Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Of Equipment/Material, Design, Erection, Testing And Commissioning For Sop To Pwd By Shifting Of 11Kv Ht Line Passing Over The Newly Constructed Bridge Over The Bhul Khad In Village Jhaloon At Rd 5/370 In Electrical Section Bharmar Under. Submission Date for this Tender is 12-02-2024. Conductor Tenders in jawali Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | 11 KV HT Line |
2 | Prov. ACSR (6/1/3.35, 50 mm²) { Neutral conductor including 1% (Sag, Jumpering and wastage} |
3 | Prov. Steel Tubular Poles (11 m, Working Load > 200 kgf/m²) |
4 | Prov. Muffs with concerete filling |
5 | Cross Arm: [Channel Iron (100x50x6 mm), Length: 1270 mm i/c tolerance of 100 mm either side) |
6 | Angle Iron (50x50x6 mm), Length: 750 mm x 2 No. x 8 structures |
7 | Pole Top Bracket [MSCI:100x50x6 mm- 100 mm] |
8 | Prov. Pin Insulator with GI Pin |
9 | Prov.Stay set complete HT i/c Egg |
10 | Prov. Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set) (Prov. By HPSEBL) |
11 | Prov. Half clamps: [On Double Pole Dead End structure: 4 No; On Run Thro" structure: 2 No ] |
12 | Prov. Full clamps: [On Double Pole Dead End structure: 4 No, Single Pole Run Thro" structure: 2 No] |
13 | Prov. Danger Plate (250X200X1.6 mm) (Prov. By HPSEBL) |
14 | Prov. Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
15 | Prov. Barbed Wire |
16 | Prov. Aluminium Paint |
17 | Erection of 11 Mtr. ST pole Single structure i.e. digging of pit, fixing of insulator, x-arms,K.B. set, Top clamp, barbed wire, danger plate, drilling of holes and filling of pit + rammingcomplete in all respect. |
18 | Erection of Stay set HT i.e. digging of pit, fixing of stay road, filling of pit, nozzeling & tightning. |
19 | Sagging of conductor i.e. laying, stringing and sagging & binding with insulator (Single wire per KM). |
20 | Sagging of GI Wire i.e. laying, stringing and sagging & binding(Single wire per KM). |
21 | Dismantling of Conductor(Single wire per KM). |
22 | Transportation and Mannual carriage of material 1 KM HT line considering average distance from road to site of work (0.100 Km) |
23 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |