Work of attending Flue Gas Duct leakages at ESP inlet of AB & CD pass of Unit No. 4 during AOH at T PS Parii-Vaijnath, Work of Coal pipe hanger & support fabrication in U-4 during AOH at TPS, Parii, Work of thermal arc spray on boiler tubes in Unit 6 NPTP
Tender Overview
Project Description
Work of attending Flue Gas Duct leakages at ESP inlet of AB & CD pass of Unit No. 4 during AOH at T PS Parii-Vaijnath, Work of Coal pipe hanger & support fabrication in U-4 during AOH at TPS, Parii, Work of thermal arc spray on boiler tubes in Unit 6 NPTPS during AOH at Parli-Vaijnath, Work of removing & re-fitting of drum internals of U-4 during AOH at TPS, Parii-V, Work of coal mill oil cooler cleaning & sen/icing of seal air fan damper of Unit-4 during AOH at TPS, Parli- Vaijnath, Work of ultrasonic thickness survey of boiler tubes & NDT of Unit 4. during overhaul at TPS, Parli-Vaijnath, Work of providing insulation & cladding for boiler furnace, ducting, steam piping, valves etc. in U-3, 4 & 5 at TPS, Parii-V, Annual works contract for operational services in plant operation of Pre-treatment plant, Softening plant, DM plant and chemical lab ; transportation, handling and charging of chemical and misc. works at WT Plant of U# 6&7, NPTPS, Parli Vaijnath, Work of HAG shaft replacement / repair, Servicing of HAD & CAD, Fabrication Of RCF hopper and scrapper box platform repair during AOH of unit 4 at TPS, Parli-Vaijnath, Work of Fabrication of chute & replacement of pipe from RGF to ground level and Hot air duct patching in U # 4 during AOH, Work of Fabrication & fitting of expansion joint with shielding for coal mill hot air duct & In-situ repair of reject mouth opening of U#4 during AOH at TPS Parii-Vaijnath, Work of Erection & Commissioning of acid Circulation scheme during AOH of U#4 at TPS , Parii-V, Work of painting of overhead bridge of ash siurry line & B.A. hopper discharge line structure during A OH of Unit 4 at Parli-Vaijnath, Work of servicing of Clinker grinder, FA / BA Hyjector / Drain Hyjector & Replacement 7 Repair of worn out pipelines of AHP at B.A. Hopper area of U #4 during AOH at TPS, Parli- V, Work of Condensate Side Valves O/H in U#4 during AOH at iPS, Parii-V, Work of replacement of drain lines, sampling lines & HP valves, steam tracking lines from FF to OHP, steam lines & valves in OHP, WSB Guide pipe Fitting and duct patching above Eco. repairing of wind box expansion joints during A OH of Unit-4 at TPS, Parli-Vaijnath, Work of a) Attending BA/ FAhandling equipments & valves, b) Fabrication / Repair of distance piece between expansion bellow & ejectors of ESP hoppers) c) Replacement / repairing of worn out ejectors boxes of APH / Eco hopper during AOH of Unit-4 at TPS, Parli-Vaijnath, Annual Work Contract for Rail Track Maintenance of Railway Siding of NPTPS., Parli-Vaijnath,
AI Tender Summary
Tender Timeline
Tender Published
Tender notice published.
CompletedBid Submission Deadline
Online submission via eProcurement portal.
CompletedBid Opening Date
Technical bids will be opened and evaluated.
CompletedTender Documents
Download All (ZIP) ↓We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender