Stack Gas Analyser Extractive For Nrl , Supply Of Following Items On Fot Despatch Point Basis , Group A: Mr Item Sl.No. 1.0001: Tag No.: 003-Stk-0001, Stack Analyzer (Sox/ Nox, Co And Spm) - Qty: 1 Lot Mr Item Sl. No. 1.0001.01: Tag No.: 03-Ae/At-7702, Spm Analyzer - Qty: 1 Nos Mr Item Sl.No. 1.0001.02: Tag No. 03-Ae/At-7704, Co Analyzer - Qty.: 1 Nos Mr Item Sl.No. 1.0001.03: Tag No. 03-Ae/At-7703A/B, Sox/Nox Analyzer - Qty.: 1 Nos Mr Item Sl.No. 1.0001.04: Tag No. 03-As-103, Network Panels At Analyzer Room And Control Room, Interconnecting Serial Communication Cables & Fo Cable - Qty.: 1 Lot , Group B: Mr Item Sl. No.: 1.0002: Tag No.: 03-At-O2-Zir, Oxygen Analyzers (Zirconia) At Dcu Furnace, Qty: 1 Lot Mr Item Sl. No.: 1.0002.01: Tag No.: 03-Ae/At-7701, Oxygen Analyzers (Zirconia), Qty: 1 Nos Mr Item Sl. No.: 1.0002.02: Tag No.: 03-Ae/At-7751, Oxygen Analyzers (Zirconia), Qty: 1 Nos , Supervision Of Erection, Testing And Commissioning Of Items As Per Special Instructions To Vendor (Cl. B25) Enclosed With Mr. (Note: For Evaluation Purpose 10 Mandays For Group A And 5 Mandays For Group B Shall Be Considered. However Payment Shall Be Done Based On Actual Mandays.) , Per Diem Charges For 8 Hours Work On Normal Working Day - For Group A: Tag No.: {8}003-Stk-0001, For Mr Item 1.0001 , Overtime Rate/Hour Beyond Normal 8 Hours Work On Normal Working Days - For Group A: Tag No.: {8}003-Stk-0001, For Mr Item 1.0001 , Overtime Rate/Hour For Work On Weekly Off Days/Holidays (As Applicable To Refinery Site) - For Group A: Tag No.: {8}003-Stk-0001, For Mr Item 1.0001 , Per Diem Charges For 8 Hours Work On Normal Working Day - For Group B: Tag No.: {8}03-At-O2-Zir, For Mr Item 1.0002 , Overtime Rate/Hour Beyond Normal 8 Hours Work On Normal Working Days -For Group B: Tag No.: {8}03-At-O2-Zir, For Mr Item 1.0002 , Overtime Rate/Hour For Work On Weekly Off Days/Holidays (As Applicable To Refinery Site) - For Group B: Tag No.: {8}03-At-O2-Zir, For Mr Item 1.0002 , Training Charges At Vendor Works For Following As Per Special Instructions To Vendor (Cl. B21) Enclosed With Mr. , For Group A: Tag No.: {10}003-Stk-0001, For Mr Item 1.0001 , For Group B: Tag No.: {10}03-At-O2-Zir, For Mr Item 1.0002 , Training Charges At Site For Owners Personnel For Following As Per Special Instructions To Vendor (Cl. B21) Enclosed With Mr , For Group A: Tag No.: {11}003-Stk-0001, For Mr Item 1.0001 (For Evaluation Purpose Total 6 Mandays Shall Be Consindered) , For Group B: Tag No.: {11}03-At-O2-Zir, For Mr Item 1.0002 (For Evaluation Purpose Total 6 Mandays Shall Be Consindered) , Post Commissioning Maintenance Support Till One Year From The Successful Commissioning / Sat (Cl. B27 Of Mr) , For Group A: Tag No.: {12}003-Stk-0001, For Mr Item 1.0001 , For Group B: Tag No.: {12}03-At-O2-Zir, For Mr Item 1.0002 , Unit Rates Of Following Items For Addition/Deletion Purposes , Mr Item Sl. No. 6.0001: Tag No.: 003-Stk-0001: Sample Tubing/Lines For Stack Analyzer , Mr Item Sl. No. 6.0002: Tag No.: 003-Com-Cable: Serial Communication Cables For Stack Analyzer , Mr Item Sl. No. 6.0003: Tag No.: 003-Fo-Cable: Fiber Optic Cable For Stack Analyzer , Mr Item Sl. No. 6.0004: Tag No.: 003-Ettube-A01: Prefabricated Electrically Traced Tube For Stack Analyzers , Mr Item Sl. No. 6.0005: Tag No.: 003-Tube-Fittings: Tube Fittings (All Sizes) For Stack Analyzer System , Mr Item Sl. No. 6.0006: Tag No.:003-Tube-B01:Tubing For O2-Zirconia Analyzer , Mr Item Sl. No. 6.0007: Tag No.:003-Intcable-B01: Interconnecting Cable Between Probe Assembly And Analyzer Electronics For O2 Analyzer , Mr Item Sl. No. 6.0008: Tag No.:003-Comcable-B01: Serial Communication Cable For O2 Analyzer => Limited