|
| 1 | SUPPLY OF MATERIAL PORTION |
| 2 | DEAD END CLAMP WITH I HOOK ABCABLE SP-10 |
| 3 | STAY CLAMP FOR SP-10 WITH NUT & BOLT |
| 4 | SUSP.CLAMP WITH EYE HOOK ABC FOR SP-21 |
| 5 | Piercing Connector 70 Sq.mm-70Sq.mm |
| 6 | Piercing Connector 70 Sq.mm-35Sq.mm |
| 7 | PG Clamp for Neutral 50-25 mm2 |
| 8 | PG CLAMP FOR NUTRAL 35-35 SQ.MM |
| 9 | LT XLPE Cable 1x35 sqmm |
| 10 | LT AB Cable 3x70+1x50 sqmm |
| 11 | LT AB Cable 3x35+1x25 sqmm |
| 12 | LT DISTRIBUTION BOX 1 PHASE |
| 13 | LT DISTRUBITON BOX 3 PHASE |
| 14 | AL CRIMPING TYPE LUGS35 SQ.mm |
| 15 | End Cap |
| 16 | MS Half Clamp for LT Distribution Box |
| 17 | LABOUR PORTION |
| 18 | Erection Of LT Stay Set |
| 19 | Erection of Single SP-10 Pole |
| 20 | Erection of Single SP-21 Pole |
| 21 | Muffing Of Pole |
| 22 | Dismantling of LT Line 1 P 2 W (Weasel) |
| 23 | Dismantling of LT Line 2 P 3 W (Weasel) |
| 24 | Dismantling of LT Line 3 P 4 W (Weasel) |
| 25 | Painting Of SP-10 Pole |
| 26 | Painting Of SP-21/23 Pole |
| 27 | Lopping chopping of tree Branches |
| 28 | Cartage of SP-10 Pole,51-70 KM |
| 29 | Cartage of SP-21/23 Pole,71-100 KM |
| 30 | Cartage of Petty Material,71-100 KM |
| 31 | Head load cartageSP-10Pole (1-3KM) |
| 32 | Head load cartageSP-21/23Pole (0-1KM) |
| 33 | Disconnection & Reconnection of Consumer |
| 34 | Laying of LT AB Cable 3X70+1X50 sqmm |
| 35 | Laying of LT AB Cable 3X35+1X25 sqmm |
| 36 | Installation of LT DB 1 PH for LT AB cable |
| 37 | Installation of LT DB 3 PH for LT AB cable |
| 38 | Laying of 1x35 sq mm XLPE insulated Cable. |
| 39 | Head load cartage of LT ABC 3X70+1X50 sqmm |
| 40 | Head load cartage of LT ABC 3X35+1X25 sqmm |
| 41 | Back Carriage of Petty material 150-200 kms |
| 42 | Back Head load Carriage of Petty material1-3 kms |
| 43 | Installation of LT Distribution Box complete work |