|
| 1 | Laying and Jointing PVC Pipe. Heading |
| 2 | Docking & undocking of Vessel |
| 3 | Dry-Docking of Vessel |
| 4 | Alongside docking of Vessel for afloat repairs |
| 5 | Steel renewal 5 Tons |
| 6 | Anodes to be replaced |
| 7 | Ultrasonic thickness Measurement |
| 8 | Servicing & Pressure testing of all Sea chest and OBD valves and Replacement of Corroded pipes |
| 9 | Sea Chest Gratings Cleaning and Painting |
| 10 | Additional fitment of E/Room flooring Chequered plate |
| 11 | Repairing of RPM Gauge in E/Room |
| 12 | Fitting of New Panel board Cluster with gauges and switches including emergency stop in wheel House for Port & Stbd |
| 13 | Cleaning of Heat Exchangers of Port & Stbd Engines |
| 14 | Cleaning of Intercooler of Port & Stbd Engines |
| 15 | Additional Emergency Bilge pump fitment in Engine Room- Mono block water cooled 5HP approved type |
| 16 | Marking of Reading Gauge for Diesel Tank |
| 17 | Replacement of Hose Pipes |
| 18 | Replacement of Electrical wiring engine room light fixture |
| 19 | Rectification of light point from S/Room compartment |
| 20 | Replacement of Deck light of Port & Stbd |
| 21 | Checking, Rectification and installation of all Navigation lights |
| 22 | Rectification of light points in wheel house |
| 23 | Fitting of 24v horn with a range of 2 miles |
| 24 | Provision of overhead tank for fresh water (200+200 Ltrs) |
| 25 | Replacement and fitment of Watertight door Port & Stbd |
| 26 | Mooring Bollard replacement06 Nos |
| 27 | Replacement of Port & Stbd Throttle/Gear Lever control unit into Single lever unit |
| 28 | Rudder angle indicator assembly to be installed |
| 29 | Overhauling of complete Propulsion & Rudder system |
| 30 | Hull Painting -Scrapping, surface preparation and painting complete vessel as per painting schedule with marine grade approved paint |
| 31 | Carpentry work |
| 32 | Air vents flaps & Sounding pipes to be serviced |
| 33 | Tyre fenders installation |
| 34 | Rubber beadings to allhatch openings emergency exits to be replaced |
| 35 | Additional Service/Lighting Battery arrangements with charging alternator to be provided |
| 36 | E/Room bilgesto be scrapped, clean and painted |
| 37 | LSA, FFA items to be serviced / renewed as applicable |