}

Tender For Installation Of Hpc And Hci Cluster System At Icgeb Campus, New Delhi Component, New Delhi-Delhi

International Centre for Genetic Engineering and Biotechnology has published Tender For Installation Of Hpc And Hci Cluster System At Icgeb Campus, New Delhi Component. Submission Date for this Tender is 13-02-2024. Customised Software Development Tenders in New Delhi Delhi. Bidders can get complete Tender details and download the document.




Tender Notice

41878828
Tender For Installation Of Hpc And Hci Cluster System At Icgeb Campus, New Delhi Component
Open Tender
Indian
Delhi
New Delhi
Due Date Not Mentioned, Contact Concern Authority.

Tender Details

Tender For Installation Of Hpc And Hci Cluster System At Icgeb Campus, New Delhi Component (I): Master cum Log in Node (CPU-CPU), Qty – 1 Node (II): Compute Nodes (CPU-CPU), Qty – 3 Nodes (III): GPU / Accelerator Node (CPU-GPU), Qty – 1Node (IV): Workload Manager: (X). Licensed Node Management S/W: The Node management stack with a GUI based system monitoring for all the cluster nodes. (Academic License) (XI). Interconnect-Network Switch (XII). Server RacK: XIII. Unified Storage System Virtual Computing through Converged Architecture Description Converged Infrastructure Solution Per Physical Node Interconnects Switch Cloud Storage Solutions (50 TB, and scalable in multiples of 10 TB) Rack Layout for Proposed HPC and HCI Solution 1 Master cum Log in Node (Each node with 56 CPU Cores, 128GB Memory, 1TB SSD in RAID, 14TB SSD in RAID 5) 1 2 Compute Nodes (Each node with 56 Cpu Cores, 256GB Memory, at least 1 SSD ) 3 3 GPU / Accelerator Node (Each node with 32 CPU Cores, 1TB Memory, 1x Nvidia A100,80GB GPU and at least 1 SSD) 1 4 Workload Manager 1 5 OS and Job Scheduler 1 6 Node Management Software 1 7 Primary Switch on 10G Network 1 8 Secondary Switch on 1G Network 1 9 100TB or more Unified Storage System 1 10 42U Standard Server Rack with KVM Console and accessories as per bid document 1 11 Software’s Support for 5 Years 1 12 Hardware Supports for 5 years 1 13 Onsite Installation 1 14 Onsite Training Useable resources minimum 200 CPU Cores, 8.5GB Per Core Memory, 20TB NVMe SSD Storage with RF3 1 Compute Nodes 4 2 Infra Node 1 3 Primary Switch on 10G Network 1 4 Secondary Switch on 1G Network 1 5 Virtual Compute Licenses 1 6 Backup of All Virtual Machines has to take in offered Storage of Parallel Computing Solution 1 7 Software’s Support for 5 Years 1 8 Hardware Supports for 5 years 1 9 Onsite Installation 1 10 Onsite Training

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail