|
| 1 | NS Item:-Operation and Maintenance of 18.24 MLD, 39 MLD STP and 32.24 MLD Capacity TTP Sector-20, Panchkula for Six years including Defect Liability Period of 12 Months, Excluding Ferric Chloride, Alum, Lime, Polyelectrolyte for Flocculation and Centrifuge, Chlorine during Operation Maintenance Period for 2nd year. (1st Year free of cost) |
| 2 | NS Item:-Operation and Mtc. of 18.24 MLD, 39 MLD STP and 32.24 MLD Capacity TTP Sector-20, Panchkula for Six years including Defect Liability Period of 12 Months, Excluding Ferric Chloride, Alum, Lime, Polyelectrolyte for Flocculation and Centrifuge, Chlorine during Operation Maintenance Period for 3rd Year |
| 3 | NS Item:-Operation and Mtc. of 18.24 MLD, 39 MLD STP and 32.24 MLD Capacity TTP Sector-20, Panchkula for Six years including Defect Liability Period of 12 Months, Excluding Ferric Chloride, Alum, Lime, Polyelectrolyte for Flocculation and Centrifuge, Chlorine during Operation Maintenance Period for 4th Year |
| 4 | NS Item:-Operation and Mtc. of 18.24 MLD, 39 MLD STP and 32.24 MLD Capacity TTP Sector-20, Panchkula for Six years including Defect Liability Period of 12 Months, Excluding Ferric Chloride, Alum, Lime, Polyelectrolytefor Flocculation and Centrifuge, Chlorine duringOperation Maintenance Period for 5th Year |
| 5 | NS Item:-Operation and Mtc. of 18.24 MLD STP and 39 MLD STP and 32.24 MLD Capacity TTP Sector-20, Panchkula for Six years including Defect Liability Period of 12 Months, Excluding Ferric Chloride, Alum, Lime, Polyelectrolyte for Flocculation and Centrifuge, Chlorine during Operation Maintenance Period for6th Year |
| 6 | NS Item:-Design, Construction, Renovation and Up gradation of Existing Sewage Treatment Plant (STP) based onActivated Sludge Process Technology (ASP) Comprising as hereunder :- Existing 18.24 MLD STP in Phase – I, at Sector- 20 Panchkula and Design, Construction, Renovation and Up gradation of entire Civil work of Existing Sewage Treatment Plant based on Activated Sludge Process (ASP) for 18.24 MLD STP in Phase – Ifor MPS Extension, Electrical Panel Room Extension, ElectricalPanel Room Repair, Minimum size of Proposed Detritus Chamber, Converted Anoxic Chamber, Minimum size of Inlet Channel and Minimum size of Internal Recirculation Sump, Bio Genset Building 400M^2, Platforms at Sector – 20, Panchkula and Design, Construction, Renovation and Up gradation of allMechanical, Electrical and Instrumentation of existing Sewage Treatment Plant based on Activated Sludge Process (ASP) for 18.24 MLD STP in Phase – I for Proposed Coarse Screen, Proposed Raw Sewage Pumping Machinery, Proposed Dewatering pump, Proposed Fine Screen, Proposed Primary Clarifier Mechanism, Proposed Mixer in converted Anoxic chamber, Proposed Aspirator with Internal Recirculation pump in Existing Aeration Tank, Proposed Secondary Clarifier Mechanism and Proposed Return Activated Surplus Lifting Pump in Existing Biological Sump at Sector – 20, Panchkula. (as per NIT or design whichever is more). |
| 7 | NS Item:-Design, Construction, Renovation and Up gradation of Existing Sewage Treatment Plant (STP) based onActivated Sludge Process Technology (ASP) Comprising as hereunder :- Existing 39 MLD STP in Phase – II with Nitrification, De-nitrification disinfection, Anaerobic removal of Phosphate Digester, Power Generation, at Sector – 20, Panchkula and Design, Construction, Renovation and Up gradation of entire Civil work for existing Sewage Treatment Plant based on Activated Sludge Process (ASP) for Existing 39 MLD STP in Phase – II with Nitrification, De-nitrification removal of Phosphate for Repair Chemical cum Annexe building, Repair Centrifuge Building, Repair Chlorination Room, Repair Tonner Room, Repair Recycling pump house including Panel Room, Repair Staff Quarter, Repair Guard Room, Platform, Minimum size of Proposed Detritus Chamber, Minimum size of Proposed Anoxic Chamber, Minimum size of Proposed Inlet Channel, Minimum size of Proposed Internal Recirculation Sump, Minimum size of Proposed Thickener Sump, at Sector -20, Panchkula and Design, Construction, Renovation and Up gradation of Mechanical, Electrical and Instrumentation of existing Sewage Treatment Plant based on Activated Sludge Process (ASP) for Existing 39 MLD STP in Phase – II with Nitrification, De-nitrification for Mechanical FineScreen, Air Blower, Internal Recirculation Pump, Return Activated Surplus Lifting Pump, AnaerobicDigester, Bio, Genset including (Engine Plus Alternator for Power Generation as per DNIT) 400 KW at Sector 20, Panchkula (as per NIT or design whichever is more). |
| 8 | NS Item:-Design, Construction, Renovation and Up gradation of Existing Sewage Treatment Plant (STP) based on Activated Sludge Process Technology (ASP)Comprising as hereunder :- Design and construction of Tertiary Treatment of32.24 MLD capacity in Phase – III, at Sector- 20 Panchkula. Design and Construction of entire Civil work for Tertiary Treatment of 32.24 MLD capacity in Phase – III for Receiving Chamber, Flash Mixer , Polyelectrolyte Tank, Lime Tank , Ferric Chloride Tank, Flocculator, Tube Settler, Distribution Chamber, Outlet Channel, Rapid Gravity Filters, Operation Gallery, Backwash Tank etc. at Sector – 20, Panchkula and Design and construction of Mechanical, Electrical and Instrumentation work for Proposed Tertiary Treatment of 32.24 MLD capacity in Phase – III for Treated Effluent Lifting Pump, Agitator for Polyelectrolyte Lime, Ferric Chloride, Backwash Lifting Pump, Air Blower, Tonners, Post Chlorination, External Lighting, etc. at Sector- 20 Panchkula (as per NIT or design whichever is more) and Design, Engineering, Procurement, Construction, of Suitable capacity generators (4 Nos.) for 100% operation TTP operation in case of power failure (as per required load) and Design, Engineering, Procurement, Construction, ofSuitable capacity Transformer (2 Nos.) for 100%operation TTP operation in case of power failure (as per required load). |
| 9 | NS Item:-Const. of Electric Panel Room for 32.24 MLD TTP |
| 10 | NS Item:-Const. of Road 3.75 Mtr. wide for 32.24 MLD TTP |
| 11 | NS Item:-Const. of Plat Form for 32.24 MLD TTP |
| 12 | NS Item:-Const. of Chemical and Dosing Room for 32.24 MLD TTP |
| 13 | NS Item:- Const. of Filter House for 32.24 MLD |
| 14 | NS Item:-Construction of Administrative / Annexe Building (Double Story) and Chlorination Room with Toner Shed. |
| 15 | NS Item:-Const. of Staff Quarter for 32.24 MLD TTP |