| 1 | Supply Part of 1-Phase |
| 2 | Supply of 8.00 Mtr. LongISI marked swaged steel tubular pole as per IS: 2713/1980(Part-\"A\") as amended from time to time, along with Cap Welded on top & Cast iron Base plate of designation410SP-47 |
| 3 | Supply of RCC pipe (Muff) ISI marked suitable for different sizes of steel poles. 2000 mm in length and 25 mm thick with 250 mm internal dia duly fabricated by using un-galvanized MS wires of 12 SWG rings and 6 mm MS round in vertical direction conforming to ISI 458-1988 or latest version if any. |
| 4 | Supply of ACSR conductor of size6/1/3.35 mm (50mm2) conforming to IS-398 (Part-II)/1996 with upto date amendments |
| 5 | Supply of shackle insulator. |
| 6 | Supply of D-Iron (U-Clamps) |
| 7 | Supply of LT stay set |
| 8 | Supply of Stay Wire (7/3.15 mm) (6.0 Kg per stay set) |
| 9 | Supply ofEgg. Insulator |
| 10 | Supply of Full Clamps (4 No. for A.I. + 1 No. for Stay Set) |
| 11 | Supply of Earth Knob |
| 12 | Supply of earthing set complete. |
| 13 | Supply of Earth wire (GI, 8 SWG) (Addl. 3 % (Sag & Wastage) ) @ 1.102 Kg/m |
| 14 | Supply of Nuts & Bolts @25 KG Per Km. |
| 15 | Supply of Aluminium paint. |
| 16 | Erection Part:- LT |
| 17 | Erection of steel tubular pole 9.00 mtr long(Single pole) digging of pit, Erection of pole, Drilling of holes in X-arm, , Fixing of insulator X-arm knee-bracing set top clamp, Fixing of barbed wire danger plate,Concreting of RCC Muff with c:c 1:3:6 (1 cement :3 sand :6 aggregate 20 mm nomial sizewith curing complete etc.),Filling of pit+ramming, painting of pole and all steel items (Punching of the poles is stricitly not allowed) |
| 18 | Laying, stringing , sagging& binding with Insulator of ACSR rabbit conductor of size6/1/3.35 mm (50mm2) & GI wire including jumpering etc. complete. |
| 19 | Erection of Stay Set LT (Digging of pit, fixing of stay rod, filling of pit , nozzeling & tighting) |
| 20 | Erection of Earthing set (Digging of pit, fixing of GI wire to the earth system & filling of pit) |
| 21 | Transportation by truckofLT Line its associate material including Loading Unloading. |
| 22 | MANUAL CARRIAGE OF MATERIAL FORLT LINE CONSIDERING AVERAGE DISTANCE FROM ROAD HEAD TO SITE OF WORK AVERAGE LEAD= 0.500 KM |
| 23 | LT Steel Poles 9 mtr. Longand RCC Muff |
| 24 | Manual carriage of LT Line its associate material (accept ST poles) like wise cross arm, bracing set, insulators, stay set, stay wire, Conductor & GI wire. |