Ministry Of Road Transport And Highways has published Tender For Consultancy Services For Preparation Of Detailed Project Report For Construction Of Rob In Lieu Of Existing Level Crossing No. 27 At Km 654.950 Of Nh - 150A, Jevargi - Chamarajanagara Section ( Scope Of Work Includes Alignment Approval From Mor. Submission Date for this Tender is 08-02-2024. Detail Project Report Tenders in Mysuru Karnataka. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | Geometrical design of road horizontal and vertical curves for design speed specified by IRC including carrying out trail for optimising of civil cost minimising land acquisition and maximum use of existing facility and preparation of widening arrangement drawing for insisting structures stake out date for horizontal alignment and working levels including super elevation effect etc. complete and as per the directions of Engineer-In-Charge of work. |
2 | Preparation of Engineering drawing as strip plan, widening scheme, index / key map, typical cross section, retaining walls, road furniture, general arrangement drawings for bus bays / truck lay-bays / rest areas / toll plaza / booths / and type drawing of pipe/ slab drains etc. on computer using Auto CADcomplete and as per the directions of Engineer-In-Charge of work. |
3 | Preparation of Land Acquisition proposal including collection of 7/12 and 8/A documents marking alignment on village maps , area calculation, preparation of proposal, printing,bindind, etc. complete and submission of 5 sets more ever liasoning and coordination with revenue authorities with compliance if any until finalisation of award including Joint measurement of the alignment. (For New alignment). complete and as per the directions of Engineer-In-Charge of work. |
4 | Carrying of detailed topographic survey by using total station along the existing or new road including taking L-section and cross section at every 30 meter ROW ,taking at least 10 spot levels per cross section, picking up all existing details inside the Row like electric telephone line , encroachments, structures etc. connecting all the primary total station control points by G.I.S.Bench marks level or whichever available with department using auto level and preparing Auto CAD plan by using above data taking out 1 set of black and white printout on 50 micron polyster film sheet A2 size and 2 sets of coloured printout on A2 size submitting soft copy all data on CD. (Plain Terrain New Alignment) complete and as per the directions of Engineer-In-Charge of work. |
5 | Design of junctions including detail layout of traffic signs, informatory boards traffic islands. Breaks in median verge including working levels at junctions as per IRC standards etc. complete. a) Major Junction. complete and as per the directions of Engineer-In-Charge of work. |
6 | Design of junctions including detail layout of traffic signs, informatory boards traffic islands. Breaks in median verge including working levels at junctions as per IRC standards etc. complete. a) Minor Junction.complete and as per the directions of Engineer-In-Charge of work. |
7 | Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia over burden ( by diamond drilling machine ) such as soil of all sorts, soft murum, hard murum and boulders and in soft rock including all materials such as casing pipes and accessories oil, grease, steel, rods, and such other materials as required (including conveying the material to site of work). Preserving the loose sample in glass jar and core sample serially on site of work and conveying the same to HQ of concerning office etc., complete and as per the directions of Engineer-In-Charge of work. |
8 | Taking trial bores 75 to 100 mm for 53.0 to 88.9 mm core dia in rocks as specified below including all necessary materials such as oil, grease, steel boostan and such other materials as required (including conveying the material to site of work) and Preserving the core sample serially on site of work and conveying the same to HQ of concernring office as directed. Quartzite with diamond drill with Nx Bit 0 to 50 m.etc., complete and as per the directions of Engineer-In-Charge of work. |
9 | Providing detailed geological reports of proposed site by maintaining geotechnical investigation of structure stratification collecting soil, rock and ground water samples for laboratory tests to arrive the foundation design parameters. Rock properties such as type of rock, jointing fractures, etc. complete with suggestion about the site foundation and remidesetc., complete and as per the directions of Engineer-In-Charge of work. |
10 | Demarcation of Road boundry (ROW) including fixing the boundry stones of standard size and shape including fixing in block of standard size of C.C. of 1:4:8 white washing at 30 M interval on both sidesetc., complete and as per the directions of Engineer-In-Charge of work. |
11 | Transfering and taking out design on coordinates of baseline on ground using nails for exsisting road surfaces and survey pegs for new alignments including taking out coordinates for horizontal curves at required interval of 50 m etc. complete.and as per the directions of Engineer-In-Charge of work. (Extra line such as right of way median edges to toe line not included). |
12 | Preparation of draft / Final Report comprising of technical, financial economic feasibility and environmental aspects of the project including executive summary and detailed chapters on necessity and introduction of project existing summary of available cost estimates justification for rates adopted, key points of execution, salient features of the project, location of toll plaza, toll rate / policy to be adopted and specification of major construction items etc. in 8 copies having attractive cover and binding s directed by engineer in charge etc. complete. and future traffic, design philosophy scope of work,etc., complete and as per the directions of Engineer-In-Charge of work. |