}

Supply And Maintenance Of Stadium Equipments, haridwar-Uttarakhand

Development Authority-DA has published Supply And Maintenance Of Stadium Equipments. Submission Date for this Tender is 19-02-2024. Earth Moving Machinery Tenders in haridwar Uttarakhand. Bidders can get complete Tender details and download the document.




Tender Notice

41946464
Corrigendum : Supply And Maintenance Of Stadium Equipments
Open Tender
Indian
Uttarakhand
haridwar
19-02-2024

Tender Details

Supply And Maintenance Of Stadium Equipments-Fountain Work 2 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means Over Areas ( Exceeding 30Cm In Depth. 1.5 M In Width As Well As 10 Sqm On Plan ) Including Disposal Of Excavated Earth, Lead Upto 50M And Lift Upto 1.5M, Disposed Earth To Be Levelled And Neatly Dressed. 3 Earth Work In Excavation By Mechanical Means ( Hydraulic Excavator ) / Manual Means Over Areas ( Exceeding 30Cm In Depth. 1.5 M In Width As Well As 10 Sqm On Plan ) Including Disposal Of Excavated Earth, Lead Upto 50M And Lift Upto 1.5M, Disposed Earth To Be Levelled And Neatly Dressed. 4 Diluting And Injecting Chemical Emulsion For Post-Constructional Anti-Termite Treatment ( Excluding The Cost Of Chemical Emulsion ) :Treatment Of Soil Under Existing Floors Using Chemical Emul 5 Supplying And Filling In Plinth With Jamuna Sand Under Floors, Including Watering, Ramming, Consolidating And Dressing Complete. 6 Excavating, Supplying, Stacking And Filling Of Local Earth ( Including Royalty ) By Mechanical Transport Upto A Lead Of 5Km Also Including Ramming And Watering Of The Earth In Layers Not Exceeding 20 Cm In Foundation Trenches, Plinth, Sides Of Foundation Etc. Complete For All Lift. 7 Providing And Laying In Position Cement Concrete Of Specified Grade Excluding The Cost Of Centering And Shuttering - All Work Up To Plinth Level :1:4:8 ( 1 Cement : 4 Coarse Sand : 8 Graded Stone Aggregate 40 Mm Nominal Size ) 8 Providing And Laying In Position Machine Batched And Machine Mixed Design Mix M-25 Grade Cement Concrete For Reinforced Cement Concrete Work, Using Cement Content As Per Approved Design Mix, Including Pumping Of Concrete To Site Of Laying But Excluding The Cost Of Centering, Shuttering, Finishing And Reinforcement, Including Admixtures In Recommended Proportions As Per Is: 9103 To Accelerate, Retard Setting Of Concrete, Improve Workability Without Impairing Strength And Durability As Per Direction Of Engineer-In-Charge. ( Note :- Cement Content Considered In This Item Is @ 330 Kg / Cum. Excess / Less Cement Used As Per Design Mix Is Payable / Recoverable Separately ) . All Works Upto Plinth Level. 9 Steel Reinforcement For R.C.C. Work Including Straightening, Cutting, Bending, Placing In Position And Binding All Complete Upto Plinth Level.Thermo-Mechanically Treated Bars 10 Centering And Shuttering Including Strutting, Propping Etc. And Removal Of Form For :Foundations, Footings, Bases Of Columns, Etc. For Mass Concrete 11 40 Mm Thick Rubbed Stone Flooring Over 20 Mm ( Average ) Thick Base Of Cement Mortar 1:5 ( 1 Cement : 5 Coarse Sand ) With Joints 3 Mm Thick, Side Buttered With Cement Mortar 1:2 ( 1 Cement : 2 Stone Dust ) Admixed With Pigment To Match The Shade Of Stone And Pointing With Same Mortar. White Sand Stone 12 Supply & Installation Of Fountain Machinery

Corrigendum Details

Sr No CorrigendumDate Corrignedum CorrigendumType NewSubmissionDate
1 05-Feb-2024 Revised Technical BId and BoQ Other 14-02-2024
2 13-Feb-2024 Date Extension Date 19-02-2024
3 17-Feb-2024 Technical Technical Bid 19-02-2024

Key Value

Document Fees
INR 5900 /-
EMD
INR 125000.0 /-
Tender Value
INR 4.80 Lakhs /-

BOQ Items

Name of Work: Supply of equipments for cricket ground.
Sl. No. Item Description
1Fountain work
2Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
3Earth work in excavation by mechanical means (Hydraulic excavator) / manual means over areas (exceeding 30cm in depth. 1.5 m in width as well as 10 sqm on plan) including disposal of excavated earth, lead upto 50m and lift upto 1.5m, disposed earth to be levelled and neatly dressed.
4Diluting and injecting chemical emulsion for POST-CONSTRUCTIONAL anti-termite treatment (excluding the cost of chemical emulsion) :Treatment of soil under existing floors using chemical emul
5Supplying and filling in plinth with Jamuna sand under floors, including watering, ramming, consolidating and dressing complete.
6Excavating, supplying, stacking and filling of local earth (including royalty) by mechanical transport upto a lead of 5km also including ramming and watering of the earth in layers not exceeding 20 cm in foundation trenches, plinth, sides of foundation etc. complete for all lift.
7Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :1:4:8 (1 Cement : 4 coarse sand : 8 graded stone aggregate 40 mm nominal size)
8Providing and laying in position machine batched and machine mixed design mix M-25 grade cement concrete for reinforced cement concrete work, using cement content as per approved design mix, including pumping of concrete to site of laying but excluding the cost of centering, shuttering, finishing and reinforcement, including admixtures in recommended proportions as per IS: 9103 to accelerate, retard setting of concrete, improve workability without impairing strength and durability as per direction of Engineer-in-charge. (Note :- Cement content considered in this item is @ 330 kg/cum. Excess/ less cement used as per design mix is payable/recoverable separately). All works upto plinth level.
9Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level.Thermo-Mechanically Treated bars
10Centering and shuttering including strutting, propping etc. and removal of form for :Foundations, footings, bases of columns, etc. for mass concrete
1140 mm thick rubbed stone flooring over 20 mm (average) thick base of cement mortar 1:5 (1 cement : 5 coarse sand) with joints 3 mm thick, side buttered with cement mortar 1:2 (1 cement : 2 stone dust) admixed with pigment to match the shade of stone and pointing with same mortar. White sand stone
12SUPPLY & INSTALLATION OF FOUNTAIN MACHINERY
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail