| 1 | Dismantling brick work of stone work in line or cement mortar and including staking of material as directed be the engineer in charge within a distance of 60 meter (200 feet) S.I.No. 692 |
| 2 | Excavation in foundationin il complete all work as per SI.No. 251(a) Column Wall Septik tank |
| 3 | E/W cutting or in embankment for making road formation with carted earth lead upto 5Km. |
| 4 | Cement concrete with 2cm gauge brick ballast, fine sand & cement proportion of 1:4:8 complete work as per SI.No. 281 Column Wall Septik Tank |
| 5 | Reinforced cement concrete work for RCC raft fiundation and Footing with 4Cm gauge stone ballast SI.No. 287 Column footing Plinth Beam Septik Tank |
| 6 | Reinforced Cement Concrete work for RCC T-Bram & Slab roof and RCC Column. SI.No.288 Column T Beam Roof Septik Tank |
| 7 | Supplying, Fitting and Placing un-coated HYSD bar Reinforcemnt in Foundation complete as per Drawing and Technical Specifications. |
| 8 | Microclass brick work of mix 1:4 cement and course sand as per S.I.N o. 305(a) Bathroom Ded Door Septik Tank |
| 9 | 12mm thick cement plaster with cement & coarse sand of mix 1:4 complete S.I.No. 584 New Item Bathroom Ded Door |
| 10 | Providing and fixing 1st quality ceramic glazed floor tiles conforming to S.I.No, 15622 (thickness to be specified by the manufacturer) of approved make in all colours, shades except burgundy, bottle green, black of any size as approved by Engineer-in- charge in skirting, risers of steps and dados over 12mm thick bed of cement Mortar 1:3 (1 cement : 3 coarse sand) and jointing with grey cement slurry @ 3.3Kg per Sqm including pointing in white cement mixed with pigment of matching shade compkete. S.I.No. 628 Room Room Skirting Room Skirting outer Ded Door |
| 11 | Providing and fixing 1mm thick M.S. Sheet garge door with frame of 40x40x6mm (11/2”x11/2”x1/4”) angle iron 3.15mm(1/8”) thick M.S. gusset plate at the junction and corners including supply and fixing of necessary fittings. Lock rail of 15” length of oxidised iron and includding pintels hooks at the top and applying priming coat of red lead paint on all sides complete. (a) Using M.S. Angles 40x40x6mm (11/2”x11/2”x1/4”) for diagonal bracings. S.I.No. 517 Bathroom & toilest |
| 12 | 2Cm (1”) thick 1:2:4 plain cement concrete floor with cement, approved coarse asand and 2cm. (1”) graded approved stone grit, laid in panels finished with 3mm. (1/8”) floating coat of neat cement of cement and marble dust in ratio 5:1 as specified over and including 8cm (3”) thick base concrete consisting of cement, fine sand of 1.25 fineness moudulus and brick ball. (11/2” gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joints ofbenals if any and giving them a uniform finish, including supply of all materials, labour, tools & plants etc required for proper completion of the work S.No. 600 Bathroom |
| 13 | Providing and fixing W.C. squatting pan (indian type W.C. Pan) D.S.R. 202117.1.1 |
| 14 | Providing and fixing wash basin with C.l. braxkets, 15mm C.P. brass pillar taps, 32mm C.P. brass waste of standard pattern, including painting of fitting and brakests, cutting and making good walls wherever require: White viteous China wash basin sixe 630x450mm with a pair of 15 mm C.P. brass pillar tap D.S.R. 2021 17.7.1 |
| 15 | Providing and fixing C.P. brass long body bib cock of approved quality conforming to IS standards and welghing not less then 690gms 15mm nominal bore.D.S.R. 2021 18.51.1 |
| 16 | Providing wall putty on new surface with approved quality material of Berger/J.K./Birla of similar make 2 Coat S.I.No. 15.26 Area same as plaster after deducation tile area |
| 17 | Distempering Two Coat for wall S.I.No. 649 & 650 Area same as plaster after deducation tile area |
| 18 | Painting or varnishing work in small areas or new wood work with one coat (upto one square metre of ready mixed priming paint and one coat of approved superior quality ready mixed paint or varnish including supply of all materials, labour, tools & paint to be used should confirm the S.I.No. 103-1950 S.I.No. 641+642 Bathroom & Toilet Area same as plaster after deducation tile area |
| 19 | Providing and fixing Chlorinated Polyvinyl(CPVC) pipes, having thermal stability for hot & cold water supply, including all CPVC plain & brass threaded fittings, including fixing the pipe with clamps at 1.00 m spacing. This includes jointing of pipes & fittings with one step CPVC solvent cement and testing of joints complete as per direction of Engineer in charge. 15mm nominal dia pipes D.S.R. 18.7 |
| 20 | Providing and placing on tarrace (at all floor levels) polythylene water storage tank, IS : 12701 marked, with cover and suitable locking arrangement and making necessary holes for inlet outlet and overflow pipies but without fitting and the base support for tank, DSR 18.48 |
| 21 | Add GST 18% |