| 1 | Erection/Labour Part LT Line Electrical sectionSajyao CH TO :- TS 71/2023-24 |
| 2 | Erection of LT 8 Meter Steel tubular polewith RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 3 | Erection of stay set LT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 4 | Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying ofConductor, stringing & sagging, binding with insulator complete in all respects. |
| 5 | AAAC cond.Erection of LT line with ACSR Conductor(50 mm2) such as stringing, tensioning and sagging,jointing andfastening . |
| 6 | Transportation andMannual carriage for complete Material of L T line from road side to site of work |
| 7 | Supply Part LT Line Sajyao CH TO :- TS 71/2023-24 |
| 8 | Muffs with concerete filling (1800 mm) |
| 9 | Shackle Insulator (16 KN) |
| 10 | D-Iron (U- Clamps) |
| 11 | Earth Knob |
| 12 | Full Clamp |
| 13 | LT Stay set |
| 14 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 15 | Angle Iron (75*75*6) (Length-1.50 Mtr +0.2 Mtr) |
| 16 | Aluminium Paint |
| 17 | Red Oxide |
| 18 | Spiral PVC Spacer |
| 19 | Kit Kat IC |
| 20 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set |
| 21 | Barbed Wire |
| 22 | Nuts and Bolts off Size |
| 23 | Erection/Labour Part LT Line GadidharCH TO :- TS 70/2023-24 |
| 24 | Erection of LT 9 Meter Steel tubular polewith RCC muff Including digging of pit of size 1.10x0.75x1.50, drilling of holes in poles, X-bracing set, X-arms, Fixing of insulators, X-arms, X- bracing set, fixing of barbed wire, Danger plate, filling of pit & ramming and painting of pole complete in all respects(C.C. 1:3:6 for muffing will be provided by the contractor). |
| 25 | Erection of stay set LT line, comprising digging of pit, fixing of stay rod, filling of pit, Nozzeling and tightining complete in all respects. |
| 26 | Sagging of conductor 1 KM single GI wire, AAAC cond., comprising laying ofConductor, stringing & sagging, binding with insulator complete in all respects. |
| 27 | AAAC cond.Erection of LT line with ACSR Conductor(50 mm2) such as stringing, tensioning and sagging,jointing andfastening . |
| 28 | Transportation and Mannual carriage for complete Material of L T line from road side to site of work(LS) |
| 29 | Supply Part LT Line Gadidhar CH TO :- TS 70/2023-24 |
| 30 | Muffs with concerete filling (1800 mm) |
| 31 | Shackle Insulator (16 KN) |
| 32 | D-Iron (U- Clamps) |
| 33 | Earth Knob |
| 34 | Full Clamp |
| 35 | LT Stay set |
| 36 | Earth wire (GI, 8 SWG) {Additional 1% (Sag and wastage)} @ 0.102 kg/m |
| 37 | Angle Iron (75*75*6) (Length-1.50 Mtr +0.2 Mtr) |
| 38 | Aluminium Paint |
| 39 | Red Oxide |
| 40 | Spiral PVC Spacer |
| 41 | Stay Wire (7/3.15 mm) (6.0 kg Per Stay Set |
| 42 | Barbed Wire |