|
| 1 | Carrying out maintenance and inspection of fire extinguishers on monthly basis including pastings/ marking of maintenance date, cleaning, replacement of defective parts ( IHBL supplied), measuring weight and charges for labour, including oiling, greasing, testing as per direction of EIC inclusive of all tools &tackles, consumables, transportation, labour charges etc and measuring instruments for the sameas directed by the EIC/ Site engineer and submitting the reports of the inspection as per HSE manual format (payment of spares not supplied by IHBL shall be made as per respective items) |
| 2 | For 10/9 KG. CAPACITY DCP extinguisher |
| 3 | For 75/70/50 KG. CAPACITY DCP extinguisher |
| 4 | For 2 KG. CAPACITY CO2 extinguisher |
| 5 | For 4.5 KG. CAPACITY CO2 extinguisher |
| 6 | For 6.8 KG. CAPACITY CO2 extinguisher |
| 7 | For 2.5 KG CAPACITY Clean agent extinguisher |
| 8 | Monthly: Checking, inspection, maintenance, greasing, cleaning, oiling, replacement of disc washer, blank cap if any including complete overhauling etc. of Double headed hydrant valves alongwith all tools, tackles, manpower, material etc. Payment for disc washer, coupling washer &blank cap shall be made separately. |
| 9 | Supplying and fitting of Hydrant Disc Washer as per directions of Engineer-in-Charge |
| 10 | Supplying and fitting of Fire Hydrant/ Fire Hose coupling washer as per directions of Engineer-in-Charge |
| 11 | Supply and fitting of blank cap (as per IS 5290 , red colour with GI chain) suitable for 63 mm hydrant outlet as per direction of EIC |
| 12 | Supplying & fitting spindle assembly (Gunmetal) as per directions of Engineer-in-Charge |
| 13 | Repair of adaptor lug of hydrant/ hose inclusive of all tools, tackles, manpower etc. |
| 14 | Monthly maintenance of Monitors: Oiling & greasing through grease nipple provided on bearing, worm wheel and worm shaft, cleaning, performance checking for complete vertical and horizontal movement, nozzle movement, water throw, foam suction, ensuring proper tightning of flanges, clearing the debris around the nozzle etc as per approved procedure including tools & tackles, report submission complete as per direction of Site Engineer / EIC. Water resistant low friction synthetic grease, grease gun and all other consumable etc shall be arranged by vendor. |
| 15 | Valve Maintenance : Checking, inspection, greasing, cleaning,oiling etc. of all fire water valves, of all sizes upto 18\" including Greaseand all labour, tools & tackles complete as per direction of SiteEngineer / EIC and provided by contractor. All such valves shall befully closed and opened and restored in origional condition as peradvise by EIC/ Site Engineer.Note: The valve sizes may vary upto 18\". Rates are per valve. |
| 16 | Hydrotesting of fire fighting delivery hose of dia 63 mm on half-yearlybasis (Type A and B) by making arrangement of hydraulic pump, blind,shifting from plant area, building, drying etc as per approved procedurealong with Site engineer/ EIC, including tools & tackles, reportsubmission, writing of same on hose complete as per direction of SiteEngineer / EIC. |
| 17 | Hydrotest of DCP extinguishers, making empty out by pouring outside thecylinder, internal /external cleaning and repairing of various accessories such as cap assembly , discharge hose pipes, pressure gaugeetc. by supplyling manpower gasket washer etc. Cylinder surfacepreparation / and application of one coat of red oxide primer andfollowed by two coat of synthetic enamel paints (fire red- Asian paint/Berger/ Nerolac) (Hydrotest proceudre will be same as briefed in IS2190: 2010 ) |
| 18 | For 10/9/5 KG. CAPACITY DCP extinguisher |
| 19 | For 50/70/75 KG. CAPACITY DCP extinguisher |
| 20 | Hydrostatic testing, inspection of safety valve and refilling of highpressure CO2 cylinder through CCE approved party and charging up to required pressure including taking delivery of the cylinder from thestation and returning the same inclusive of all labour material,transporation and all the other incidental expenses. The cylinder is tobe returned back to the station within two week from the date ofreceiving from the station. |
| 21 | For 4.5 KG. CAPACITY CO2 extinguisher |
| 22 | For 2 KG. CAPACITY CO2 extinguisher |
| 23 | For 6.8 KG. CAPACITY CO2 extinguisher |
| 24 | Maintenance/checking/ Refilling of Fire buckets with sand & canopy as per the direction and satisfaction of Site engg/ EIC. |
| 25 | Hydrotesting & Refilling of (SCBA)/Breathing Apparatus set cylinders (as and when required) with dry compressed air up to a pressure of 300 bar as per OISD guidelines and as per the direction and satisfaction of Site engg/ EIC,inclusive of transporation handling charges, hydrtoesting from CCE approved party complete in all respect. |
| 26 | Complete overhauling of hand operated siren including oiling, greasing,painting and testing as per direction of EIC inclusive of all tools &tackles, consumable, transportation etc. |
| 27 | Inspection, testing and maintenance of eye wash unit & safety shower,greasing of moving pointsand valve. Cleaning of platform and otherrequired rectification work ioncluding , labour charges, tools &tackles,consumables complete in all respect as direction of EIC. |
| 28 | Annual Testing of Fire water Network system as per procedure of OISD STD 117(Clause No.8.2.(i). The job includes all labour charges, Tools & Tacklesetc. |
| 29 | Opening of blind flange of watercurtain/ spray system,cleaning of water line, dechoking of spray nozzles, refixing it with after testing with new gasket.etc of water spray system of all buildings/ locations (on quarterly basis) including nozzle dechoking, strainer cleaning and all labour, tools & tackles completeas per direction of the site Engineer/ EIC. (rates per blind /opening) |
| 30 | Half yearly Calibration of Explosive meter Sensor: CO, O2, LEL, H2S from authorized party |
| 31 | Refilling of clean agent media in extinguishers of capacity 2 Kgincluding transportation, labour within 15 days of intimation completein all respect. |
| 32 | Supply, Installation of new gas Supply, Installation of new gas andrefilling of CO2 gas in cartridges for using in DCP extinguishers including all labour, transportation etc. complete as per specificationand direction of EIC/Site-Engineer. (CO2 CARTRIDGE OF 120/ 200g MS) as per directions of Engineer-in-Charge |
| 33 | REPLACEMENT OF DEFECTIVE PARTS BY SUPPLY AND FITTING OF ITEMS FOR 9 KG/10 KG DCP EXTINGUISHER |
| 34 | Discharge hose with squeeze grip, hose should not burst or show leakage before 50 Kgf/cm2. as per directions of Engineer-in-Charge |
| 35 | Safety clip (metal) with nylon thread |
| 36 | DCP extinguisher cap washer |
| 37 | Inner container |
| 38 | Cap Assembly Gun Metal |
| 39 | Discharge tube washer |
| 40 | REPLACEMENT OF DEFECTIVE PARTS BY SUPPLY AND FITTING OF ITEMS 50/70/75KG DCP EXTINGUISHER |
| 41 | Discharge hose with clamps (6.5 mtr length). Hose should not burst or show leakage before a pressure of 50 Kgf/cm2. |
| 42 | Brass connection tube between CO2 cylinder & DCP cylinder with leather washer. |
| 43 | Cap washer |
| 44 | Trolley wheel set with required fittings |
| 45 | REPLACEMENT OF DEFECTIVE PARTS BY SUPPLY AND FITTING OF ITEMS FORFOR CO2 EXTINGUISHERS |
| 46 | HDPE discharge horn for 2 Kg/4.5 kg/ 6.8 Kg CO2 extinguisher along with bend pipe fitting complete in all respect as per direction of EIC. |
| 47 | High pressure discharge hose for 4.5 Kg/ 6.8 Kg Co2extinguisher with fittings as per direction of EIC. |
| 48 | Handle for 2 Kg /4.5 KgCO2 extinguisher |
| 49 | Safety pin with nylon string for CO2 extinguisher (For all sizes) |
| 50 | Supply & fitting plastic safety pin holder in CO2 extinguisher. |
| 51 | Supply and fitting of clamps for hanging 2/4.5 kg CO2 extinguishers on wall including labour charges, tools and tackles and consumables complete in all respect as per direction of EIC |
| 52 | Supply & fitting of rubber beeding of the complete one hose box (both doors) as per direction of EIC including removing of worn out rubber beeding, labour charges, tools & tackles etc. complete in all respect |
| 53 | Supply & fitting of glass of hose box (Both side of the box) inclusive of rubber beading, SS hinge, adopter, nut bolts wherever required complete in all respect inclusive of material, labour, consumables etc. (Rate inclusive of both glasses & rubber beading) |
| 54 | Painting and numbering of Hose Box \" Yellow shade\" as per IS 5, paint shall be corrosive resisitant shall confirm to IS-2932 including alltools & tackles material as per direction of EIC. |
| 55 | Supply and Fitting of new wind sock (fluoroscent in two colour), removing of old wind sock made out of synthetic cloth in flood light tower, buildings,upto height of 10 M, as per direction of site engineer/ EIC. Approval to be granted for wind sock prior to supply. |
| 56 | Erection and supply of stand post of wind sock (up to height 15 mtr.) in place of damaged stand post as per specification of IOC and EIC including tools and tackles, labour chargesets complete in all respect. |
| 57 | Supply and installation of quartz bulb of temp. rating 79deg C, 5 mm thick glass bulb, glass bulb yellow colour including transportation, labour, consumables etc complete in all respect. |
| 58 | Replacement of broken glass broken of MCP ( Size 4.5\"X 3.5\") as per the direction and satisfaction of Site engg/ EIC. |
| 59 | Removing of old paint from blistered painted surface of steel and othermetal surfaces by chipping including scrapping, cleaning and exposing the original iron surface without any damage to the structure/pipes at all heights by using hand wire brush, sand paper or by any other methodapproved by EIC/site engineer. The job includes cost of material, Labourcharges, transportation charges, tools & tackles etc. |
| 60 | Applying one coat primer of Berger protection (50 Micron DFT) or anyother equivalent of Asian Paints or Dulux over prepared/cleaned surfaceas per manufacturer’s specification. The DPT per Coat shall be as permanufacturer guidelines and EIC and shade as directed by site engineer/Engineer-in-charge. The job includes cost of material, Labour charges,transportation charges, scaffolding etc. tools & tackles etc. |
| 61 | Two coat Painting with best quality synthetic enamel paint of approved make & brand including smoothening surface by sand papering etc.including using of approved putty etc. on surface if necessary. The jobincludes cost of material, Labour charges, transportation charges, tools& tackle sets. |
| 62 | Painting of sand bucket with one coat of red oxide primer and two coat ofsnythetic enamel paints(fire red from outside and white from inside), writingletter on sand bucked (by stencils) complete in all respect including labour, charges, materials, removing ofold sand filling back the sand after painting etc.The job includes cost of material, Labour charges, transportation charges, tools & tackle sets. |