Tender For Beautification Of Chinar Dyke By Way Of Construction Of Toe Wall, Pitching, Parapet, Ornamental Fencing, Ghat Etc At Sk Payeen Bandipora, bandipora-Jammu And Kashmir

Forest Department-FD has published Tender For Beautification Of Chinar Dyke By Way Of Construction Of Toe Wall, Pitching, Parapet, Ornamental Fencing, Ghat Etc At Sk Payeen Bandipora. Submission Date for this Tender is 07-02-2024. Wall Construction Tenders in bandipora Jammu And Kashmir. Bidders can get complete Tender details and download the document.




Tender Notice

41927751
Tender For Beautification Of Chinar Dyke By Way Of Construction Of Toe Wall, Pitching, Parapet, Ornamental Fencing, Ghat Etc At Sk Payeen Bandipora
Open Tender
Indian
Jammu And Kashmir
bandipora
07-02-2024

Tender Details

Beautification Of Chinar Dyke By Way Of Construction Of Toe Wall, Pitching, Parapet, Ornamental Fencing, Ghat Etc At Sk Payeen Bandipora

Key Value

Document Fees
INR 5500 /-
EMD
INR 562588.0 /-
Tender Value
INR 2.81 Crore /-

BOQ Items

Name of Work:Beautification of Chinar Dyke by way of Construction of Toe Wall, Pitching, Parapet, Ornamental Fencing, Ghat etc. at SK Payeen Bandipora.
Sl. No. Item Description
1Earth work in bulkexcavation by mechanical means (hydraulic excavator) over areas ( exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) includingdisposal of excavated earth lead upto50 meters and lift upto1.5 m all kinds of soil.
2Close timbering in case of shafts, wells, cesspits,manholes and the like including strutting, shoring and packing cavities (wherever required) etc. complete. (Measurements to be taken of the face area timbered). Depth exceeding 3m but not exceeding 4.5 m.
3Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed. All kinds of soil.
4Filling empty cement bags with sand/earth; including cost of sewing and strings; excluding cost of bags and earth/sand
5Supply of empty cement bags
6Loading/Unloading sand/earth filled bags in lorries; lead upto 50 m
7Pumping out water caused by springs, tidal or river seepage, broken water mains or drains and the like
8Filling available excavated earth ( excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20 cm in depth , consolidating each deposited layer by ramming and watering, lead upto 50 m and lift upto 1.5 m.
9Providing, laying , spreading, compacting hand packed boulders/ stone soling in foundation trenches including ramming, all leads and lifts inclu. Carriages of material involved and headload etc. complete
10Providing, layingin position cement concrete of specified gradeincluding curingbut excluding the cost of centering and shuttering. All work upto plinth level with 1:4:8 (1 cement:4 coarse sand:8 graded stone aggregate 40mm nminal size)
11Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. All works upto plinth level 1: 2: 4 (1 Cement: 2 Coarse sand: 4 graded stone aggregate 20mm crushed)
12Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns etc. for mass concrete.
13Centering and shuttering including strutting, propping etc and removal of form for Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
14Steel reinforcement for R.C.C work includingstraightening, cutting, bending, placing in position and binding all complete upto plinth level. Mild Steel and meduim tensile steel bars.
15Providing, layingchiesel dressed Devri Stone of size 300x200 mm face with 150 mm depth in cement mortar1:6 (1 cement:6 coarse sand) upto plinth level including curing. One face dressed fine chiesel dressed
16Providing and laying in positioncement concrete of specified gradeincluding curing but excluding the cost of centering and shuttering. All work upto plinth level with 1:2:4 (1 cement:2 coarse sand:4 graded stone aggregate 20mm nominal size)
17Dry stone pitching (any thickness) excluding cost of stones on slopes
18Providing of Stones for pitching.
19Grassing with selection No.1 Grass including watering and maintenance of the lawn for the 30 days or more till the grass forms a thick lawn free from weeds and fit for moving including supplying of good earth if needed (the good earth shall be paid separately) with grass turf
20Stone work, ashlar sunk or moulded or sunk and moulded upto floor five level in cement mortar 1:6 ( 1 cement : 6 coarse sand) including pointing with white cement mortar 1:2 (1 white cement : 2 stone dust ) with an admixture of pigment matching the stone shade and curing complete. (White Sand Stone)
2112mm cement plaster of mix 1:4 (1 cement: 4 fine sand)
22Providing and laying 60 mm thick factory made cement concrete interlocking paver blockof M-30 grademade by block making machine with strong vibratory compaction and ofapproved size and design/ shape laid in required colour and pattern over and including50 mm thick compacted bed of fine sand filling the joints with coarse sand etc. all complete as per the direction of Engineer Incharge.
23Providing and laying at or near ground level factory made kerb stone ofM-25 grade cement in position to the required line, level and curvature jointed with cement mortar 1:3 (1 cement:3 coarse sand) including making joints with or without grooves ( Thickness of the joints except at sharp curve shall not to be more than 5 mm)including making drainage opening wherever required complete etc. as per the direction of Engineer Incharge. (Length of finished curve edging shall be measured for payment).( Precast C-C. Curve stone shall be approved by Engineer Incharge of required dia).
24Providing and fixing Plastic Channels/ Conduits standard quality of required dia for electrification, inclidingcost of material, complete.
25Excavating, supplying and filling of local earth (with royalty) by mechanical transport upto a lead of 5 km including ramming and watering in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete.
26Machine brick work using machine madebrick of class designation 100 in superstructure in cement mortar 1:4 mix including cast and carriage of material involved complete.
27Structural steel work in single section, fixed with or without connecting plat, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete (using hollow section / angle iron/flat iron/ square or round bar).
28Painting with synthetic enamel paint of approved brand and manufacture to give an even shade. Two or more coats on new work
29Varnishing with varnish of approved brand and manufacture with two or more coats of glue sizing with spar varnish on an under coat of flatting varnish including dressing, sanding, cleaning and preparing a smooth base including applying of pigment of approved brand and colour ( as directed by the Engineer Incharge), complete Job.
30Carriage of Sand/stone aggregate by mechanical transport for an average lead of 35 Kms including loading and unloading and stacking complete
31Carriage of Cement/Steelby mechanical transport for an average lead of 10 Kms including loading and unloading and stacking complete
32Carriage of Stones by mechanical transport for an average lead of 10 Kms including loading and unloading and stacking Complete
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail