}

Tender For Capital Shutdown Rhf-1&2 Refectory Work At Hsm Plant, Hazira-Gujarat

Arcelor Mittal Nippon Steel India Limited has published Tender For Capital Shutdown Rhf-1&2 Refectory Work At Hsm Plant. Submission Date for this Tender is 31-01-2024. Hand Glove Tenders in Hazira Gujarat. Bidders can get complete Tender details and download the document.




Tender Notice

41854653
Tender For Capital Shutdown Rhf-1&2 Refectory Work At Hsm Plant
Open Tender
Indian
Gujarat
Hazira
31-01-2024

Tender Details

Tender For Capital Shutdown Rhf-1&2 Refectory Work At Hsm Plant 1 2000146459 20 10 10 REFRACTORY WORK- BRICKS, CASTABLE 2,200 TO Email : sanjay.parihar@amns.in Contact : Name : Sanjay Parihar Item Details : Date of Shutdown - 15 April 2024 (Exact date to be confirmed) Duration of Shutdown - 25 Days as of now. (Working days inside RHF ~ 18 days) Total estimated refractory work and other associated work for 2 furnaces SR.NO. DESCRIPTION QTY UNIT 1 Refractory dismantling, brick lining <(>&<)> casting with Ceramic/Hysil board fixing along with anchor welding for refractory inst allation. 2200 (± 10%) M.T Major Refractory Job. (For two Furnaces) Tentative quantity • Opening and closing of access door – 30 MT • Side wall dismantling <(>&<)> brick lining at height (5.5mtr). – 530 MT • Separation wall and discharge wall – 140 MT • Dismantling burner castable and casting new. – 120 MT • Precast block fixing or Castable chappai at skid and post. - 50 MT • Arch and wedge brick relining. - 100 MT • Damaged Roof block fixing. – 200 MT • Bull nose bricks relining. – 100 MT • Hearth block and brick relining at damage places. – 690 MT • Down take arch relining. – 60 MT • Gamma and Thermocouple temple block replacement. – 20 MT • Skid shuttering and refractory casting along with post PCPF block. – 150 MT • Any other during inspection from inside while shutdown. – 40 MT Terms and conditions to be adhered to SCOPE OF WORK FOR REFRACTORY CONTRACTOR Safety – 1. Safety of each manpower coming for job need to be ensured by Contractor. 2. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 3. Vendor must ensure availability of sufficient buses/vehicles to ply their associates inside plant premises. Vendors to ensure safe transportation of their associates from their place of residence to respective work location in the plant and back. The movement of persons inside the plant by foot/bicycle/two wheelers is prohibited. 4. Associate must undergo Medical Fitness at our Care Nursing Home, AM/NS Township, Hazira. This would be done as per AM/NS India standards and the cost shall be borne by the vendor. AMNS has its own Secures Access system called SCRUM at Hazira Site which is use for processing the Gate Pass. 5. Compliance of all the statutory requirements. 6. Safety officer round the clock for effective safety measure implementation. 7. All safety appliances (PPE) like helmet, dust mask, safety shoes, safety goggles, safety belt, jacket, earplug, hand gloves, fall arrester if required will be in the scope of contractor. Without approval 2 2000146459 30 20 10 REFRACTORY WORK- BRICKS, CASTABLE 50 TO Email : sanjay.parihar@amns.in Contact : Name : Sanjay Parihar Item Details : Date of Shutdown -15th April 2024 (Tentative)- Duration of shutdown -Working days at Slabyard ~ 10 days SR.NO. DESCRIPTION QTY UNIT 1 Refractory work 50 (± 10%) M.T Major Refractory Job. • Removing old damaged hearth bricks/castables from yard and lining new bricks along with refractory castable packing wherever required. Terms and conditions to be adhered to SCOPE OF WORK FOR REFRACTORY CONTRACTOR Safety – 1. Safety of each manpower coming for job need to be ensured by Contractor. 2. No Pedestrian/Cycles/Two Wheelers movement will be allowed inside the Plant Premises. 3. Vendor must ensure availability of sufficient buses/vehicles to ply 3 2000146459 40 30 10 HOT INSULATION WITH ALU.CLADDING 1,100 M2 Email : sanjay.parihar@amns.in Contact : Name : Sanjay Parihar Item Details : Date of Shutdown - 15 April 2024 (Exact date to be confirmed) Duration of Shutdown - 25 Days as of now. (Working days at RHF ~ 18 days) Total estimated cladding work for 2 furnaces. SR.NO. DESCRIPTION QTY UNIT 1 Aluminum cladding <(>&<)> insulation /LRB/mesh work for recuperator bundles, burner body and hot air line. 1100 (± 10%) M2 Major Refractory Job. (For two Furnaces) Tentative quantity • Aluminum cladding <(>&<)> insulation/LRB/mesh work for recuperator bundles – 600m2 • Aluminum cladding <(>&<)> insulation /LRB/mesh work for burner body – 200 m2 • Aluminum cladding <(>&<)> insulation /LRB/mesh work for hot air line. – 300 m2 • Old Aluminum cladding <(>&<)> insulation /LRB/mesh to be removed and to be fixed with the new one. Terms and conditions to be adhered to SCOPE OF WORK FOR SERVICE CONTRACTOR

Key Value

Document Fees
Refer document
EMD
Refer document
Tender Value
Refer document
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail