Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Ofmaterial, Design, Erection, Testing, Commissioning Forproviding Sop To Lwss Chadhiar Khas & Multi Villages For Baijnath,Lambagaon & Panchrukhi Block Uesd Chadhiar Under Ed Baijnath. ( Seop-55/2023-24. Submission Date for this Tender is 30-01-2024. Electrification Work Tenders in kangra Himachal Pradesh. Bidders can get complete Tender details and download the document.
Sl. No. | Item Description |
1 | COST 400 (S/Stn) |
2 | 11/0.4kV DISTRIBUTION TRANSFORMER 400KVA |
3 | S/T POLE 9MTR.W/L200KG |
4 | MUFF complete in all respect |
5 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] forincomer line |
6 | MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA"s |
7 | X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch |
8 | Transformer Bed, Belting & Knee Bracing |
9 | TransformerBed Civil work |
10 | X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer bed |
11 | X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer] |
12 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
13 | MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos |
14 | MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing |
15 | Transformer LT Distribution Box and GO Switch fixing Assembly |
16 | MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos |
17 | MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos |
18 | GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length 460mm |
19 | GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type Provided by HPSEBL |
20 | D.O Fuse Unit |
21 | Surge Arrester, 9 kV Station Class (Porcelain Type) |
22 | Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90KN)including Dead End Clamps etc. |
23 | Stay set completeProvided by HPSEBL |
24 | Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)Provided by HPSEBL |
25 | Pipe Earthing Set |
26 | With ACB(630A, 50KA,4P, 1No) & SFU(100A,6No, rewirable) |
27 | Half Clamp (M.S. Flat 50X6 mm) |
28 | Full Clamps (M.S. Flat 50X6 mm) |
29 | Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm F or more (with flat and spring washers)] |
30 | Aluminium Thimble |
31 | Aluminium Thimble |
32 | Danger Plate |
33 | Barbed Wire |
34 | Chain linkfencing angleirongate etc for transformerfencing |
35 | LT Cable (3.5 Core) 400 mm² |
36 | L.T cable 3.5 core 70 mm |
37 | Energy Meter (3-Phase, 4-Wire) DLMS compliant 600 A CT Type for 400KVA Transformer |
38 | Aluminium Paint. |
39 | Red Oxide |
40 | CT PT unit |
41 | Civil Work complete in all respect |
42 | Erection Charges |
43 | Transportation charges |
44 | 11 KV HT LINE |
45 | Conductor ( AAAC)7/4 .26 mm2 |
46 | ST Pole 11Mtr. Long W/L 200 kg |
47 | ST Pole 9 Mtr. Long W/L 200 kg |
48 | ST13 Mtr long pole |
49 | RCC Muff of 2000 mm length |
50 | A.I. Knee Bracing Set 2X(750X50X50) mmsingle Pole |
51 | C.I./ F.G. X-Arm (1500X100X50) mmfor single Pole |
52 | C.I. X-Arm for Double Pole Structure(2400X100X50) mm |
53 | A.I. Bracing Set for Double Pole structure(1500X50X50) mm & (2700X50X50) mm. each 2No. Per set |
54 | 11 kV Pin Insulator with Pin Helically formed fitting |
55 | Disc insulator set (Cleaves and Tong) |
56 | HT Stay Set complete including Provided by HPSEBL |
57 | Guy Assembly |
58 | Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set)Provided by HPSEBL |
59 | Coil Earthing for PCC / Steel Pole |
60 | Danger Plate(250X200X1.6 mm) |
61 | Earth Wire 8 SWG GI Wire for PCC/ Steel Pole |
62 | M.S. Nuts and Bolts (Off Sizes) |
63 | Barbed Wire |
64 | Aluminium Paint |
65 | GO Switch complete |
66 | DO fuses set complete |
67 | C.I. X-Arm 2400x75x40mm for GO Switch & DO Fuse |
68 | Half Clamp |
69 | Full Clamp |
70 | 12KV, 1250 Amp 12.5KA for 2 Sec ) outdoor Kiosk breaker switch panel |
71 | Errection Charges of 13 Mtr Pole |
72 | Errection Charges of 11 Mtr Pole |
73 | Errection Charges of 9 Mtr Pole |
74 | Erection Charges 7/4.26 100mm |
75 | Dismantling charges for removal of conductor De- stringing, and rolling of conductor |
76 | Errection charges of stay set |
77 | Errection charges of Earthing |
78 | Errection charges of GI wire |
79 | Errection charges of VCB |
80 | Errection charges of G.O Switch |
81 | Dis-mantling charges for removal of RCC Pole |
82 | Transport charges |
83 | 3-ph LT line |
84 | AAAC Conductor 7/3.15mm 50mm2 |
85 | S/T Pole 8 Mtr. W/L 140 kg |
86 | RCC Muff |
87 | C.I.X.Arm (600X75X40) mm |
88 | Shackle Insulator |
89 | D-Iron. |
90 | X-Arm Clamp |
91 | EggInsulator |
92 | Eye Hook Bolt |
93 | LT Stay SetProvided by HPSEBL |
94 | Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set)Provided by HPSEBL |
95 | Coil Earthing |
96 | G.IWire 8 SWG for Earthwire (1.03 km) |
97 | M.S. Nuts and Bolts (Off Sizes) |
98 | Aluminium Paint |
99 | PVC Spacer |
100 | TPT. CHARGES |
101 | ERECTIONFOR ST POLE 8MTR LONG |
102 | ERECTIONFOR AAAC 7/3.15 50MM |
103 | ERECTIONFOR STAY SET |
104 | ERECTIONFOR ERTHING |
105 | Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site. |
Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy
For Tender Information Services Visit : TenderDetail