| 1 | CAMC for Automation UPS for one year |
| 2 | First Time External Painting of Mild Steel Cone Roof Vertical Tanks and Floating Roof Vertical Tanks - Zone \"B\"LocationsSurface to be Painted: Item includes providing and painting of:i) External side surface of tank shell, Upper side surface of Cone roof of tank and upper deck of Floating Roof of Floating Roof Tanks.ii) All the Steel structures attached to the tank i.e. spiral stair case with its gratings, hand rail, mid and top landing platforms of spiralstair case, top railing, wind girders, rolling ladder etc.iii) All nozzles and appurtenances on tank shell and roof.iv) Painting and writing on tank shell Indian Oil Logo as per IOCL Specifications, writing technical details of the tank on the shell manholecover plate or at a place on tank shell as directed by the Engineer-In-Charge.v) Bands of speciified height and colour on the tank shell as per Standard Specifications of IOCL as directed by Engineer-in-Charge.vi) Mode of Measurement: For the purpose of payment, surface area will be measured in respect of tank shell plates and roof platesonly. Cost of Painting of item as per ii), iii), iv) and v) above shall be considered and loaded by the contractor in Rate in Rate per M² ofmeasurable area of plates. No extra payment shall be given for the items ii), iii), iv) and v) abovePainting System:Surface Preparation, Painting & Provision of Scaffolding: The item includes designing, providing and erecting cylindrical type(Double scaffolding of steel pipes) around the tank with all Safety Features for safe working. Providing all equipments, materials, fuels,Lube oils, Copper Slag, skilled /unskilled manpower etc. for Blast Cleaning the steel surface and carry out Blast cleaning to SA 2½. Theitem includes:a) Supply and application of two Coats of Primer P3, Red Oxide Zinc Phosphate Primer of DFT 30-35 Microns each coat +b) Subsequent supply and application of Two Coats of Finish Paint F2, Aluminium Finish Paint of DFT 15-20 Microns/coat. If required,the item also includes painting finish coat/(s) in Camouflaging Pattern at Strategic Locations as per pattern/design advised by IOCL at noextra cost. Synthetic enamel to be used for camouflaging purpose over final coat of finish paint as above.Total Minimum Dry Film Thickness of 90 Microns |
| 3 | Re-Painting of Inside surface of Mild Steel Double Deck compartments of Floating Roof Vertical Tanks when tank is empty. Zone \"B\"LocationsSurface to be Painted: Item includes providing and painting of:i) Complete Internal surfaces of all the Compartments in the Double Deck Floating Roof.ii) Internal surfaces of all the manholes of every compartment.Painting System:Surface Preparation & Painting: Providing all materials, equipments, accessories skilled and unskilled manpower to Clean steel surface bypower tool etc. conforming to to ST-3. Item includes:a) Supply and application of one coat of Primer P2, Polyamide cured epoxy Zinc Phosphate Primer of DFT 70-75 Microns each coatTotal Dry Film Thickness 70 Microns |
| 4 | Internal Re-Painting of Mild Steel Floating Roof Vertical Tanks - Zone \"B\" LocationsSurface to be Painted: Item includes providing and painting of:i) Upper side surface of tank bottom plates, Inner side surface of tank shell plates up to top of tank, Under side surface of LowerDeck of Floating Roof, Outside surface of outer Rim of Floating Roofii) All the Steel structures inside the tank, outer surface of all the pipes, which are supporting the floating roof and including anyother steel structure/(s).iii) Internal surface of all the nozzles/manholes projecting out of tank shell.iv) Mode of Measurement: For the purpose of payment, surface area will be measured in respect of tank bottom plates, shell plates,rim plates and roof plates only. Cost of Painting of item as per ii) and iii) above shall be considered and loaded by the contractor inRate per M² of measurable area of plates. No extra payment shall be given for the items ii) and iii) above(vii) In case of touch-up painting i.e. where over-all painting area is less than 150 M2 in a tank, scaffolding shall be paid extra as actualand also painting of tank appertunenances shall be paid as per actual measurement.Painting System:Surface Preparation, Painting & Provision of Scaffolding: The item includes designing, providing and erecting cylindrical type(Double scaffolding of steel pipes) inside the tank with all Safety Features for safe working. Providing all equipments, materials, fuels,Lube oils, Copper Slag, skilled /unskilled manpower etc. for Blast Cleaning the steel surface and carry out Blast cleaning to SA 2½. Theitem includes:a) Supply and application of one Coat of Primer P1, Zinc Ethyl Silicate Primer of DFT 65 – 75 Micronsb) Followed by supply and application of one Coats of primer P5, Epoxy Zinc Phosphate Primer of DFT 35-40 Microns.c) Followed by supply and application of two Coats of finish paint F3, Amine adduct cured HB Epoxy Liner of DFT 100-125 Microns each |
| 5 | Re-Painting of other Non-galvanized Steel Structures in Oil Depot/Terminal : Zone \"B\" LocationsSurface to be painted includes: Painting of following Steel Structures up to a height of 10.0 metres.i) Steel Structureswith its gratings in Tank Lorry Filling Sheds for Petroleum Products.ii) Steel Structures with its gratings etc. in cross overs/small bridges over above ground pipelines, pipeline manifolds adjoining to thepetroleum products pump house.iii) Steel Structures with its gratings in Flood Light Poles, Watch TowersPainting system:Surface Preparation & Painting of First coat of Primer: Providing all materials, equipments, accessories skilled and unskilled manpowerto Clean steel surface conforming to ST-2, Hand Cleaning, Wire Brush. For painting of Steel Structures in vertical position up to a heightof 10.0 metres, item also includes designing and providing suitable scaffolding with all Safety Features for safe working. The itemincludes:a) Supply and application of one Coat of Primer P3, Red oxide Zinc Phosphate Primer of DFT 30-35 Micronsb) Followed by supply and application of Two Coats of Synthetic Enamel Finish paint of DFT 20 – 25 Microns.Total Minimum Dry Film Thickness 70 Microns |