}

Tender For Various Cleaning Sweeping Works Inside Colony Area And Inside Power House Area At Harduaganj Thermal Power Plant, Kasimpur, Aligarh, Uttar Pradesh, Aligarh-Uttar Pradesh

Uttar Pradesh Rajya Vidyut Utpadan Nigam Limited-UPRVUNL has published Tender For Various Cleaning Sweeping Works Inside Colony Area And Inside Power House Area At Harduaganj Thermal Power Plant, Kasimpur, Aligarh, Uttar Pradesh. Submission Date for this Tender is 12-03-2024. Thermal Power Plant Tenders in Aligarh Uttar Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41970390
Corrigendum : Tender For Various Cleaning Sweeping Works Inside Colony Area And Inside Power House Area At Harduaganj Thermal Power Plant, Kasimpur, Aligarh, Uttar Pradesh
Open Tender
Indian
Uttar Pradesh
Aligarh
12-03-2024

Tender Details

Tender For Various Cleaning Sweeping Works Inside Colony Area And Inside Power House Area At Harduaganj Thermal Power Plant, Kasimpur, Aligarh, Uttar Pradesh

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 27-Feb-2024 DATE EXTENSION Date 05-03-2024
2 05-Mar-2024 DATE EXTENSION 2 Date 12-03-2024

Key Value

Document Fees
INR 11800 /-
EMD
INR 400000.0 /-
Tender Value
INR 1.98 Crore /-

BOQ Items

Name of Work: Various Cleaning Sweeping works inside colony area and inside power house area at Harduaganj Thermal Power Plant, Kasimpur, Aligarh, Uttar Pradeshat
Sl. No. Item Description
1Clearing jungle including uprooting of rank vegetation, grass, brush wood,trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50 m outside the periphery of the area cleared.
2Clearing grass and removal of the rubbish upto a distance of 50 m outside the periphery of the area cleared.
3Disposal of Lime, moorum, building rubbish.upto 3.00 KM. 20 % voids shall be deducted.
4Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and lift upto 1.5 m, as directed by Engineer-in-charge.All kinds of soil
5Felling trees of girth measured at a height of 1 M. above ground level including cutting of trunks and branches and stacking serviceable material and disposal of unserviceable material beyond 30 Cm. girth .
6Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceabl material.Beyond 60 cm girth upto and including 120 cm girth
7Felling trees of the girth (measured at a height of 1 m above ground level), including cutting of trunks and branches, removing the roots and stacking of serviceable material and disposal of unserviceabl material.Beyond 120 cm girth upto and including 240 cm girth
8Disposal of malva,surplus earth & waste of const,material collected from all collection point upto 2.00 Km 20% voids shall be deducted
9Front end loader 1 cum bucket capacity (incl POL)
10mobile crane (Engaging of hydra)
11Cleaning of house drains including removel of sludge upto bottom of drains & disposal of the waste/sludge within 50 Mt.from cleaning area for proper completion of work for section 150x150mm (frequency 156)
12Cleaning of house drains including removel of sludge upto bottom of drains & disposal of the waste/sludge within 50 Mt.from cleaning area for proper completion of work for section 100x200mm (frequency 156)
13Cleaning of sludge,ash dirt or any other deposited material from main drain as per direction of E/I including cleaning of culverts on drains both side parties of drain 1.0 Mt. wide on each side cleaning shall be done by making bundah on both sides i.e. upstream as well as down stream and taking out complete sludge and its dispOsal upto a distance Of 1 Km. beYond the bounDry/premessis of power house/colony disposal of sludge to be done within 07 days of the cleaning All arrangements to avoid flooding & dewatering may be done as required for proper completion of the work. Section wise quantities are given below: 0.04 to 0.25 Sq.M section ( 12x 1654.40)
14Cleaning of sludge,ash dirt or any other deposited material from main drain as per direction of E/I including cleaning of culverts on drains both side parties of drain 1.0 Mt. wide on each side cleaning shall be done by making bundah on both sides i.e. upstream as well as down stream and taking out complete sludge and its dispOsal upto a distance Of 1 Km. beYond the bounDry/premessis of power house/colony disposal of sludge to be done within 07 days of the cleaning All arrangements to avoid flooding & dewatering may be done as required for proper completion of the work. Section wise quantities are given below: 0.25 to 0.5 Sq.M. section ( 12 x 2259.50)
15Cleaning of sludge,ash dirt or any other deposited material from main drain as per direction of E/I including cleaning of culverts on drains both side parties of drain 1.0 Mt. wide on each side cleaning shall be done by making bundah on both sides i.e. upstream as well as down stream and taking out complete sludge and its dispOsal upto a distance Of 1 Km. beYond the bounDry/premessis of power house/colony disposal of sludge to be done within 07 days of the cleaning All arrangements to avoid flooding & dewatering may be done as required for proper completion of the work. Section wise quantities are given below: 0.65 to 0.95 Sq.M.section ( 12 x 1060.70)
16Cleaning of sludge,ash dirt or any other deposited material from main drain as per direction of E/I including cleaning of culverts on drains both side parties of drain 1.0 Mt. wide on each side cleaning shall be done by making bundah on both sides i.e. upstream as well as down stream and taking out complete sludge and its dispOsal upto a distance Of 1 Km. beYond the bounDry/premessis of power house/colony disposal of sludge to be done within 07 days of the cleaning All arrangements to avoid flooding & dewatering may be done as required for proper completion of the work. Section wise quantities are given below: 1.00 to 1.5 Sq.M. section ( 06 x 1060.00)
17Cleaning of sludge,ash dirt or any other deposited material from main drain as per direction of E/I including cleaning of culverts on drains both side parties of drain 1.0 Mt. wide on each side cleaning shall be done by making bundah on both sides i.e. upstream as well as down stream and taking out complete sludge and its dispOsal upto a distance Of 1 Km. beYond the bounDry/premessis of power house/colony disposal of sludge to be done within 07 days of the cleaning All arrangements to avoid flooding & dewatering may be done as required for proper completion of the work. Section wise quantities are given below: 1.52 to 2.25 Sq.M. section(6 x 958.90)
18Cleaning of sludge,ash dirt or any other deposited material from main drain as per direction of E/I including cleaning of culverts on drains both side parties of drain 1.0 Mt. wide on each side cleaning shall be done by making bundah on both sides i.e. upstream as well as down stream and taking out complete sludge and its dispOsal upto a distance Of 1 Km. beYond the bounDry/premessis of power house/colony disposal of sludge to be done within 07 days of the cleaning All arrangements to avoid flooding & dewatering may be done as required for proper completion of the work. Section wise quantities are given below: 2.50 to 3.0 Sq.M. section ( 6 x 1118.70)
19Surface dressing of side patteries including removal of all vegitation etc. complete and also including leveling,dressing of uneven surface upto 150mm depth.
20Cleaning of pokhars(from Jeevan Nursing Home to back of Nawab Singh College) to make free from jalkumbhi & other un-wanted vegitation, floating material etc. and then burning the same after drying including all labour material T&P required for proper completion of the work.
21Cleaning of kachcha drain by echanical/manual device,banking excavated sludge on the sides of the drain lead upto 50mt. & lift upto 1.5Mt.
22Carriage of sludge by mechanical transport/tractor trolley including loading unloading etc. complete upto a distance of 2K.M.
23Cleaning of "U" shape culvert under railway line near truck gate including making bundh with gunny bage filled with earth on upstream, as well as dgwn stream of culvert. All safety arrangement for the labour will have to be taken by the contractor at his own cost and risk to clean the underground culvert including all labour, T&P special T&P such as gum boots etc. required for proper completion of the work, including disposal of sludge beyond the colony/power house premises within 07 days.
24Removing polythen bags/boulders/ other abstacted culverts/jaals of various main drains of new colony & main drains going upto ganga canal by engaging sufficient labour, T&P, etc. required for proper completion of work. Removed garbage shall be dumped outside the premises of colony.
25Providing diesel trolley 10 H.P. on hire basis with pump,float valve, hose pipe etc. complete with one operator & one helper along with cost of diesel, whole oil, T&P etc. required for proper completion of work,(for one pump set of 08 hrs.running period of pump shall be treated as one day for payment purpose) (for this work minimum 02 Nos. pump set will be installed at 02 different location)
26Sweeping of road and side patteries including removal of vegetation, sweeping of pointed bitumen surface brick on edge of road upto side drain for double lane road (frequency 156)
27Sweeping of road and side patteries including removal of vegetation, sweeping of pointed bitumen surface brick on edge of road upto side drain for single lane road (frequency 156)
28Sweeping of road and side patteries including removal of vegetation, sweeping of pointed bitumen surface brick on edge of road upto side drain for back side road (frequency 156)
29Supply and laying white lime powder in straight line with help of along with the road sides.
30Cleaning of septic tank and including of waste out side the colony area as per direction of E/I including cost of all labour T&P etc required for proper completion of the work
31Disposal of dead body big animal like cow, buffalo etc.
32Disposal of small animal like cat,dog etc.
33Round the clock cleaning of project hospital including sweeping, washing of toilet, floors and drains of all the rooms, galleries & wards including all material & T&P(phynyle,vim duster,napthalene balls/odonil including sufficient man power(notless than 4 Nos.) to ensure proper cleanlesness as per complete satisfaction of Dy.CMO/E.I including cleaning of jungle/grass of entire campus & including cleaning of drains & disposal of garbage to nearest dustbin.
34Sweeping cleaning & mopping all floors with broom/Cloth and also including wet wash with phenyle or approved germicide daily at all floors, staircase,staircase railing & window, roof, common area of multistory tower. Work shall include engaging minimum 01 labour per day for two tower details as per given below . work shall include cleaning of outerarea of tower and collection of Malwa of all Qtr. in block ( Type 2A & 2B, Type 3A & 3B, Type 4A & 4B, Type 3C & 4C and Type 5+ Officer club) (Note: Total 5 labour for all tower & club area per day)
35Cleaning sweeping of roofs of residential/non residential buildings as per instruction of E/I.
36Sanitization of new colony by spraying solution through hand spraying machine. (Chemical will be provided by department).
37Sanitization of various offices ofproject by spraying solution through hand spraying machine. (Chemical will be provided by department).
38Fogging spraying of melathion 50% concentration in new colony and power house area with fogger machine. Melethion wll be mixed diesel in ratio of 1:15. Melathion, petrol for running of fogging machine and fogging machine shall be arranged by the contractor. However diesel used for fogging shall be given by the department free of cost. Nornally in one operation 90 Litre diesel will be consumed and approximate running time of machine will be 05 hrs. (5.30 PM to 10.30PM)
39Supply of dustbin for disposal of Bio medical waste on daily basis from Project Hospital Harduaganj Thermal Power Stations
40Charges of waste disposal: Collection, Reception, storage, Transport, Treatment and disposal of Bio medical waste on daily basis from Project Hospital Harduaganj Thermal Power Stations
41Sweeping cleaning & mopping all floors with broom.Cloth and also including wet wash with phenyle or approved germicide daily at all floors of service house building including toilet of service building& main control room at 0m & 13.5 mtr of unit no.8 & 9 as per scope of work.
42Supply of Odonil
43Supply of Phenyle
44Supply of Soap 555 equivalent as approved
45Supply of Washing powder Vim or equivalent as approved
46Supply of Nepthaline balls
47Supply of Colin
48Supply of Harpic
49Cleaning & Sweeping of roof at service building, STP, CW Pump House, DM Plant, fire fighting building, Ash Handling Plant etc.in B & C Power House, Administrative Building, Payment Building, ETD shed. Area including removing of ash, dirt, garbage,uprooting of pipal and bargad plants,cleaning of rain water pipe etc including removing of ash, dirt, garbage,uprooting of pipal and bargad plants,cleaning of rain water pipe etc. including all T&P required for proper completion of work. One job is any one roof.
50Cleaning & sweeping of all the rooms of office of payment division ground floor & first floor, Administrative Building Ground floor & first floor, all the offices situated in ETD shed (ETD, ECMC & all other offices)including cleaning of floors, drains, dusting, cleaning of stairs cases, balustrades, wall, including washing of floors Including cleaning of toilets, W/C sheet, bathrooms/fittings etc. with Phenyl/washing powder/Acid as required to maintain hygienic condition in the offices including all labour material T&P etc. required for proper completion of work.
51Cleaning of toilet ofold service building at different level (0M,04M,13M,W/C, etc), MCR and control room U#7
52Providing tractor with fuel with trolley with driver & 2no Labour for loading & unloading including carriage of garbage, grass building rubbish etc. For dumping at dumping yard outside/inside the Plant area.
53Suplying and Sprinkling of herbicide glyphosale (41%) along with herbicide urea as supplement in herbs ,Grass ,Jungle area in 2x250 MW Exten. Including all material, labour, T&P etc. for proper completion of work
54Supply and lying of Urea
55Supply and lying of DAP
56Supply and lying of Rose Mixture
57Supply and lying of  Neem Khali
58Supply and lying of  Bone Dust
59Supply and lying of  Rogar
60Supplying MosaicGamla. 18”
61Supplying Croton plants
62Supplying Erocaria plants
63Supplying Palm Tree plants
64Supplying   Rubber Plants
65Supplying of Guldawdi/Double Dahelia in eathen Gamala 6”
66supplying/sowing seasonal flower plants sapliung nd flower beds
67Supply and stacking of well decayed cow dung manure at site including carriage up to 01 K.m. (cow dung manure measured in stack will reduced by 8% for voids. )
68Spreading of dump manure.
69Cleaning grass and removal of the rubbish upto dustbin outside the periphery of thr area cleared
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail