Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Of Equipment/Material, Design, Erctiontesting & Commissioning For Providing Sop To Public Electrical Vehicle Charging Station Proposed At Mhshd Nayyar Fillingstation At Sultanpur Chowk By Providing 11/0.4 Kv 100 Kva Sub-Station In (E) Se. Submission Date for this Tender is 08-02-2024. Electrification Work Tenders in chamba Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | SOP to Public Electrical Vehicle Charging Station proposed at MHSHD Nayyar FillingStation [(p) 11/0.4kV 100 kVA S/stn -Supply Part] |
2 | 11/0.4 kV 100 kVA DTR ( REC Sep. Ord 11/1976) |
3 | Prov. ST Pole 9 mtr long W/L 200 kgs |
4 | Muff for steel tubular pole with concrete filling |
5 | X-arm ( Channel Iron 100x50x5 mm, length 2800mmx2 Nos. ) |
6 | M.S A.I (50x50x6 mm)Length 2800 mmx1 Nos. For LAs |
7 | X-Arm: [ Channel Iron (75x40x5 mm), Length 2800mmx4 Nos.] for supporting DO fuse Unit & GO Switch |
8 | X-arm ( Channel Iron 100x50x6 mm, length 2800mmx2 Nos. ) for transformer bed |
9 | X-arm ( Channel Iron 100x50x6 mm, length 460 mmx2 Nos. ) for supporting Main Channel of Transformer |
10 | M.S A.I (50x50x6 mm)Length 2800 mmx2 Nos. |
11 | M.S Angle Iron (35x35x5 mm) Length :460 mm x 2 nos. For bed knee bracing |
12 | M.S A.I (50x50x6 mm)Length 950 mmx2 Nos. |
13 | M.S A.I (50x50x6 mm)Length 2800 mmx2 Nos. For transformer LT Distribution Box and G.O Switch fixing assembly |
14 | M.S A.I (50x50x6 mm)Length 450 mmx1 Nos. For transformer LT Distribution Box and G.O Switch fixing assembly |
15 | G.O Switch handling supporting: [C.I (75x40x6mm); length 460 mm for Transformer LT Distribution Box and G.O Switch fixing assembly |
16 | G.O AB Swicth unit (11 kV, 400 A, 63KA) Triple pole O/D Type |
17 | D.O Fuse Unit assembly |
18 | Surge arrestor, 9kV ( Station Class) |
19 | Disc Insulator sets ( comprising 1 No. Disc ^^( Porcelain, BS, 12kV, 90 kN) i/c dead end clamp, ball cleave eye socket etc. |
20 | 11 kV Pin Insulator |
21 | Stay Set Complete |
22 | Stay wire(7/3.15 mm) (10 kg per set) |
23 | Pipe earthing with GI, Charcoal & Salt |
24 | Prov. LT Distribution Panel with MCCB (100 A, 10 kA, 4P, 1 No.) & SFU (25A, 4 No. Rewirable) for 100 kVA Trf as per specification |
25 | Half Clamp (MS Flat 50x6) |
26 | Full Clamp (MS Flat 50x6) |
27 | Stay Clamp |
28 | MS Nuts and Bolts off sizes ( Galvanized coated) (preferably 16 mm or more( with flat and spring washer) |
29 | Aluminium Thimbles |
30 | Copper Thimbles |
31 | Danger Plate |
32 | Barbed Wire (REC SpF 3/1981) |
33 | LT Cable 3-1/2 core-120 mm sq. |
34 | AB Cable 3x120x+90 sq. Mm ( LT Distribution to Panel Box) |
35 | Aluminium Paint |
36 | Red Oxide Paint |
37 | Prov. ACSR conductor 6/1/3.35 |
38 | LT Switched Capacitors for 100 kVA DTR ( 36 kVAr) |
39 | Prov. Transformer Bed plinth for 100 kVA s/stn structure complete with CC 1:6:12 R.R Masonry & plastering etc. a/w Chain link fencing, Angle Iron Gate etc. For DTR fencing |
40 | [(p) 11/0.4kV 100 kVA S/stn -Erection Part] |
41 | 11/0.4 kV 100 kVA DTR ( REC Sep. Ord 11/1976) |
42 | Prov. ST Pole 9 mtr long W/L 200 kgs |
43 | Muff for steel tubular pole with concrete filling |
44 | X-arm ( Channel Iron 100x50x5 mm, length 2800mmx2 Nos. ) |
45 | M.S A.I (50x50x6 mm)Length 2800 mmx1 Nos. For LAs |
46 | X-Arm: [ Channel Iron (75x40x5 mm), Length 2800mmx4 Nos.] for supporting DO fuse Unit & GO Switch |
47 | X-arm ( Channel Iron 100x50x6 mm, length 2800mmx2 Nos. ) for transformer bed |
48 | X-arm ( Channel Iron 100x50x6 mm, length 460 mmx2 Nos. ) for supporting Main Channel of Transformer |
49 | M.S A.I (50x50x6 mm)Length 2800 mmx2 Nos. |
50 | M.S Angle Iron (35x35x5 mm) Length :460 mm x 2 nos. For bed knee bracing |
51 | M.S A.I (50x50x6 mm)Length 950 mmx2 Nos. |
52 | M.S A.I (50x50x6 mm)Length 2800 mmx2 Nos. For transformer LT Distribution Box and G.O Switch fixing assembly |
53 | M.S A.I (50x50x6 mm)Length 450 mmx1 Nos. For transformer LT Distribution Box and G.O Switch fixing assembly |
54 | G.O Switch handling supporting: [C.I (75x40x6mm); length 460 mm for Transformer LT Distribution Box and G.O Switch fixing assembly |
55 | G.O AB Swicth unit (11 kV, 400 A, 63KA) Triple pole O/D Type |
56 | D.O Fuse Unit assembly |
57 | Surge arrestor, 9kV ( Station Class) |
58 | Disc Insulator sets ( comprising 1 No. Disc ^^( Porcelain, BS, 12kV, 90 kN) i/c dead end clamp, ball cleave eye socket etc. |
59 | 11 kV Pin Insulator |
60 | Stay Set Complete |
61 | Stay wire(7/3.15 mm) (10 kg per set) |
62 | Pipe earthing with GI, Charcoal & Salt |
63 | Prov. LT Distribution Panel with MCCB (100 A, 10 kA, 4P, 1 No.) & SFU (25A, 4 No. Rewirable) for 100 kVA Trf as per specification |
64 | Half Clamp (MS Flat 50x6) |
65 | Full Clamp (MS Flat 50x6) |
66 | Stay Clamp |
67 | MS Nuts and Bolts off sizes ( Galvanized coated) (preferably 16 mm or more( with flat and spring washer) |
68 | Aluminium Thimbles |
69 | Copper Thimbles |
70 | Danger Plate |
71 | Barbed Wire (REC SpF 3/1981) |
72 | LT Cable 3-1/2 core-120 mm sq. |
73 | AB Cable 3x120x+90 sq. Mm ( LT Distribution to Panel Box) |
74 | Aluminium Paint |
75 | Red Oxide Paint |
76 | Prov. ACSR conductor 6/1/3.35 |
77 | LT Switched Capacitors for 100 kVA DTR ( 36 kVAr) |
78 | CT/PT Unit assembly-supply part |
79 | Prov. 11 kV CT-PT Unit i.e PT (1 Unit, 11 kV/110 V) : CT (3 No. 50/5A) accuracy class 0.5 s |
80 | Prov. Energy meter (3 Phase, 4 Wire ) HT CT type for above |
81 | PVC Multistarnad 4 mm sq. Copper wire with 1 inch GI pipe for concealing |
82 | X-arm : [ Channel Iron (100x50x6mm), Length : 460 mm x2 Nos.) for supporting main channel for CT-PT Unit |
83 | CT-PT Unit Belting and knee-bracing |
84 | MS Angle Iron (50x50x5mm) Length 2800mx 4 Nos. |
85 | MS Angle Iron( 35x35x5 mm), Length 2800 mm x2 Nos. |
86 | Half Clamp (MS Flat 50x6) |
87 | Full Clamp (MS Flat 50x6) |
88 | Nuts & Bolts off sizes |
89 | Aluminium Thimble |
90 | Copper Thimbles |
91 | CT/PT Unit assembly-Erection part |
92 | Prov. 11 kV CT-PT Unit i.e PT (1 Unit, 11 kV/110 V) : CT (3 No. 50/5A) accuracy class 0.5 s |
93 | Prov. Energy meter (3 Phase, 4 Wire ) HT CT type for above |
94 | PVC Multistarnad 4 mm sq. Copper wire with 1 inch GI pipe for concealing |
95 | X-arm : [ Channel Iron (100x50x6mm), Length : 460 mm x2 Nos.) for supporting main channel for CT-PT Unit |
96 | CT-PT Unit Belting and knee-bracing |
97 | MS Angle Iron (50x50x5mm) Length 2800mx 4 Nos. |
98 | MS Angle Iron( 35x35x5 mm), Length 2800 mm x2 Nos. |
99 | Half Clamp (MS Flat 50x6) |
100 | Full Clamp (MS Flat 50x6) |
101 | Nuts & Bolts off sizes |
102 | Aluminium Thimble |
103 | Copper Thimbles |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail