Dakshinanchal Vidyut Vitran Nigam Limited-DVVNL has published Tender For Shifting And Construction Of 33-11 Kv Sub-Station Aurangabad Urban And Associated 33-11 Kv Lines. Submission Date for this Tender is 07-02-2024. Substation Tenders in mathura Uttar Pradesh. Bidders can get complete Tender details and download the document.
Sr No | CorrigendumDate | Corrignedum | CorrigendumType | NewSubmissionDate |
1 | 03-Feb-2024 | Date Extension-1 | Date | 07-02-2024 |
Sl. No. | Item Description |
1 | Part-A (Supply of Material) As per RESSPO Norms & Drawaing |
2 | SUB-STATION PART:- 33 KV Terminal Gantry with Plinth & Foundation |
3 | Main Bus Bar complete with Structure.Plinth & Foundation (Excluding 33 KV Disc Insulator, 33 KV Fitting & Conductor) |
4 | Structure for Line & Bus Isolator. with Plinth & Foundation |
5 | 33 KV Post Insulator |
6 | Structure for Post Insulator with Plinth & Foundation |
7 | Structure for Lightening Arrestors with Plinth & Foundation |
8 | 90 Lbs. Rail pieces for T/F |
9 | CT Steel structure with Plinth & Foundation |
10 | Plinth & foundation of 33 KV VCB. |
11 | Structure for P T with Plinth & Foundation |
12 | 33 KV Fuse Set |
13 | Structure for fuse Set with Plinth & Foundation |
14 | 24 V Battery with Battery Charger and Cabinet. |
15 | Control cable:- (i) 4 × 2.5 Sq.mm. |
16 | (ii) 2 × 2.5 Sq.mm. |
17 | L.T.Cable Al. 3.5 × 70 Sq.mm . |
18 | Earthing of Sub-Station:- (i) Outdoor Equipment (Earth Mat) |
19 | (ii) Indoor Equipment (Earth Mat) |
20 | Water lable Pipe Earthing for Neutral of Power T/F |
21 | Chemical Pipe Earthing |
22 | Alluminium Paint for painting of Sub-Station Structure & equipment. |
23 | Red Oxide Paint for painting of Sub-Station Structure & equipment. |
24 | Furniture for control room (Office Chair-2 no ,Office Table -2 No. Sitting branch-1 no. Stool -2 no. Office rack-1 no made of steel) Fire Fighting equipment with stand complete. Fire extinguisher CO2 type 5.0 Kg no-1 ,Fire extinguisher CO2 type 4.5 Kg.no-1, I.S.I. mark. ,Fire Bucket stand size 1500x1200mm.-no-1, Fire bucket made ofB.P. sheet 20 gage ( conical shape ) having capacity 10 Ltr.- 10” dia -4 no., Chakkered rubbur sheet 2000x1000x10 mm. I.S.I. mark.-no-4 Boards OF S/S Making and fixing of protectionBoard alongwith all accessories complete made of sunmica 10 mm sheet size 45×60 Cm.-no-2 ,Supply and fixing of sub-station name board made of M.S. Angle 50×50×6 mm and S.P. Sheet of 18 SWG including painting and writing.-no-1 |
25 | SWITCH YARD LIGHTING ARRANGMENT stone Pade -6 No PVC Cable 2x4 SQMM -200 Mtr PVC Conduct Pipe -15 mm- 150 Mtr D.P.Switch 63 A for one way control-01 No. Rest for DI Board, D.P. Switch32A-1, D.P. Switch 16 A-1, Kit Kets-6 including wiring.-1 Job LED Light 100 W -6 No. |
26 | 33 KV LINE PART:- P.G. Clamp for Dog Conductor |
27 | ‘E’ Bracket for 33 KV |
28 | G.I Pipe 160 mm Dia for Double Pole Structure |
29 | Clamps for fixing of Cable and Cable Box |
30 | Clamps for holding of G.I PIPE |
31 | Cable Marker |
32 | Wooden Bushes |
33 | 11 KV LINE PART:- Stone Pad 300x300x75 mm |
34 | Cross Arm Holding Clamp with Nut & Bolts for PCC Pole |
35 | ‘F’ Bracket with Nut & Bolts |
36 | Barbed wire |
37 | Alluminium Binding wire ( 5 mm dia ) |
38 | Painting number mark with Paint |
39 | 11 KV Danger Board with clamp & bolts |
40 | Alluminium Paint |
41 | Red Oxide |
42 | M.S. Angle 65x65x6x2700 mm Bracing Set with 8 Nos.Clamps. |
43 | Top Channel 100x50x2240 mm. |
44 | Top Channel 125x65x3200 mm. |
45 | Dropper Channel 100×50×2028 mm with clamp for cable supporting |
46 | Dropper Channel 100×50×2800 mm with clamp for cable supporting |
47 | Clamps for Top Channel with Nut & Bolts |
48 | P.G. Clamp for Dog Conductor |
49 | ‘E’ Bracket for 11 KV with Nut & Bolts |
50 | M.S Nut & Bolt with Warshers |
51 | Lug 185 sqmm |
52 | T" OFF M.S. Channel 100 x 50 x6X 1300 mm. |
53 | M.S Angle 50x50x6 1500 mm for Top Channle Support |
54 | M.S. Angle 65x65x6x3010 mm.x 2 Nos. |
55 | M.S. Angle holding clamp with nuts and bolts |
56 | Eye Bolts |
57 | G.I. wire 6 SWG |
58 | G.I. wire 8 SWG |
59 | Turn Buckle |
60 | Connecting Clamps |
61 | G.I. M+6 Type 19.30 Mtr Long |
62 | HDPE Pipe 160 mm O/D PN-6, PE-100 Grade UV Stabalized for laying at DoublePole Structure to proposed Double Pole Structure |
63 | G.I Pipe 160 mm Dia for Double Pole Structure |
64 | Clamps for fixing of Cable and Cable Box |
65 | Clamps for holding of G.I Pipe 160 mm |
66 | Cable Marker |
67 | Wooden Bushes |
68 | M.S. Angle 65x65x6 mm,2028 mm. long for G.I. Pipe supporting @ 5.8 Kg/M |
69 | Copper L-Piece of size 400x50x6 mm for LT bushing Rod of transformer |
70 | LT Aluminium insulated Cable of size 1x16 Sq.mm. (for HT jumpering) |
71 | Al. crimping lugs:- Al. crimping lugs 35 sq.mm. |
72 | Al. crimping lugs 50 sq mm. |
73 | Al. crimping lugs 70 sq.mm. |
74 | SMC MCCB Distribution board (1 No. I/C & 3No. O/G) |
75 | Sub Total of Part-A (Supply of Material) |
76 | Part-B (Erection Work) As per RESSPO Norms & Drawaing |
77 | [SUB-STATION PART] Carriage of following material from Center Store to Site 33 KV Line Isolator. |
78 | 33 KV Bus Isolator. |
79 | 33 KV Lightening Arrestors |
80 | 33/11 KV Transformer 10 MVA |
81 | 33 KV VCB 800A, 750MVA with Steel structure |
82 | Control panel I/C for 33 KV single T/F |
83 | Control panel I/C for 33 KV double T/F |
84 | 33 KV CT 400/200/1-1A |
85 | 33 KV CT 200/100/1-1A |
86 | 33 KV 1 Ph PT 33 KV/110 V |
87 | 11 KV SWITCH GEARS VCB :- (i) Incoming VCB 600/300/5A, 350MVA, I /C |
88 | (ii) Outgoing VCB 200/100/5A, 350MVA |
89 | (iii) Bus coupler 350 MVA |
90 | 11KV 3 Core XLPE Cable:- (i)3 × 300 Sq.mm |
91 | (ii) 3 × 185 Sq.mm |
92 | 11KV Cable jointing kit. Heat Shrinkable:- (i) 300 Sq.mm Indoor |
93 | (ii) 300 Sq.mm Outdoor |
94 | (iii) 185 Sq.mm. Indoor |
95 | (iv) 185 Sq.mm. Outdoor |
96 | 11/0.4 KV,63 KVA Transformer. |
97 | PCCPole 8.5 mtr. Long for Switch yard Lightening |
98 | 33 KV Disc Insulators B&S Type 7000 Kg. for Main BusBar |
99 | Disc Fittings for Dog/Raccoon7000 Kg. for Main BusBar |
100 | CONDUCTOR A.C.S.R. Dog conductorfor switch yard |
101 | 33 KV Disc Insulators B&S Type 7000 Kg. |
102 | Disc Fittings for Dog/Raccoon7000 Kg. |
103 | 33 KV Pin Insulator |
104 | 33 KV Pin with nut |
105 | 33 KV LINE PART:- 33 KV XLPE Cable 3 x 300 Sqmm |
106 | 33 KV Heat Shrinkable cable boxes 3 x 300 Sqmm O/D |
107 | 11 KV LINE PART:- 11 Mtr. long S.T.P., SP-70 Pole. |
108 | 13 Mtr. long S.T.P., SP-70 Pole. |
109 | ‘V’ Type Cross Arm for 11 KV |
110 | 11 KV Pin Insulator |
111 | 11 KV Pin with N&B |
112 | Earthing complete |
113 | 11 KV Disc Insulators T&C Type 4500 Kg. |
114 | 11 KV Disc fittings T&C Type 4500 Kg. |
115 | Stay set Complete for 11 KV line |
116 | A.C.S.R. DOG CONDUCTOR |
117 | 11 KV XLPE Cable 3 ×185 Sq mm |
118 | 11 KV Heat Shrinkable cable boxes 3×185 sqmm O/D |
119 | 11KV TPMO with fixing clamp complete |
120 | 11 KVFuseSet |
121 | 11 KV Lightning arrestor |
122 | ERECTION OF FOLLOWING MATERIALS SUB-STATION PART ERECTION & GROUTING OF TERMINAL GANTRY STRUCTURE:- The work incudes fabrication of Terminal gantry on Rail 90 lbs 8.23 M long x 4 Nos = 32.92 M, @44.61 Kg/Mtr. = 1468.56 Kg. as per drawing No. RES.38. Digging of Two Nos. pits of size 2.2 mtr. X 1.4 mtr. X 0.75 mtr. Providing stone pad at the bottom of thetrench and grouting of the two legs of the terminal gantry in CC ( Cement,Coarse sand and Stone grit of20 mm gauge.) in the ratio 1:3:6 includingsupply of all T & P,shuttering etc. in a block of size 2.2 mtr. x 1.4mtr. x 0.75mtr. The work consists of dragging, shifting up to 40 Mtrs, raising and erecting the two fabricated legs of terminal gantry in proper alignment, level and plumb. Both the plinths of the terminal gantry shall be properly finished with champering of edges. |
123 | INSTALLATION OF MAIN BUS BAR COMPLETE : The work incudes fabrication of Main Bus -Bar Rail 90 lbs 6.4 M long x 4 Nos = 25.60 M, @44.61 Kg/Mtr. = 1142.016 Kg. . Providing stone pad at the bottom of thetrench and groutingof the four legs of the main bus -barin CC ( cement,Coarse sand and Stone grit of20 mm gauge.) in the ratio 1:3:6 includingsupply of all T & P,shuttering etc. in a block of size 2.2 mtr. x 1.4mtr. x 0.75mtr. The work consists of dragging, shifting up to 40 Mtrs, raising and erecting the two fabricated legs of terminal gantry in proper alignment, level and plumb. Both the plinths of the terminal gantry shall be properly finished with champering of edges. |
124 | INSTALLATION OF LINE ISOLATOR : Assembling and installation of Line Isolator on the Bus Isolator structure. The work includes fabrication for proper fixing if required. |
125 | INSTALLATION OF BUS ISOLATOR : Assembling and installation of Bus Isolator on the Bus Isolator structure. The work includes fabrication for proper fixing if required. |
126 | INSTALLATION OF POST INSULATOR : Assembling and installation of Post Insulator on the Post Insulator structure. The work includes fabrication for proper fixing if required. |
127 | INSTALLATION OF LIGHTENING ARRESTOR : Assembling and installation of Lightening Arrestor on the Lightening Arrestor structure. The work includes fabrication for proper fixing if required. |
128 | INSTALLATION OF 33 KV FUSE SET : Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing if required. |
129 | INSTALLATION OF 33 KV C T : Assembling and installation of C T on the C T structure. The work includes fabrication for proper fixing if required. |
130 | INSTALLATION OF 33 KV P T : Assembling and installation of P T on the P T structure. The work includes fabrication for proper fixing if required. |
131 | INSTALLATION OF 33 KV VCB : Assembling and installation of VCB on the VCB structure. The work includes fabrication for proper fixing if required. |
132 | INSTALLATION OF 33 KV CONTROL PANEL FOR SINGLE T/F : Assembling and installation of 33 KV CONTROL PANEL for SINGLE T/F in the control room. The work includes fabrication for proper fixing if required. |
133 | INSTALLATION OF 33 KV CONTROL PANEL FOR DOUBLE T/F : Assembling and installation of 33 KV CONTROL PANEL for DOUBLE T/F in the control room. The work includes fabrication for proper fixing if required. |
134 | INSTALLATION OF 33/11 KV 10 MVA POWER TRANSFORMER: Assembling and installation of 33/11 KV 10MVA POWER TRANSFORMER on the plinth. The work includes fabrication for proper fixing if required. |
135 | INSTALLATION OF 11/0.4 KV 63 KVA POWER TRANSFORMER: Assembling and installation of 11/0.4 KV 63 KVA POWER TRANSFORMER on the Double pole struture. The work includes fabrication for proper fixing if required. |
136 | ISOLATOR STRUCTURE : Fabrication of isolator structures 3.5 Mtrs. in height as per drawing No. RES. 39 Digging of two Nos. pits of size of 1.075x 0.9 x 0.3 Mtr., providing stone pad at the bottom of the pit and grouting pad at the bottom of the pit and grouting of two legs of the isolator structure in CC of two legs of the isolator structure in CC ( Cement, coarse sand and stone grit of 20 mm gauge ) of ratio 1:4:8 in block of 1.075 Mtr. x 0.9 Mtr. x 0.3 Mtr. including supply of all T & P complete in all respect. The work includes dragging , shifting up to 40 Mtrs., raising and erecting the two legs with runner of isolator in proper alignment, level and plumb. Both plinth of the isolator structure shall be properly finished with champering of edges. |
137 | LIGHTENING ARRESTOR/ POST INSULATOR/FUSE SET STRUCTURE: Fabrication of Lightening arrestor / post insulator / fuse set structure as per drawing No. RES. 39 Digging of two Nos pits of size of 1.075x 0.3x 0.3 Mtr. , providing stone pad at the bottom of the pit and grouting of two legs of the above structures in CC ( Cement, coarse sand and stone grit of 20 mm gauge ) of ration 1:4:8 in block of 1.075 Mtrs. x 0.3 Mtrs. x 0.3 Mtrs. including supply of all T&P complete in all respect. The work include dragging, shifting up to 40 Mtrs., raising and erecting the two legs with top frame above structures in proper alignment, level and plumb. Both plinths of the structures shall be properly finished with champering of edges etc. |
138 | C T/P T STRUTURE: Fabrication of C T / P T structure as per drawing No. RES. 39 Digging of two Nos pits of size of 1.075x 0.3x 0.3 Mtr. , providing stone pad at the bottom of the pit and grouting of two legs of the above structures in CC ( Cement, coarse sand and stone grit of 20 mm gauge ) of ration 1:4:8 in block of 1.075 Mtrs. x 0.3 Mtrs. x 0.3 Mtrs. including supply of all T&P complete in all respect. The work include dragging, shifting up to 40 Mtrs., raising and erecting the two legs with top frame above structures in proper alignment, level and plumb. Both plinths of the structures shall be properly finished with champering of edges etc. |
139 | PLINTH & FOUNDATION FOR VCB STRUTURE: Digging of VCB Struture of size of 1.5x 1 x 1 Mtr. , providing stone pad at the bottom of the pit and grouting ofthe above structures in CC ( Cement, coarse sand and stone grit of 20 mm gauge ) of ration 1:4:8 in block of 1.5 Mtrs. x 1 Mtrs. x 1 Mtrs. including supply of all T&P complete in all respect. The work include dragging, shifting up to 40 Mtrs., raising and erecting thetop frame above structures in proper alignment, level and plumb. plinths of the structures shall be properly finished with champering of edges etc. |
140 | PAINTING OF STRUCTURE : Painting of Isolator/L.A./Post Insulator/Fuse Set/C T/P TStructures with two coats of Aluminum paint of good quality including cost of material, labour and T&P complete in all respect. |
141 | Pipe Earthing of Power Transformer by way of boring and loweringof “B” class G.I. pipe 50 mm. dia. into the ground up to the water level to the lower end of which a solid copper con approx 9 inches long and 750 gram in weight provided and screwed in connecting and bringing out continuous copper wire 8 SWG from the cone to the ground surface where it will be bolted to the G.I. Earth strip for Transformer neutral connection. The earth strip will be welded to the G.I. pipe. The work also includes cap and clamp for pouring water, the cost of all material with all labour and T&P etc. complete in all respect. |
142 | Errection of Chemical Pipe earthing and welding of chemical earthing with M.S Strip betwwenStructure and earthmat |
143 | Fabrication and grouting of G.I. Channel 100x50x6 mm. in L shape & in proper size and alignment to provide support for the two separate Earthingstrips for power transformer neutral including supply & fixing of two nos. flexible copper bonds for neutral Earthing. The work also includes painting of G.I. Channel with two coats of aluminium paint. |
144 | Fabrication and erection of cable support made of two pieces ofG.I. 65x65x6 mm. 3.00mtr. long, joined to each other by means of 5 Nos. M.S. flat 50x6 mm. pieces of size 150 mm. long each by welding at equal intervals as per drawing and grouting in a block of size 300x300x700 mm complete with two coats of Aluminum paint. This includes providing of four nos. G.I. clamp made of G.I. flat for holding the cable including Nuts & bolts. |
145 | PLINTH OF 10 MVA, 33/11 KV TRANSFORMERS : Construction of plinth of size 3.46x4.46 Mtr. for 10 MVA Transformers having 0.5 Mtr. below ground level and 0.4 Mtr. above ground level.The work also includes laying of 2 Nos. 3.46 Mtrs. long each rail pieces complete with cutting welding & proper fitting etc. The plinth will be made as per drawing and shall be plastered/finished on top and sides of the plinth. |
146 | PLINTH OF 250 KVA, 11/0.44 KV TRANSFORMERS : Construction of plinth of size 1.5x1.5x2 Mtr. for 250 KVA Transformers having 0.5 Mtr. below ground level and 1.5 Mtr. above ground level.The work also includes laying of 2 Nos. 1.5 Mtrs. long each channel 125x65x65 mm complete with cutting welding & proper fitting etc. The plinth will be made as per drawing and shall be plastered/finished on top and sides of the plinth. |
147 | Installation of 24 V Battery with Battery Charger Cabinet |
148 | Installation of 11 KV I/C VCB 600/300/5A, 350MVA |
149 | Installation of 11 KV O/G VCB 200/100/5A, 350MVA |
150 | Installation of Bus coupler 350 MVA |
151 | Dismentling ,Shifting & instalationCharge of 250 KVA T/F with all accessories and FRP fencingfrom132 KV Sub-Station Aurangabad Switch Yardto Plinth of New Proposed Sub-Station Aurangabad(Urban) Mathura |
152 | Dismentling ,Shifting & instalationCharge of 10 MVA T/F with all accessories a from132 KV Sub-Station Aurangabad Switch Yardto Plinth of New Proposed Sub-Station Aurangabad(Urban) Mathura |
153 | Dismentling ,Shifting & instalationCharge of 1 No. Incoming VCB and4No. O/G VCBwith all accessoriesfrom control room of Aurangabad to New Proposed Sub-Station Aurangabad(Urban) Mathura |
154 | PROVIDING FURNITURE, FIRE FIGHTINH EQUIPMENT ETC. MATERIAL AS PER SCHEDULE :- Furniture for control room (Office Chair-2 no ,Office Table -2 No. Sitting branch-1 no. Stool -2 no. Office rack-1 no made of steel) Fire Fighting equipment with stand complete. Fire extinguisher CO2 type 5.0 Kg no-1 ,Fire extinguisher CO2 type 4.5 Kg.no-1, I.S.I. mark. ,Fire Bucket stand size 1500x1200mm.-no-1, Fire bucket made ofB.P. sheet 20 gage ( conical shape ) having capacity 10 Ltr.- 10” dia -4 no., Chakkered rubbur sheet 2000x1000x10 mm. I.S.I. mark.-no-4 Boards OF S/S aking and fixing of protection Board alongwith all accessories complete made of sunmica 10 mm sheet size 45×60 Cm.-no-2 ,Supply and fixing of sub-station name board made of M.S. Angle 50×50×6 mm and S.P. Sheet of 18 SWG including painting and writing.-no-1 |
155 | SWITCH YARD LIGHTING ARRANGMENT :- stone Pade -6 No PVC Cable 2x4 SQMM -200 Mtr PVC Conduct Pipe -15 mm- 150 Mtr D.P.Switch 63 A for one way control-01 No. Rest for DI Board, D.P. Switch32A-1, D.P. Switch 16 A-1, Kit Kets-6 including wiring.-1 Job LED Light 100 W -6 No. |
156 | Erection of PCCPole 8.5 mtr. Long in Switch Yard lightening arrangment with conrecting as per resspo |
157 | Laying and dressing of 11 KV XLPE 3x300/185 Sq. mm. under ground cable in the trench as per Resspo norms. The work includes supplying of fine sandand bricks, refilling and ramming of the left out soil, closing the trench and leveling. |
158 | Laying and dressing of L T Cable, 3.5x70 Sq. mm. under ground cable in the trench as per Resspo norms. The work includes supplying of fine sandand bricks, refilling and ramming of the left out soil, closing the trench and leveling. |
159 | FIXING OF 11 KV CABLE ENDS (JOINTING KIT O/D & I/D): (A)Preparing and fixing of 11 KV, XLPE cable cut out door jointing kits after carefully removing the insulation of the cable, duly plumbing and taping of cable providing, fixing and crimping of proper size good quality lugs and complete work including cost of material such as insulating tapes, cotton tape, plumping material and lugs etc. other than jointing kits. |
160 | (B) Preparing and fixing of 11 KV XLPE cable indoor jointing kits on switch gears after care fully removing the insulation for the cable, providing, fixing and crimpling ofproper size good quality lugs , duly plumbing and taping of cable with good quality of cotton tape, empire tape, H.T. Tape and PVC tape, properly fixing of lugs on switch gears and boxer complete in all respect including cost of material such as insulating tapes, cotton tape , plumbingmaterial and lugs etc. other than jointing kits. |
161 | (C) Wearing 160 mm. dia., 3.0 mtr. long G.I. pipe on the feeder cable before mounting the cable on the double pole lifting, mounting and clamping of 11 KV feeder cable boxes on the feeder double pole structure and makingconnections including supply of cable mounting clamps. The work includes the sealing of G.I. pipes’ top end supply of G.I. pipes’ lower endof the pipe is to be buried in to the earth by about one foot. |
162 | Laying of 2 x 2.5 mm² control cable through cable trench in SGR interlinking through proper connections Transformer control panel/ Protection board/Battery & Battery Charger/buchholtz relay/ 33/11 KV Transformer junction box/ 33 KV VCB, CTs, PT etc. as per site conditions. |
163 | Laying of 4 x 2.5 mm² control cable through cable trench in SGR interlinking through proper connections Transformer control panel/ Protection board/Battery & Battery Charger/buchholtz relay/ 33/11 KV Transformer junction box/ 33 KV VCB, CTs, PT etc. as per site conditions. |
164 | OUT DOOR EARTHMAT : Laying of earth mat in the switch yard by laying of M.S. Round of 32 mm dia. in 750 mm deep trenches and grounding of earth mat with M.S. Round 32 mm. dia.,3 mtr. long earth electrodes as per drawing. The work includes welding/bolting of M.S. round, M.S. Branch Strips pad connecting all steel structures in the switch yard with the earth and connection by M.S. Flat to pipe earthing and chemical pipe earthing as per Resspo norms |
165 | INDOOR EARTHMAT : (A) Preparation of earth mat for earthing of indoor equipments by means of M.S. earth strips 50X6 mm connecting to 4 nos. earthing electrodes of 32 mm dia. (including fabrication of earthing electrodes) 3Mtr. long on both side of control room (as per RESPO drawing RES-40) This work includes driving of earth electrodes straight down into the earth so that its top remain 500 mm below ground level, earth work laying bending, welding of M.S. earth strips 50X6mm in the trench of con trol room and connection to both side squares.Earthing of all indoor equipments by providing and laying M.S. earthstrip 50X6mm including cutting, welding bending etc. |
166 | Alluminium Paint for painting of Sub-Station Structure & equipment. |
167 | RED OXIDE Paint for painting of Sub-Station Structure & equipment. |
168 | 33 KV LINE PART: 33 KV Cable Under Ground Work : Digging of Trench by excavation of earth laying of brick to cover the cable and filling of sand &earth ramming and dressing properly with complete job for laying 33 KV XLPE cablesin loop of sizes 3x300 Sq.mm. including cost of bricks, sand, clamps etc. |
169 | Laying of 33 KV, 3x300 sq.mm. XLPE Cable underground in trunches. |
170 | Laying of 33 KV, 3x300 XLPE Cable with G.I. Pipe on Double Pole Structure |
171 | Laying of 33 KV, 3x300 XLPE Cable in Air on Double Pole Structure & filling of cable joint kit with proper dressing. |
172 | Filling of 33 KV out door type heat shrinkable cable jointing kit at theend of cableby plumbing and tapping of cable. Fixing and clampling of proper size and good quality lugs, after providingover the 33 KV Power Cable as above Ground Level complete work including costof insulation tapes lugs, Pipe etc. other than jointing Kits. |
173 | Erection of 3.00 Mtr. long G.I. pipe 160-mm dia |
174 | Clamps for fixing of Cable and Cable Box |
175 | Clamps for holding of G.I PIPE |
176 | Erection of Cable Marker |
177 | Erection of Wooden Bushes |
178 | 11 KV LINE PART 11 Mtr. long S.T.P.Pole. |
179 | 13 Mtr. long S.T.P. Pole. |
180 | Stone Pad 300x300x75 mm |
181 | ‘V’ Type Cross Arm for 11 KV |
182 | Cross Arm Holding Clamp with Nut & Bolts for PCC Pole |
183 | ‘F’ Bracket with Nut & Bolts |
184 | 11 KV Pin Insulator |
185 | 11 KV Pin with N&B |
186 | 11 KV Disc Insulators T&C Type 4500 Kg. |
187 | 11 KV Disc fittings T&C Type 4500 Kg. |
188 | Sagging of A.C.S.R. DOG CONDUCTOR |
189 | Stay set Complete for 11 KV line |
190 | 11KV TPMO with fixing clamp complete |
191 | 11 KVFuseSet |
192 | 11 KV Lightning arrestor |
193 | Barbed wire |
194 | Alluminium Binding wire ( 5 mm dia ) |
195 | Painting number mark with Paint |
196 | 11 KV Danger Board with clamp & bolts |
197 | Alluminium Paint |
198 | Red Oxide |
199 | M.S. Angle 65x65x6x2700 mm Bracing Set with 8 Nos.Clamps. |
200 | Top Channel 100x50x2240 mm. |
201 | Top Channel 125x65x3200 mm. |
202 | Dropper Channel 100×50×2028 mm with clamp for cable supporting |
203 | Dropper Channel 100×50×2800 mm with clamp for cable supporting |
204 | Clamps for Top Channel with Nut & Bolts |
205 | P.G. Clamp for Dog Conductor |
206 | ‘E’ Bracket for 11 KV with Nut & Bolts |
207 | M.S Nut & Bolt with Warshers |
208 | Lug 185 sqmm |
209 | T" OFF M.S. Channel 100 x 50 x6X 1300 mm. |
210 | M.S Angle 50x50x6 1500 mm for Top Channel Support |
211 | M.S. Angle 65x65x6x3010 mm.x 2 Nos. |
212 | M.S. Angle holding clamp with nuts and bolts |
213 | Eye Bolts |
214 | G.I. wire 6 SWG |
215 | G.I. wire 8 SWG |
216 | Turn Buckle |
217 | Connecting Clamps |
218 | Assembling and installation of G.I M+6 Tower 19.3 mtr long as per drawing and approved scheduleand grouting of M+6 Tower complete in all respect. |
219 | M.S. Angle 65x65x6 mm,2028 mm. long for G.I. Pipe supporting @ 5.8 Kg/M |
220 | Copper L-Piece of size 400x50x6 mm for LT bushing Rod of transformer |
221 | LT Aluminium insulated Cable of size 1x16 Sq.mm. (for HT jumpering) |
222 | Al. crimping lugs Al. crimping lugs 35 sq.mm. |
223 | Al. crimping lugs 50 sq mm. |
224 | Al. crimping lugs 70 sq.mm. |
225 | SMC MCCB Distribution board |
226 | Errection and grouting of stay rods 1800 x 20 mm. including all works of excavation, fixing, tightening & nozzling of stay with the poles and of required tension as perrelevant drawing including back filling of earth and proper ramming. |
227 | Earthing of supports with M.S. Earth Rod 2.5 Mtr. in length including excavation of pit and driving M.S. Rod to proper depth and connecting the earth electrode with the help of G.I. Wire 8 SWG, Nuts & bolts and earthing lugs. |
228 | The Grouting and making of plinth of the support (1/6 of the full length of the supports) will be done as per norms in the CC 1:4:8 with cement, course sand and brick ballast including back filling and proper ramming.fixing of all clamps and other accessories as per relevant drawing. ii)11 Mtr. Long SP-55 poles |
229 | iii)13 Mtr. Long SP-72 poles |
230 | 11 KV Cable Under Ground Work :- Digging of Trench by excavation of earth laying of brick to cover the cable and filling of sand &earth ramming and dressing properly with complete job for laying 11KV XLPE cablesin loop of sizes 3x185 Sq.mm. including cost of bricks, sand, clamps etc. |
231 | Digging of Trench by excavation of earth laying of HDPE pipe for 11KV 3X185 sqmm XLPEcable |
232 | Laying of H.D.P.E. Pipe underground minimum 2.5 Meters below by HDD Method along with laying of 11 KV 3x185 Sq. mm. XLPE Cable in H.D.P.E. Pipe |
233 | Laying of H.D.P.E. Pipe underground minimum 1.5 Meters below by open trench method anong with laying of 11 KV, 3x185 Sq. mm. XLPE Cable in H.D.P.E. Pipe |
234 | Laying of 11 KV, 3x185sq.mm. XLPE Cable underground in trunches including cost of bricks, & sand,. |
235 | Laying of 11 KV 3x185 XLPE Cable with G.I. Pipe on Double Pole Structure |
236 | Laying of 11 KV 3x185XLPE Cable in Air on Double Pole Structure & filling of cable joint kit with proper dressing. |
237 | Filling of 11 KV out door type heat shrinkable cable jointing kit at theend of cableby plumbing and tapping of cable. Fixing and clampling of proper size and good quality lugs, over the 11 KV Power Cable as above Ground Level complete work including costof insulation tapes lugs, Pipe etc. other than jointing Kits. |
238 | Erection of Cable Marker |
239 | Erection of Wooden Bushes |
240 | G.I Pipe 160 mm Dia for Double Pole Structure |
241 | Clamps for Fixing Cable & Cable Box |
242 | Clamps for holding of G.I Pipe 160 mm |
243 | Choping of branches of Tree |
244 | Road restoration charges for pucca road crossing |
245 | Scrap dismantaling & carriage dump to Mathura to centeral store (a) 11 KV XLPE 3x300 sq.mm. cable damaged - 250 kg. (b) 11 KV XLPE 3x185 sq.mm. cable damaged - 100 kg. (c) Iron scrap- 230 kg. |
246 | Sub Total of Part-B (Erection Work) |
247 | Grand Total of (Part-A & Part-B) |
248 | Note: GST shall be paid Extra |