Tender For Supply Ofmaterial, Design, Erection, Testing, Commissioning Forproviding Sop To Lwss Chadhiar Khas & Multi Villages For Baijnath,Lambagaon & Panchrukhi Block Uesd Chadhiar Under Ed Baijnath. ( Seop-55/2023-24, kangra-Himachal Pradesh

Himachal Pradesh State Electricity Board-HPSEB has published Tender For Supply Ofmaterial, Design, Erection, Testing, Commissioning Forproviding Sop To Lwss Chadhiar Khas & Multi Villages For Baijnath,Lambagaon & Panchrukhi Block Uesd Chadhiar Under Ed Baijnath. ( Seop-55/2023-24. Submission Date for this Tender is 30-01-2024. Electrification Work Tenders in kangra Himachal Pradesh. Bidders can get complete Tender details and download the document.




Tender Notice

41823086
Tender For Supply Ofmaterial, Design, Erection, Testing, Commissioning Forproviding Sop To Lwss Chadhiar Khas & Multi Villages For Baijnath,Lambagaon & Panchrukhi Block Uesd Chadhiar Under Ed Baijnath. ( Seop-55/2023-24
Open Tender
Indian
Himachal Pradesh
kangra
30-01-2024

Tender Details

Tender For Supply Ofmaterial, Design, Erection, Testing, Commissioning Forproviding Sop To Lwss Chadhiar Khas & Multi Villages For Baijnath, Lambagaon & Panchrukhi Block Uesd Chadhiar Under Ed Baijnath. ( Seop-55 / 2023-24-Cost 400 ( S / Stn ) 2 11 / 0.4Kv Distribution Transformer 400Kva 3 S / T Pole 9Mtr.W / L200kg 4 Muff Complete In All Respect 5 X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] Forincomer Line 6 Ms Angle Iron ( 50X50x6 Mm ) , Length: ( 2800 Mm ) X1 Nos For LaS 7 X-Arm: [ Channel Iron ( 75X40x6 Mm ) , Length : ( 2800 Mm X 4 Nos ] Forsupporting Do Fuse Unit & Go Switch 8 Transformer Bed, Belting & Knee Bracing 9 Transformerbed Civil Work 10 X-Arm: [ Channel Iron ( 100X50x6 Mm ) , Length : 2800 Mm X 2 Nos ] For Transformer Bed 11 X-Arm [ Channel Iron ( 100X50x6 Mm ) , Length : ( 460 Mm ) X 2 Nos Forsupporting Main Channel Of Transformer ] 12 Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 13 Ms Angle Iron ( 35X35x5 Mm ) , Length : ( 460 ) X 2 Nos 14 Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 950 Mm ) X 2 Nos For Bed Kneebracing 15 Transformer Lt Distribution Box And Go Switch Fixing Assembly 16 Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 2800 Mm ) X 2 Nos 17 Ms Angle Iron ( 50X50x6 Mm ) , Length : ( 450 Mm ) X 1 Nos 18 Go Switch Handle Supporting: [ Channel Iron ( 75X40x5 Mm ) , Length 460Mm 19 Go Ab Switch Unit ( 11Kv, 400A, 25 Ka ) Tripple Pole O / D Type Provided By Hpsebl 20 D.O Fuse Unit 21 Surge Arrester, 9 Kv Station Class ( Porcelain Type ) 22 Discs Insulator Sets ( Comprising 1 No. Disc: ^^ ( Porcelain, Bs, 12 Kv, 90Kn ) Including Dead End Clamps Etc. 23 Stay Set Completeprovided By Hpsebl 24 Stay Wire ( 7 / 3.15 Mm ) ( 7.0 Kg Per Stay Set ) Provided By Hpsebl 25 Pipe Earthing Set 26 With Acb ( 630A, 50Ka, 4P, 1No ) & Sfu ( 100A, 6No, Rewirable ) 27 Half Clamp ( M.S. Flat 50X6 Mm ) 28 Full Clamps ( M.S. Flat 50X6 Mm ) 29 Nuts And Bolts Of Various Sizes ( Galvanised / Coated ) [ Preferably 16Mm F Or More ( With Flat And Spring Washers ) ] 30 Aluminium Thimble 31 Aluminium Thimble 32 Danger Plate 33 Barbed Wire 34 Chain Linkfencing Angleirongate Etc For Transformerfencing 35 Lt Cable ( 3.5 Core ) 400 Mm² 36 L.T Cable 3.5 Core 70 Mm 37 Energy Meter ( 3-Phase, 4-Wire ) Dlms Compliant 600 A Ct Type For 400Kva Transformer 38 Aluminium Paint. 39 Red Oxide 40 Ct Pt Unit 41 Civil Work Complete In All Respect 42 Erection Charges 43 Transportation Charges 44 11 Kv Ht Line 45 Conductor ( Aaac ) 7 / 4 .26 Mm2 46 St Pole 11Mtr. Long W / L 200 Kg 47 St Pole 9 Mtr. Long W / L 200 Kg 48 St13 Mtr Long Pole 49 Rcc Muff Of 2000 Mm Length 50 A.I. Knee Bracing Set 2X ( 750X50x50 ) Mmsingle Pole 51 C.I. / F.G. X-Arm ( 1500X100x50 ) Mmfor Single Pole 52 C.I. X-Arm For Double Pole Structure ( 2400X100x50 ) Mm 53 A.I. Bracing Set For Double Pole Structure ( 1500X50x50 ) Mm & ( 2700X50x50 ) Mm. Each 2No. Per Set 54 11 Kv Pin Insulator With Pin Helically Formed Fitting 55 Disc Insulator Set ( Cleaves And Tong ) 56 Ht Stay Set Complete Including Provided By Hpsebl 57 Guy Assembly 58 Stay Wire 7 / 3.15 Mm ( @ 6.0 Kg Per Stay Set ) Provided By Hpsebl 59 Coil Earthing For Pcc / Steel Pole 60 Danger Plate ( 250X200x1.6 Mm ) 61 Earth Wire 8 Swg Gi Wire For Pcc / Steel Pole 62 M.S. Nuts And Bolts ( Off Sizes ) 63 Barbed Wire 64 Aluminium Paint 65 Go Switch Complete 66 Do Fuses Set Complete 67 C.I. X-Arm 2400X75x40mm For Go Switch & Do Fuse 68 Half Clamp 69 Full Clamp 70 12Kv, 1250 Amp 12.5Ka For 2 Sec ) Outdoor Kiosk Breaker Switch Panel 71 Errection Charges Of 13 Mtr Pole 72 Errection Charges Of 11 Mtr Pole 73 Errection Charges Of 9 Mtr Pole 74 Erection Charges 7 / 4.26 100Mm 75 Dismantling Charges For Removal Of Conductor De- Stringing, And Rolling Of Conductor 76 Errection Charges Of Stay Set 77 Errection Charges Of Earthing 78 Errection Charges Of Gi Wire 79 Errection Charges Of Vcb 80 Errection Charges Of G.O Switch 81 Dis-Mantling Charges For Removal Of Rcc Pole 82 Transport Charges 83 3-Ph Lt Line 84 Aaac Conductor 7 / 3.15Mm 50Mm2 85 S / T Pole 8 Mtr. W / L 140 Kg 86 Rcc Muff 87 C.I.X.Arm ( 600X75x40 ) Mm 88 Shackle Insulator 89 D-Iron. 90 X-Arm Clamp 91 Egginsulator 92 Eye Hook Bolt 93 Lt Stay Setprovided By Hpsebl 94 Stay Wire 7 / 3.15 Mm ( @ 6.0 Kg Per Stay Set ) Provided By Hpsebl 95 Coil Earthing 96 G.Iwire 8 Swg For Earthwire ( 1.03 Km ) 97 M.S. Nuts And Bolts ( Off Sizes ) 98 Aluminium Paint 99 Pvc Spacer 100 Tpt. Charges 101 Erectionfor St Pole 8Mtr Long 102 Erectionfor Aaac 7 / 3.15 50Mm 103 Erectionfor Stay Set 104 Erectionfor Erthing 105 Quantities Are Mentioned Above Are Tentative And Actual Quantity Shall Be Worked Out After Check Survey To Be Carried Out By The Successful Tender And Detailed Engineering And Finalization Of Tower Location Chart.Payment Shall Be Made As Per Approved Bill Of Material / Actual Quantities Measured At Site.

Key Value

Document Fees
INR 1180 /-
EMD
INR 59625.0 /-
Tender Value
INR 59.62 Lakhs /-

BOQ Items

Name of Work - Tender for Supply ofmaterial, design, erection, testing, commissioning forproviding SOP TO LWSS Chadhiar Khas & Multi Villages for Baijnath,Lambagaon & Panchrukhi Block UESD Chadhiar under ED Baijnath. ( SEOP-55/2023-24).
Sl. No. Item Description
1COST 400 (S/Stn)
211/0.4kV DISTRIBUTION TRANSFORMER 400KVA
3S/T POLE 9MTR.W/L200KG
4MUFF complete in all respect
5X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] forincomer line
6MS Angle Iron (50X50x6 mm), Length: (2800 mm) x1 Nos for LA"s
7X-Arm: [Channel Iron (75x40x6 mm), Length : (2800 mm X 4 Nos] for supporting DO fuse unit & GO switch
8Transformer Bed, Belting & Knee Bracing
9TransformerBed Civil work
10X-Arm: [Channel Iron (100x50x6 mm), Length : 2800 mm X 2 Nos] for Transformer bed
11X-Arm [Channel Iron (100x50x6 mm), Length : (460 mm) x 2 Nos for supporting Main Channel of Transformer]
12MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
13MS Angle Iron (35X35x5 mm), Length : (460 ) x 2 Nos
14MS Angle Iron (50X50x6 mm), Length : (950 mm) x 2 Nos for Bed Knee Bracing
15Transformer LT Distribution Box and GO Switch fixing Assembly
16MS Angle Iron (50X50x6 mm), Length : (2800 mm) x 2 Nos
17MS Angle Iron (50X50x6 mm), Length : (450 mm) x 1 Nos
18GO Switch Handle Supporting: [Channel Iron (75x40x5 mm), Length 460mm
19GO AB Switch Unit (11kV, 400A, 25 KA ) Tripple pole O/D type Provided by HPSEBL
20D.O Fuse Unit
21Surge Arrester, 9 kV Station Class (Porcelain Type)
22Discs insulator sets (comprising 1 No. Disc: ^^(Porcelain, BS, 12 kV, 90KN)including Dead End Clamps etc.
23Stay set completeProvided by HPSEBL
24Stay Wire (7/3.15 mm) (7.0 kg Per Stay Set)Provided by HPSEBL
25Pipe Earthing Set
26With ACB(630A, 50KA,4P, 1No) & SFU(100A,6No, rewirable)
27Half Clamp (M.S. Flat 50X6 mm)
28Full Clamps (M.S. Flat 50X6 mm)
29Nuts and Bolts of Various Sizes (Galvanised / Coated) [Preferably 16mm F or more (with flat and spring washers)]
30Aluminium Thimble
31Aluminium Thimble
32Danger Plate
33Barbed Wire
34Chain linkfencing angleirongate etc for transformerfencing
35LT Cable (3.5 Core) 400 mm²
36L.T cable 3.5 core 70 mm
37Energy Meter (3-Phase, 4-Wire) DLMS compliant 600 A CT Type for 400KVA Transformer
38Aluminium Paint.
39Red Oxide
40CT PT unit
41Civil Work complete in all respect
42Erection Charges
43Transportation charges
4411 KV HT LINE
45Conductor ( AAAC)7/4 .26 mm2
46ST Pole 11Mtr. Long W/L 200 kg
47ST Pole 9 Mtr. Long W/L 200 kg
48ST13 Mtr long pole
49RCC Muff of 2000 mm length
50A.I. Knee Bracing Set 2X(750X50X50) mmsingle Pole
51C.I./ F.G. X-Arm (1500X100X50) mmfor single Pole
52C.I. X-Arm for Double Pole Structure(2400X100X50) mm
53A.I. Bracing Set for Double Pole structure(1500X50X50) mm & (2700X50X50) mm. each 2No. Per set
5411 kV Pin Insulator with Pin Helically formed fitting
55Disc insulator set (Cleaves and Tong)
56HT Stay Set complete including Provided by HPSEBL
57Guy Assembly
58Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set)Provided by HPSEBL
59Coil Earthing for PCC / Steel Pole
60Danger Plate(250X200X1.6 mm)
61Earth Wire 8 SWG GI Wire for PCC/ Steel Pole
62M.S. Nuts and Bolts (Off Sizes)
63Barbed Wire
64Aluminium Paint
65GO Switch complete
66DO fuses set complete
67C.I. X-Arm 2400x75x40mm for GO Switch & DO Fuse
68Half Clamp
69Full Clamp
7012KV, 1250 Amp 12.5KA for 2 Sec ) outdoor Kiosk breaker switch panel
71Errection Charges of 13 Mtr Pole
72Errection Charges of 11 Mtr Pole
73Errection Charges of 9 Mtr Pole
74Erection Charges 7/4.26 100mm
75Dismantling charges for removal of conductor De- stringing, and rolling of conductor
76Errection charges of stay set
77Errection charges of Earthing
78Errection charges of GI wire
79Errection charges of VCB
80Errection charges of G.O Switch
81Dis-mantling charges for removal of RCC Pole
82Transport charges
833-ph LT line
84AAAC Conductor 7/3.15mm 50mm2
85S/T Pole 8 Mtr. W/L 140 kg
86RCC Muff
87C.I.X.Arm (600X75X40) mm
88Shackle Insulator
89D-Iron.
90X-Arm Clamp
91EggInsulator
92Eye Hook Bolt
93LT Stay SetProvided by HPSEBL
94Stay Wire 7/3.15 mm ( @ 6.0 kg Per Stay Set)Provided by HPSEBL
95Coil Earthing
96G.IWire 8 SWG for Earthwire (1.03 km)
97M.S. Nuts and Bolts (Off Sizes)
98Aluminium Paint
99PVC Spacer
100TPT. CHARGES
101ERECTIONFOR ST POLE 8MTR LONG
102ERECTIONFOR AAAC 7/3.15 50MM
103ERECTIONFOR STAY SET
104ERECTIONFOR ERTHING
105Quantities are mentioned above are tentative and Actual Quantity shall be worked out after Check Survey to be carried out by the successful Tender and detailed Engineering and finalization of Tower location Chart. Payment shall be made as per Approved Bill of Material/Actual Quantities measured at site.
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2024 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail