| 1 | Description of items and specification ofwork to be excuted. |
| 2 | Making the area workable by clearing weeds including removal of vegetation, grass, shrubs, bushes and disposalof rubbish up to a distance of 50m outside the periphery of the area cleared etc. complete. |
| 3 | Earth work in excavation by mechanical means / manual mean in foundation trenches or drains, including dressing of sides and ramming of bottom, lift up to 1.50 m, including getting out the excavated soil directed, within a lead of 50 m. All kind of soil. |
| 4 | Levelling & dressing the undulated area by cutting/digging the surplus earth & Spreading in the low laying area by compacting and using the water & disposal of Surplus earth/ boulder outside the working area with lead up to 100 mtr by head load etc complete. |
| 5 | Providing and laying cement concrete 1:4:8 (1cement: 4 coarse sand: 8 stone aggregate of 40 mm nominal size) in foundation of boundary wall including ramming, compacting, and curing etc. complete. |
| 6 | Random rubble masonry of boundary wall with cement mortar 1:6 (1 cement : 6 coarse sand) in foundation and plinth including levelling up with cement concrete 1:6:12 (1 cement : 6 coarse sand : 12 graded stone aggregate 20 mm nominal size) up to plinth level etc. complete |
| 7 | Providing and laying in position in cement concrete DPC on ground level of Dwarf wall in 1:2:4 (1 Cement : 2 C.Sand : 4 Stone aggregate) nominal size 20mm including ramming, compacting, and curing etc. complete. |
| 8 | Random rubble masonry of boundary wall with cement mortar 1:6 (1 cement: 6 coarse sand) in superstructure including levelling up with cement concrete 1:6:12 (1 cement: 6 coarse sand: 12 graded stone aggregate 20 mm nominal size) upto plinth level etc complete. |
| 9 | Providing and laying cement concrete 1: 1½ :3 (1cement : 1½ coarse sand : 3 stone aggregate of 20 mm nominal size) for fixing of MS grill panel in concrete block (size 0.20 x 0.20 x 0.30mtr) including ramming, compacting, and curing etc complete. |
| 10 | Form work of centering and shuttering including strutting, propping etc and removal of form for roof height of 3 mtr height including labour and material etc complete. Coping |
| 11 | Providing and laying cement concrete incoping etc., up to floor five level, excluding the cost of centering, shuttering and finishing 1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) as per directions given by engineer-in-charge. |
| 12 | Supply and fixing of MS grill fencing with 2 vertical angle ISELA 50x50x6mm of length 1.30m with horizontal angle of 50x50x6mm welded at the bottom of length 0.20m and MS angle 40x40x6mm horizontal support in top & bottom of length 1.50m of the frame & 10mm square bar rounded on top and placed vertically at a distance of 150mm c/c and fixed together by nut bolt including cutting, hoisting and fixing in position and applying a priming coat of approved steel primer etc complete as per design/drawing attached. (Panel size 1.50 x 1.30 mtr) |
| 13 | Flush/ Ruled pointing of outer side of toilet block on stone work with cement mortar 1:3 (1 cement: 3 fine sand) etc complete. |
| 14 | Supply and fixing of MS Gates with M.S. Post, MS Angles, M.S. Square Bars rounded on top of required size by nut bolt including cutting, hoisting and fixing in position and applying a priming coat of approved steel primer etc complete as per design/drawing attached. (gate size 4.00 x 3.00 mtr) |
| 15 | Finishing with Epoxy paint (two or more coats) on MS structure at all locations prepared and applied as per manufacturer\"s specifications including appropriate priming coat, preparation of surface, etc complete. |
| 16 | Supply of water tanker 5000 ltr capacity for masonry work and water curing purpose. |
| 17 | Disposal of unwanted waste material / malba received from the site during the work after stacking and measuring by mechanical transportation upto lead of 5 km from site area for site clearance and good appearance. (Note - It is for estimate purpose only actual qty. will be measured and recorded during execution of the work) |