|
| 1 | Earth work excavation for foundation and depositing on bank with in the initial lead of 10m and a lift of 2m in hard stiff clay, stiff block cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders etc. complete. complying with std. specifications.SS 20 B |
| 2 | Supply of 140mmPN 10 HDPE Pipe including all cost and conveyance of material and labour charges etc complete |
| 3 | Jointing HDPE Pipes and Specials by butt fusionwelding / electro fusion welding joints usingfusion equipment as per ISO 21307-2011 and asper IS 7634 (part-2) : 2012 including cost of hirecharges for butt fusion equipment power supplyarrangements etc., complete |
| 4 | Lowering HDPE pipes and specials to trench andlaying to proper grade and alignment and asdirected by theOfficers |
| 5 | Refilling with excavated earth other than sandincluding all cost and conveyance of material and labour charges etc complete |
| 6 | Supply of 20H.P 3 phase submersible pumpset suitable for openwell with ISI mark IS 8034 without Panel board with 2000LPM x 100mts Head including cost and conveyance of all other labour and material charges to site etc., complete complying with standard specifications. |
| 7 | Supply of 20H.P 3 Phase ISI Panel board - Star Delta with Two level Guard and Auto Start, the Panel board should be provided as per spcification given in Board circular No: 23/DCE/QATA/2004 Dt.23.08.2004 including cost and conveyance of all labour charges. |
| 8 | Supply of PVC insulated and sheathed 3 core 4 Square mm flat type copper cable conforming to IS 694/1990 including cost and conveyance of all other labour and material charges to site etc., complete complying with standard specifications. |
| 9 | Supply of150 mm GI pipe including cost and conveyance of all other labour and material charges to site etc., complete complying with standard specifications. |
| 10 | Towards labour charges for the erection of submersible pumpset in borewell including fixing and jointing submersible cable withproper clamps upto the starter to required dpth and also fixing of riser pipes to the required depth valves erection clamps, pressure gauges upto the exterior wall of pump room and erection of panel board consisting of TPICN switches starter, voltmeter, Ammeter, three pilot (incating) lamps capacitor single phasing preventor, water level guard and laying and jointing the cables and twin earthing as per IE rules etc., complete and testing the pimpset and trial run for 10 days. |
| 11 | Laying of G.I.Pipes and specials to proper line and level including jointing but excluding cost of pipes and jointing materials for plumbing works for providing water supply(150mm) |
| 12 | Supply and delivery of Cast Iron doubleAir valveincluding specials as per IS 14845/2000 PN 1.0 with ISI marking and with 5 years warranty suitable for use in water supply main including, loading, freight, unloading insuranceall taxes and stocking at site. including cost of Specials and all the incidental charges etc., complete and as directed by Departmental officers. (150 mm) |
| 13 | CI SLUICE VALVES NON RAISING SPINDLE TYPES TO PRESSURE RATING OF 1.6 PN TO BE USED IN PUMP HOUSES (LONG BODY/ LONG FACE TO FACE)Conforming to IS AND WITH 5 YEARS WARRANTY (150mm) |