Water Feeding motor Contactor, Gas High-pressure Cot /Off On/Off Switch, Indication LED , Flame Failure Buzzer, Burner AUTO/ MANUAL Rely, Volt / Ampere / Hz. Indicator, Temperature Controller 0 – 1200 Deg. Centigrade, Thermocouple and Compensating Lead , Out Put Warring etc
10Suitable Burner for primary chamber 2Nos x 1,70,000/-
11Ducting Scrubber to chimney
12CNG Gas fired fully automatic burner for secondary chamber In belt Blower Single Phase, Auto Ignition , Ignition electrode, Auto Sequence Controller.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail