| 1 | Providing and fixing 25 mm X 3 mm copper strip on surface or in recess for connections etc. as required. (Laying from Earth pit to Generator Body & earth pit to Neutral (20 mtrs copper strip required for each earth laying on surface) |
| 2 | Earthing with copper earth plate 600 mm X 600 mm X 3 mm thick including accessories, and providing masonry enclosure with cover plate having locking arrangement and watering pipe of 2.7 metre long etc. with charcoal / coke and salt as required.( 2 Nos. earthBody of each Generator and 2 Nos. for common Neutral of 2 Generators) |
| 3 | Providing and fixing Earth bus of 50mm x 533 copper strip on surface for connections etc. as required |
| 4 | Laying of one number PVC insulated and PVC sheathed / XLPE power cable of 1.1KV grade for the following size direct in ground including excavation, sand cushioning, protective covering and refilling the trench as required |
| 5 | Upto 35 Sq.mm |
| 6 | Supplying and making cable route marker with 10cm x 10cm x 5mm thick GI plate with inscription there on, bolted / welded to 35x35x6mm angle, 60cm long and fixing the same in ground as required |
| 7 | ( Refer Sl.No:4 for installation) Supply of 4 core x 6 Sq.mm copper conductor Armored UG cable laying from power house to IQ |
| 8 | (Refer Sl.No:11 for installation) Supply of 25 Sq.mm flexible copper conductor PVC Insulated Cables, Unsheathed with Rigid Conductor conformingIS:694:2010 latest. Laying 4 run fromMeterboard to Distribution panel, distriburion Panel to Generator1 and 2, and Generator 1 &2to Distribution Panel |
| 9 | Supply of Electrical insulation rubber mat ISI as floor covering for the protection of workers on AC and DC installations with the system voltages up to 66 kV AC and 240 V DC and as per confirming Indian stamdard IS15652 latest 1000mm width x 2000 mm length. (3 Nos. =6 Mtrs) |
| 10 | Supply and laying of 2\" (63mm) PVC pipe of 10Kg confirming IS4985-2000 for laying from Meterboard to Distribution panel, distriburion Panel to Generator1 and 2, and Generator 1 &2to Distribution Panel with SuitableSS clamps and screws(for laying 25Sq.mm flexible copper) |
| 11 | Laying of 25 sq.mm copper cable in (63mm) PVC pipe from Meterboard to Distribution panel, distriburion Panel to Generator1 and 2, and Generator 1 &2to Distribution Panel(4 run in 63mm PVC pipe) |
| 12 | Supply of 160A floor mounted type distribution Panel size Length: 1676mm, Height:1982mm, Depth:250mm, made up of 16 gauge CRCA sheet fully powder coatedSiemens Colour for 3 phase 4 wire system comprising of surge protective device 3P+N / imax 100KA, 25mmX12mm Aluminium Bar for phase and neutral and 25X6mm Aluminium For Earth of the panel board. Incoming : 100A/4 pole MCCB for Mains, 250A/ 4 pole ON load change over Switch 3 Nos for Generator, SDF, Metering : R,Y,B Indicators : 2 Set , Multi function meter VAF Meter : 1 No, Outgoing : 32A 4 Pole MCB: 9 Nos, 32A/ 2 Pole MCB : 18 Nos. suitable for conjenction with 2 Nos. 40KVA Gen set |
| 13 | Refer Sl. No.12 Erectioninstallation, testing and commissioning charges 160A floor mounted type distribution panel with making foundation on base, (Civil Masonry work for construction of trench suitable for new panel, where ever necessary), incoming termionation from mains, Generator cable connections, glanding,earthing to panel, load connects etc complete. |
| 14 | Refer Sl No.2 (for plate earthing) is used to make additional earth pit charges. The site is located in sea area difficult to digging for earth pit due the water coming with in 4 feet. Removing water, sand etc |
| 15 | Refer Sl No.4(for laying UG Cable) is used to make additional charges for excavation of earth for laying UG Cable due to site ids located in sea area. Removind, water ect |
| 16 | Supply and installatioin of 3 Phase, 415V,15KVA Air Cooled floor mounted type, fully copper servo controlledautomatic voltage stabilizer. Suitable for Lift. Refer 6.2 (h) for technical specifications. |
| 17 | Breaking th floor for making trench, making hole on stone wall where ever required for taking copper tape/ cable as required according to site conditions. |
| 18 | Dismantling and removing of old AMF Panel and distribution panelby disconnectind from supply and load connections, temporary supply arrangements for Main light, and DGNSS equipment during erection of new panel. |
| 19 | Supplying and making end termination with brass compression gland and copper lugs for 25sqmm PVC insulatded copper conductor cablefor Generator 1, Generator 2, as required |
| 20 | Supply and laying of Cat6 Ethernet Cable,(High Speed 550MHZ / 10 Gigabit Speed UTP LAN Cable,Network Cable, RJ45 Cable LAN Wire) through 3/4\" Heavy duty PVC pipe on recess or surface from Generator 1 and Generator 2 to nearby Router for monitoring the 2 Generator parameters such as, diesel level, voltage/ current/ load/running hours etcin remote / mobile /Desk top/etc. |
| 21 | Miscellaneous items for the purchase of foundation bolts, SS Bolts & nuts, sleeves, insulation tape, flexible hose, SS clamps, PVC grips, copper lugs soldering etc |