}

Tender For Design, Development, Supply, Commissioning And Training Of Large Cavitation Tunnel (Lct) Facility, visakhapatnam-Andhra Pradesh

Department Of Defence Research And Development has published Tender For Design, Development, Supply, Commissioning And Training Of Large Cavitation Tunnel (Lct) Facility. Submission Date for this Tender is 22-05-2024. Road Work Tenders in visakhapatnam Andhra Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41967632
Corrigendum : Tender For Design, Development, Supply, Commissioning And Training Of Large Cavitation Tunnel (Lct) Facility
Open Tender
Indian
Andhra Pradesh
visakhapatnam
22-05-2024

Tender Documents

Additional Details Available on Click
✓ Tendering Authority
✓ Publication Document
(Tender Document / Tender Notice )

Tender Details

Design, Development, Supply, Commissioning And Training Of Large Cavitation Tunnel (Lct) Facility , Hydrodynamic Design Of Tunnel Including Acoustic Consideration To Meet Specifications , Hydrodynamic Design Of The Pump (Stator, Rotor And Its Associated Items) , Design Of Tunnel Steel Structure , Design Of Data Acquistion And Analysis System (Daas) & Acoustic Measurement System (Ams) , Design Of Automatic Control System (Acs) Of Lct , Design Of Condition Monitoring And Prognosis Systems , Design Of Complete Civil Structures, Rcc Building And Facility Infrastructure, Ergonomic Workspace Etc., Including Acoustic Considerationfor Setting Up Of Lct Facility , Verification And Validation Of Hydrodynamic Designs (Model Scale1:5) , Detailed Design: Detailed Technical Documentation, Drawings, Workshop Drawings, Bill Of Materials. , Quality Control And Quality Assurance Guidelines. , Detailed And Production Design Of Tunnel Steel Structure Of Lct And Verification Through Classification Society. , Raw Material, Fabrication, Errection,Testing,& Qa-Qc For Tunnel Steel Strcture, Storage Tank And Stiffeners (Ss Grade: Aisi 321)As Per Design , Raw Material, Fabrication, Errection,Testing,& Qa-Qc For Supprot Structures As Per Design , Shaft, Shaft Seal, Sealants And Its Associated Items And Its Associated Items , Impeller (Stator, Rotor) And Its Associated Items , Thrust Bearing And Its Associated Items , Bearings And Its Assocaited Items , Gear Box / Coupling And Its Associated Items , Forced Lubricating System And Its Associated Items , Misc Water Pumps And Its Associated Items , Water Filtration & Treatment Plant With Multi Step Filters And Its Associated Items , Special Tools, Tackles & Gadgets For Day Operations Of Lct , Other Misc Ppe, Accessories & Auxiliaries, Sound Mufflers Etc., , Degassing System And Its Associated Items , Automatic Controlled Valves And Its Associated Pipelines , Compressor Pumps, Compressed Air Storage Tanks And Its Associated Systems , Vacuum Pumps, Vaccum Storage Tanks And Its Associated Systems , Jigs, Fixtures, Calibration Masters, Tools And Tackles, Gauges ,Maintenance Kits Etc., , Battery Operated Trolley Of 3T Load Carry Capacity , Fork Lift03 Ton Capacity , Hydraulic Hand Pallet Truck (1.5 T) , Fully Electric Stacker(1.5T) , Main Propulsion Motor (Approx 7.5 Mw) With Vfd And Its Associated Systems , Major Switch Yard Equipment And Its Associated Systems (Transformers, Circuit Breakers, Lightning Arrestors, Isolaters, Control And Relay Panels, Power Cables And Control Cables, Switch Gear Panels, Earthing System Etc., ) , Central Fire Alarm & Detecting System Covering The Main Propulsion Motor Room. , Propulsion Dynamometer For Self-Propulsion Tests Along With Electric Drive (Rpm : 3000; Thrust:3000 N; Torque: 150 Nm) , Propeller Open Water Dynamometer Along With Electric Drive (Rpm : 3000; Thrust:3000 N; Torque:150 Nm) , Contra-Rotating Dynamometer Along With Electric Drive(Rpm:3000;Thrust : 1500 N;Torque:75 Nm For Each Shaft) , Single Component Dynamometer (Force:+/- 3000 N) , One Component Duct Dynamometer (Force:+/- 3000 N) , Towed Two Component Dynamometer Of Underwater Models (X- Force : +/- 3000 N Y- Force: +/- 3000 N) , Towed One Component Dynamometer For Surface Models With Suspension System And Replaceable Measuring Elements 2 In Nos. For Thegiven Range Each I. X –Force: +/- 3000 N; Ii. X- Force: +/- 1000 N;Iii. X –Force: +/- 300 N , Six Component Dynamometer X-Force:+/- 2500 N; Y-Force:+/- 8000 N;Z-Force :+/- 8000 N,Mx-Moment: +/- 1500 Nm; My-Moment:+/- 3500 Nmmz-Moment:+/- 3500 Nm , Propeller Unsteady Force Dynamometerrpm: 800;?T-Force:+/-10N , Hydro-Acoustic Measurement Units Like Hydrophones With Amplifier And Calibrators As Follows : Hydrophones , Pressure Fluctuation Sensors/Transducers , Accelerometers , Wake Rakesystem , High Speed Camera System (1024 X 1024 Pixels At 4000 Fps) , Stroboscopes , Hydraulic Drive /Electric Drive In Pod Unit With A Capacity Of Up To 10 Kw On A Shaft With A Rotation Speed Up To 2400 Rpm, Noise Level Should Be Less Than 80Db At 2400 Rpm. , Calibration Rigs (Including Dead Weights)For All The Instrumentation , Realisation Of Calibration Models And Its Associated Itemsa. Reference Ship Model(S) B. Reference Submarine Model(S)C. Reference Propeller Model(S) , Data Acquisition And Analysis System (Daas) With Provision For Extrapolation To Full Scale And Its Associated Systems. , Tunnel Automation Control System (Tacs) And Its Associated Systems. , Conditioning Monitoring / Prognosis /Diagnosis Software(S) And Its Associated Systems. , Standard Software Modules For High Speed Image Analysis And Results Reporting. , Acoustic Measurement And Analysis Andprediction System , Digital Simulator Of Lct Operations For Training To Future Incumbent Human Resources/Train The Workforce, Digital Walkthrough Of Lct Systems And Facility. , Hpc Cluster Servers With Ha , Rack Mountable Nas With 100Tb , Access Switch Type 2 (48-Port) , Work Stations For Cad Centre , Personal Computers , Printers Cum Document Scanners A3 Size , Multi-Function Documentation Machines A3 Size , Plotter A0 Size Colour Printing , Online Ups Of Rating 20 Kva With Battery Of Backup Time 60 Minutes , Access Control Systems , Cc Tv Cameras , Interactive Panel , 4K Resolution/Higher Configuration Projector , Conference Hardware, Speakers Cum Mickes & Cameras (Wire Free), Panels, Controls Etc. With Suitable Video Conferencing System, For 50 Delegate Capacity Conference Room , Site Survey, Geo Technical Investigations, Levelling And Construction Of Motarable Approach Road,Civil, Structural & Architectural Design And Structural Analysis Reports. , Construction Of Main Plant Building To Meet The Acoustic Quality Requirements Of Facility (Refer To Civil Drawings In Annexure Iii ) Including Finishing, Plumbing, Sanitation And Internal Electrical, Lighting And Works Etc., Meeting The Approved Civil And Architectural Plan Of Interior And Exterior Details. , Air Conditioning Plant/Hvac System For Various Offices Of Facility , Electrical Sub-Station And Associated Systems To Cater Electrical Energy Of Impeller Pump As Well As Electrical Supply For Entire Facility Operations. , Solar Power System(400 Kwh Energy Capacity) Transformer, And Associated Equipment , Dg Power Supply Systems (Dg Set-1.5 Megawatt Capacity) And Associated Equipment With Canopy. , Furniture, Office Storage Solution And Inbuilt Cupboards/Almarah, Operation Crew Announcement And Digital Displays Systems , Landscape Lighting, Routing Displays, Facility Display Systems,Arboriculture And Outdoor Aesthetic , Office Amenities, Light Roof For Parking Space, Hard Stand , Pavement Road Illumination Provisions,Ventilation Ducts, Glass Panels For Viewing Gallery, Walk Ways, Rails , Guards,“Divyangan”Facilitation Provisions ,Name Boards, Sign Plates Etc., , Electric Overhead Cranes -15 T Capacity & Its Associated Items , Material/Service Lifts (4 Ton Capacity) & Its Associated Items , Passenger Lifts (High Speed, 8 Persons Capacity) & Its Associated Items , Factory Acceptance Trials Of Major Equipmets And Subsystems , Training Of Nstl Specialist At Designers Large Cavitation Tunnel Facility. , Validation Trails At Designer Large Cavitation Tunnel Facility. , Training Of Nstl Specialist At Nstl Large Cavitation Tunnel Facility , Acceptance And Validation Trials At Nstl Large Cavitation Tunnel As Per Acceptance Criteria , Training Documentation , Warranty Chargesfor Mandatory Warranty Period Of 2 Years Post Commissioning. , Deployment Of Service Cum Maintenance / Support Engineers And Skilled Workforce Equipped With Required Esp. , Comprehensive Design Documents, Test Reports, Maintainance Procedures, Test Procedures And Literatures As Specified In Technical Specifications (Including One Set Of Soft Copy). , Accreditation And Certification Of Lct To Classification Societies / Global Professional Societies Physical Facilty Display Model, Digital Walkthrough Of Lctfor Presentation And Other Facility Anouncement Systems , List Of Recommended Critical Spare Parts For Thelct Equipment And Instrumentation Required Post Two Year Warranty Period And Amc Charges Post Warranty (I) Seven Years For Mechanical Components With Price Indication.(Ii) Five Years For Electronic & Electrical Components With Price Indication.(Iii) Comprehensive Annual Maintainance Charges For A Period Of 3 Years Post Warranty Period. Note: This Price Will Not Be Considered For Finilising The L1

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 05-Mar-2024 Corrigendum of Due Date Extension Date 02-04-2024
2 28-Mar-2024 Corrigendum for extension of bid submission date and bid opening date Date 16-04-2024
3 15-Apr-2024 Extension of Bid submission date and Bid opening date Date 07-05-2024
4 06-May-2024 Extension of bid submission date and opening date Date 22-05-2024

Key Value

Document Fees
Refer document
EMD
INR 130000000.0 /-
Tender Value
Refer document

Attachment

FileName File Description File Size
63218f00-e2a8-4e3d-a343-622dc86e5550.html Tender Notice 0 KB
ADDITIONALDOCUMENTS_ANNEX_1.pdf Tender Document 0 KB
BOQ_716673.xls Tender Document 0 KB
RFP.pdf Tender Document 0 KB
Tendernotice_1.pdf Tender Document 0 KB

BOQ Items

DESCRIPTION :Design, Development, Supply, Commissioning and Trainging of LCT Facility etc.,
Sl. No. Item Description
1Hydrodynamic design of tunnel including acoustic consideration to meet specifications
2Hydrodynamic design of the pump (Stator, rotor and its associated items)
3Design of tunnel steel structure
4Design of Data Acquistion and analysis system (DAAS) & Acoustic Measurement System (AMS)
5Design of Automatic control system (ACS) of LCT
6Design of Condition monitoring and prognosis systems
7Design of Complete civil structures, RCC building and facility infrastructure, ergonomic workspace etc., including acoustic considerationfor setting up of LCT facility
8Verification and Validation of hydrodynamic designs (model scale1:5)
9Detailed design: Detailed technical documentation, drawings, workshop drawings, bill of materials.
10Quality control and quality assurance guidelines.
11Detailed and production design of tunnel steel structure of LCT and verification through classification society.
12Raw material, fabrication, errection,testing,& QA-QC for tunnel steel strcture, storage tank and stiffeners (SS grade: AISI 321)as per design
13Raw material, fabrication, errection,testing,& QA-QC for supprot structures as per design
14Shaft, Shaft seal, sealants and its associated items and its associated items
15Impeller (Stator, rotor) and its associated items
16Thrust bearing and its associated items
17Bearings and its assocaited items
18Gear box / coupling and its associated items
19Forced lubricating system and its associated items
20Misc water pumps and its associated items
21Water filtration & treatment plant with multi step filters and its associated items
22Special tools, tackles & gadgets for day operations of LCT
23Other misc PPE, accessories & auxiliaries, Sound mufflers etc.,
24Degassing system and its associated items
25Automatic controlled Valves and its associated pipelines
26Compressor pumps, compressed air storage tanks and its associated systems
27Vacuum pumps, vaccum storage tanks and its associated systems
28Jigs, fixtures, calibration masters, tools and tackles, gauges ,maintenance kits etc.,
29Battery operated Trolley of 3T load carry capacity
30Fork lift03 Ton capacity
31Hydraulic hand pallet truck (1.5 T)
32Fully electric stacker(1.5T)
33Main propulsion motor (Approx 7.5 MW) with VFD and its associated systems
34Major switch yard equipment and its associated systems (Transformers, circuit breakers, lightning arrestors, isolaters, control and relay panels, power cables and control cables, switch gear panels, earthing system etc., )
35Central fire alarm & detecting system covering the main propulsion motor room.
36Propulsion dynamometer for self-propulsion tests along with electric drive (Rpm : 3000; Thrust:3000 N; Torque: 150 Nm)
37Propeller open water dynamometer along with electric drive (Rpm : 3000; Thrust:3000 N; Torque:150 Nm)
38Contra-rotating Dynamometer along with electric drive(Rpm:3000;Thrust : 1500 N;Torque:75 Nm for each shaft)
39Single component Dynamometer (Force:+/- 3000 N)
40One Component duct Dynamometer (Force:+/- 3000 N)
41Towed two component Dynamometer of underwater models (X- Force : +/- 3000 N Y- Force: +/- 3000 N)
42Towed one component Dynamometer for surface models with suspension system and replaceable measuring elements 2 in Nos. for thegiven range each  i. X –Force: +/- 3000 N; ii. X- Force: +/- 1000 N;iii. X –Force: +/- 300 N
43Six component dynamometer X-Force:+/- 2500 N; Y-Force:+/- 8000 N;Z-Force :+/- 8000 N,Mx-Moment: +/- 1500 Nm; My-Moment:+/- 3500 NmMz-Moment:+/- 3500 Nm
44Propeller Unsteady force DynamometerRPM: 800;?T-Force:+/-10N
45Hydro-acoustic measurement units like Hydrophones with amplifier and calibrators as follows : Hydrophones
46Pressure fluctuation sensors/transducers
47Accelerometers
48Wake rakesystem
49High speed camera system (1024 x 1024 pixels at 4000 fps)
50Stroboscopes
51Hydraulic drive /Electric drive in pod unit with a capacity of up to 10 kW on a shaft with a rotation speed up to 2400 rpm, Noise level should be less than 80dB at 2400 Rpm.
52Calibration rigs (Including dead weights)for all the instrumentation
53Realisation of Calibration models and its associated itemsa. Reference ship model(s) b. Reference submarine model(s)c. Reference propeller model(s)
54Data acquisition and analysis system (DAAS) with provision for extrapolation to full scale and its associated systems.
55Tunnel Automation Control System (TACS) and its associated systems.
56Conditioning monitoring / prognosis /diagnosis software(s) and its associated systems.
57Standard software modules for high speed image analysis and results reporting.
58Acoustic Measurement and analysis andprediction System
59Digital simulator of LCT operations for training to future incumbent human resources/train the workforce, Digital walkthrough of LCT systems and facility.
60HPC Cluster Servers with HA
61Rack Mountable NAS with 100TB
62Access Switch type 2 (48-Port)
63Work stations for CAD centre
64Personal computers
65Printers cum document scanners A3 size
66Multi-function documentation machines A3 size
67Plotter A0 size colour printing
68Online UPS of Rating 20 KVA with Battery of backup time 60 minutes
69Access control systems
70CC TV Cameras
71Interactive panel
724K Resolution/Higher configuration Projector
73Conference hardware, speakers cum mickes & cameras (wire free), panels, controls etc. with suitable video conferencing system, for 50 delegate capacity conference room
74Site survey, Geo technical investigations, Levelling and construction of motarable approach road,Civil, structural & architectural Design and structural analysis reports.
75Construction of main plant building to meet the acoustic quality requirements of facility (refer to civil drawings in Annexure III ) including finishing, plumbing, sanitation and internal electrical, lighting and works etc., meeting the approved civil and architectural plan of interior and exterior details.
76Air conditioning plant/HVAC system for various offices of facility
77Electrical sub-station and associated systems to cater electrical energy of impeller pump as well as electrical supply for entire facility operations.
78Solar power system(400 KWH energy capacity) Transformer, and associated equipment
79DG power supply systems (DG set-1.5 Megawatt capacity) and associated equipment with canopy.
80Furniture, office storage solution and inbuilt cupboards/Almarah, Operation crew announcement and digital displays systems
81Landscape lighting, routing displays, facility display systems,Arboriculture and outdoor aesthetic , Office amenities, Light roof for parking space, hard stand , pavement road illumination provisions,Ventilation ducts, glass panels for viewing gallery, walk ways, rails , guards,“Divyangan”Facilitation provisions ,name boards, sign plates etc.,
82Electric Overhead cranes -15 T capacity & its associated items
83Material/service lifts (4 Ton capacity) & its associated items
84Passenger lifts (high speed, 8 persons capacity) & its associated items
85Factory acceptance trials of major equipmets and subsystems
86Training of NSTL specialist at Designer"s Large cavitation tunnel facility.
87Validation trails at Designer Large cavitation tunnel facility.
88Training of NSTL specialist at NSTL Large cavitation tunnel facility
89Acceptance and validation trials at NSTL Large cavitation tunnel as per Acceptance criteria
90Training documentation
91Warranty chargesfor mandatory warranty period of 2 years post commissioning.
92Deployment of service cum maintenance / support engineers and skilled workforce equipped with required ESP.
93Comprehensive design documents, test reports, maintainance procedures, test procedures and literatures as specified in technical specifications (Including one set of soft copy).
94Accreditation and certification of LCT to classification societies / Global professional societies Physical facilty display model, Digital walkthrough of LCTfor presentation and other facility anouncement systems
95List of recommended critical spare parts for theLCT equipment and Instrumentation required post two year warranty period and AMC charges post warranty (i) Seven years for mechanical components with price indication.(ii) Five years for electronic & electrical components with price indication.(iii) Comprehensive Annual Maintainance charges for a period of 3 years post warranty period. Note: This price will not be considered for finilising the L1
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail