Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Of Material, Design, Erection, Testing, Commissioning Forshifting / Re- Routingof Various Ht/Lt Lines At Different Location To Dispose Off The Various Public Representationrecommended Through Honable Mla Nagrota Bagwan Under Ed Hpseb Ltd. Submission Date for this Tender is 03-02-2024. Electrification Work Tenders in kangra Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | COST of HT/LT line |
2 | Prov. Conductor AAAC 7/3.15 (55mm2) |
3 | Prov. Steel Tubular Pole 9 Mtr. Long |
4 | Prov. Steel Tubular Pole 8 Mtr. Long |
5 | Prov. RCC muff with concrete fiiling |
6 | Angle Iron (75x75x6) [Length- 1.50 Mtr + 0.02 Mtr] |
7 | Shackle Insulator (16 kN) |
8 | D-Iron (U- Clamps) |
9 | Prov Egg Insulator |
10 | Prov Eye Hook Bolt |
11 | LT Stay Set Provided By HPSEBL |
12 | HT Stay Set Provided By HPSEBL |
13 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set) |
14 | Prov. G.I wire 8SWG |
15 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
16 | Prov. LT AB Cable Size 3 x 95+16+70 mm² |
17 | Prov. Suspension Assembly |
18 | Prov. Façade Hook |
19 | Prov. Anchoring Assembly |
20 | Prov.X-Arm: [Channel Iron (100x50x5 mm), Length : 2800 mm X 2 Nos] for incomer line |
21 | Lightening Arrester 9KA |
22 | Prov. GO AB Switch |
23 | Pipe Earthing Set |
24 | MSAI Earth Angle (65x65x6mm) L=2800mm |
25 | Half Clamp (M.S. Flat 50X6 mm) |
26 | MSCI X-ARM 1270X100X50X6MM |
27 | Prov. A.I 750mm 50X50X6 mm |
28 | Prov. Pole top bracket 100X50X6 |
29 | Prov Pin insulator (Porcelain:12 KV, BS,90KN) |
30 | Prov 11 KV disc insulators set cleaves & tongue helically formed |
31 | Belt Set- MSAI 50X50X6 L 1800 mm x 1 No |
32 | X-Bracing St- MSAI 50X50X6 L-2125 mmx1no |
33 | X-Arm (Horizon)-MSCI 100X50X6 L-2340mmx 1 no) |
34 | Full Clamps [ 2 No for A.I + 1 No for Stay Set] |
35 | Danger plate |
36 | HT Earthing Set complete |
37 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16 mm F or more(with flat and spring washers)] |
38 | Aluminium Paint |
39 | Add Transportation charges @5% on (b) |
40 | Add Erection charges as per cost data 2022-23 for Cond. 50mm2 |
41 | Add Re-sagging of existing conductor 50mm2 |
42 | Add Erection charges as per cost data 2022-23 for Cable |
43 | Add Erection charges as per cost data 2022-23 for dtr complete str |
44 | Add Erection charges as per cost data 2022-23 for ST pole |
45 | Add Erection charges as per cost data 2022-23 for LT Stay Set |
46 | Add Erection charges as per cost data 2022-23 for HT Stay Set |
47 | Erection charges of G.I. Wire 8 SWG sq i.e string & sagging, binding with insulator |
48 | Add Erection charges of HT Earthing |
49 | Add Erection charges as per cost data 2022-23 for Jumpers |
50 | Add DismentalmentChargesof existing material & shifting of existing Dtr |
51 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |